General Procedure : 1 This activity shall be carried out under competent supervision. 2. Area shall be Barricaded. 3. Unauthorized people entry
shall be prohibited. 4 Only trained personnel shall be allowed to carry out this work. 5. Job Safety plan shall be used to carry out the work. 6. All
Personel Protective Equipment shall be used as Per job required.
Personnel Injury & Property Provide proper PPE’s, Proper Material Stacking, Proper Access to
1 Manpower/Material Mobilization
Damage shift the Material
1. Non-Compliance with clients HSE 1. Obtain hot work & General work permit before starting the job
work procedures.
2. Poor task planning 2. Ensure work activity is complying with client HSE procedures
2 Pre - Work Planning
3. Convey the hazards and work planning through Tool box talk.
4. Ensure all persons are Inducted and had proper Training.
General Procedure : 1 This activity shall be carried out under competent supervision. 2. Area shall be Barricaded. 3. Unauthorized people entry
shall be prohibited. 4 Only trained personnel shall be allowed to carry out this work. 5. Job Safety plan shall be used to carry out the work. 6. All
Personel Protective Equipment shall be used as Per job required.
Name & Signature of Site Engineer / Supervisor :___________ Name & Signature of Site In-charge :___________
Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______