You are on page 1of 2

Rohan abuilders (India) Pvt.

Ltd
Project :-Sussen Asia Pvt.Ltd.Shirtwal
Job Hazard Analysis Sheet No. 2…... of ……1..

PROJECT / TASK: Bricks Messonary Work CONTRACTOR: RBIPL JOB No.:006

SUPERVISOR: Mr Vilas Kadam LOCATION: Road DATE:

JOB STEP HAZARDS Control Measure ACTION


Break the job into steps. List the hazard or type of harm List the necessary control measures to be Person who will
Listing work which may be hazardous. identified with each step followed to eliminate the identified hazards ensure this
happens

Storage of bricks Fall of bricks causing 1. Restrict height of stack of blocks


injury to 1.5 m.
2. Wear safety shoes.

Loading, transportation and a) Fall of bricks causing 1. Bricks should be stacked in cross
unloading of bricks to site injury. tier in the truck/tractor/ trolley.
2. Speed limit should be observed. Mr.R.A.
3. Use safety shoe.
b) Cut injury due to Bricks should be handled carefully Guttedar.
edges of blocks with gloves to avoid injury.
Preparation of cement mortar a) Improper handling of Training for handling method should
cement bags. be imparted.

b) Cement dust causing 1. Use gloves and dust mask while


allergy/eye/injury handling cement bags.
2. Wash eyes with clean water if
cement enters in eyes.
Laying of Bricks a) Fall of platform/fall of 1. Working platform should be
materials adequate (at least 900mm wide)
and securely tied with the
scaffolding.
2. No worker should be allowed to
work under the area where
masonry work is in progress.
3. Loose bricks should not be left on
the wall or on working platform
at the end of the day. All placed
blocks should be joined with
cement mortar.

b) Allergy to hand due to Gloves should be used to protect


use of cement mortar. hand.
Mr. Dhake, Mr.R.A.Guttedar, Mr.Vinod
Job Hazard Analysis Attendees:
Narkhede

Name Signature Date

Written by: Safety Officer RBIPL Mr. Dhake

Site Engineer: Mr.R.A.Guttedar

Reviewed by: Project Manager


Mr.Vinod Narkhede
RBIPL

SAPL Officer / Engineer:

You might also like