JOB SAFETY ANALYSIS FOR ERECTION OF EXCHANGER
Page 1 of 5
Lifting arrangement for properly before lifting the
exchanger by 400 MT Crane. Hand tools, lifting
material.
Lifting tools & tools.
2.4.1Erection scheme plan
tackles, Rigger. 3 Falling of
should be provided for lifting of
loose
exchanger.
materials
while 2.4.2 Only qualified Rigging
lifting. crew must be deployed.
4. Critical 2.4.3All lifting gears must be
lift. inspected and certified. Prior to
use any lifting gear, a pre
5. Injury
inspection to be conducted.
due to
pinching or
crushing. 2.5.1Communicate the pinching
hazards through JSTI before
lifting.
Page 2 of 5
4.1.1Ensure person should wear
double lanyard full body harness
while climbing on ladder.
4.1.2Persons should always have
100% tie off.
1. Fall of
person
Work at height for sling Hand tools 4.2.1Provide ladder for approach
opening from
of sling opening with fall arrestor
height.
rope..
2. Improper
4.2.2 Rungs of all ladder should
housekeepi
4. H be clear from any oily, dust to L Site engineer
ng will lead
avoid slip & fall hazard.
to slips and
fall at
ground
level.
Page 3 of 5
6.2.3 Ensure availability of First aid
gases.
box at workplace.
3. Highly
6.3.1Ensure the velocity of wind
wind speed.
speed should no more than 20 MPH.
4. Series of
6.4.1Ensure fire extinguisher &
fire.
running water hose near work
location.
1) Instruction should be given for “NO SMOKING” and ensure that no fire/ hot work occurs nearby.
2) Tools & nails are to be kept in a toolbox never carry the nails in bags or in pockets.
3) Materials shall be kept in arrange way on the ground. The foreman shall ensure good housekeeping.
4) Tie the lifeline while making beam bottom at the outer side.
5) Support the lifeline at every 5 m length.
6) Helpers should not be allowed to work at outer side.
7) Ensure access wherever you work.
8) Check for defective tools.
9) The included angle for the ladder is 75 degree and the ladder should extend at least 1 m beyond the landing platform.
10) The ladder must be secured at the top and bottom. Do not use top rung or top step of the ladder.
11) Never use brittle materials like brick as a packing material for shutter supporting towers.
12) Do barricading/Identified/highlight while doing breaking work at outer side.
13) While demolition keep one helper to remove the nails and stack the shutters properly (neatly) and ensure proper access.
Page 4 of 5
14) 1/3 of portion of the tower only can be projected beyond periphery of the slab as cantilever.
15) In such cases the Wallers to be secured by hooks embedded in concrete.
16) Props used at periphery must be braced adequately.
17) Required permit should be available at work place.
Page 5 of 5