New King Abdulaziz International Airport Development Project

(Phase I)
Jeddah, KSA

ACCIDENT PREVENTION PROGRAM


Zone: Assessment Date : Assessment Team: SBG-HSE
Activity : Transformer Installation Risk Assessment No.: Assessment Author : SBG-HSE
HAZARD EFFECT Reduced
TASK HAZARD C L RISK MITIGATED BY C L Alarp
( Consequences ) Risk
Possible fatality,
damage to Appropriate traffic management in place
Transporting of Vehicle collision
infrastructure, vehicles including speed limits. Site inductions to
materials on access roads & transported explain importance of traffic management.
materials.
Injury to Personnel
Dislocation of skeletal Proper poisture when handling of heavy
Material Handling & Damage to
property bones to workers. materials are required.
All Heavy equipment lifted by crane shall be
vigilantly supervised and obtain an approved
Property damage, critical lift plan prior to any critical lifting, only
Equipt. Damage,
Heavy Equipment & fatal injury to certified lifting gears shall be engaged, wire
Serious injury to
Critical Lifting personnel, damage rope/sling log book to be maintained at the job site
personnel & spotter shall be available during all operations.
to equipment
equipment register shall be duly circulated/
approved by safety department.
1.use safe scaffold that is inspected & checked by
the certified inspector.
Falling Serious injuries 2.use full safety body harness with lanyard and is
Works on Scaffolds anchored safely during work.
1.barricade the working area.
Falling Objects Injuries 2.use safety signs to warn all people or cars
around the working area.
Headache, Vomitng, 1. Take rest
Heat Stress 2.Drink water every 20 minutes
Illness
Outdoor Works
Bad Weather Injury, Broken bones Cancel Activity during bad weather
Work Area should be monitored by Safety officers.
PPE to be worn by all operatives performing the job for all duration of work.
Provide fire extinguisher in case of any emergency.
All Work area should be cleaned after work done.
All work area should be secured and barricade to protect the workers from the moving vehicles.
Proper signs should be installed on the working area + Flagman to direct the moving vehicles.

Page 1 of 2
New King Abdulaziz International Airport Development Project
(Phase I)
Jeddah, KSA
ACCIDENT PREVENTION PROGRAM
Zone: Assessment Date : Assessment Team:
Activity : Transformer Installation Risk Assessment No.: Assessment Author :
HAZARD EFFECT Reduced
TASK HAZARD C L RISK MITIGATED BY C L Alarp
( Consequences ) Risk
All Power tools to be handled carefully
to avoid personal injuries, wherever
Power tools Electric shock Serious injury possible, safeguards shall be fitted to the
equipment . only trained & certified
operators to use power tools.
Emergency Phone numbers shall be
posted in site office and educate the
Fire Protection Personnel Injury & Damage employees to use the emergency
Fire Hazard numbers in case of emergency.
& Prevention to Property
Adequate number of Fire Extinguishers
shall be provided and fire watch
personnel shall be assigned.
All workmen to be properly trained
before taking part in any electrical work.
ground fault circuit interrupters are to
Electrical works Fall Hazard Personnel Injury be installed properly on all circuits. All
activities shall be planned and with work
permits approved by Safety dept.
Toilet must be available to employees
Sanitation & Environmental Health & Environmental At each work location shall be available.
housekeeping Hazard hazard To be kept clean by regular routine
service. Disposal to be arraigned daily.

Work Area should be monitored by Safety officers.


PPE to be worn by all operatives performing the job for all duration of work.
Provide fire extinguisher in case of any emergency.
All Work area should be cleaned after work done.
All work area should be secured and barricade to protect the workers from the moving vehicles.
Proper signs should be installed on the working area + Flagman to direct the moving vehicles.