TITLE OF THE

ACTIVITY: Construction of Precast Chambers


Asses.
Assessment Number: QRC-RA- Revision Date: 00 Page Number: 1 of 5
Date:
INITI CONTROL MEASURES RISK
RISK FINAL
AL (EL – Elimination, RE – Reduction, IS – RATIN
RATING RISK
TASK STEP HAZARDS RISKS RISK Isolation, EC – Engineering Control, AC – CONTROLLER G
LEVE
LEVE Administration Control, PPE – Personal R
S L RR S L L
L Protective Equipment) R

 Lack of
 Safety orientation to workers, tool box talk to worker
communication.
period to commencement of activity.
 Inadequate
 Injury to personnel  Ensure site engineers and foremen are aware of
General Preparation procedure used
 Heavy rain weather condition. Site in charge,
(surveying)  Incompetent 3 3 6 M 1 3 3 L
 High wind  Ensure safety warning signages are display around project engineer
 Unskilled
the working area.
personnel
 Provide shelter to the workers.
 Weather
condition
 Poor  Skill personnel should be employed
communication.  Difficult to response in an  The worker should understand the local language.
 Personnel with emergency.  Ensure young workers should be monitor by a
Mobilization of personnel Partial  Failure to follow work competent foreman. Foreman/site
2 2 4 L 1 2 2 L
disability, place safety.  Safety awareness training should be given to all engineer
young workers  Poor execution of workers.
 Less experience structure.  Ensure worker are medically fit to carry out their
personnel task.
Loading, transportation of  Damage of  Injury to personnel 2 4 8 M  Trained certified operator and rigger, using tagline Site engineer 1 4 4 L
precast manhole and equipment, loss  Hit by load, falling of load  Ensure equipment suitable for the task and competent
installation of production.  Inappropriate lifting and supervision standby, full body PPE must be worn.
 Injury due to slinging techniques.  Barricade the area, conduct tools box and inspection
manual  Hydraulic oil leaks of lifting equipment/accessories.
handling of  Vehicle movements at site  Ensure all materials selection should be in standard of
materials incorrect equipment used construction.
 Harm and to install precast units into  Materials should storage in a designated area and
fingers cut trench. fully barricaded.
injury.  Equipment too close to the  Ensure unloading of materials should be under
 Falling object edge of trench causing supervision of a foreman.
from height. collapse of trench.  Ensure regular maintenance of vehicles
TITLE OF THE ACTIVITY: Construction of Precast Manhole
Asses.
Assessment Number: QRC-RA- Revision Date: 00 Page Number: 2 of 5
Date:
RISK CONTROL MEASURES RISK
INITIA FINAL
RATING (EL – Elimination, RE – Reduction, IS – RATING
L CONTROLLE RISK
TASK STEP HAZARDS RISKS Isolation, EC – Engineering Control, AC –
R RISK R R LEVE
S L Administration Control, PPE – Personal S L
R LEVEL R L
Protective Equipment)
 Speeding of
vehicle at the  Manal handling training to all personnel to carryout
working area. loading and unloading activities.
 Poor  Vehicles should be overloaded.
maintenance of
 Provide proper warning sign board.
vehicle and
 Make sure all access is clear before start activity.
heavy
equipment.
 Ensure proper PPE must be worn (helmet, safety
 Toxicity, shoes, coveralls, goggles, hand gloves) and follow the
handling of  Physical effect in human instructions as per MSDS.
Usage of chemicals chemical, body  Ensure that MSDS of chemical are available at
(epoxy coating) bitumen improper  Chemical burns to the site/store, all the chemicals waste will be segregated
2 3 6 M Workmen 1 3 3 L
board, water proofing. access/ egress. users and disposed as per DM
 Environmental  Suffocation, contact with  Personal hygiene should be maintained by all
pollution, fire skin and eyes. workers.
hazards  MSDS should be communicated to all through TBT
and provide required first aid kit.
 Adverse  Briefing personnel on the symptoms of heat stroke /
 Employee
weather stress and ensure close supervision standby,
collapses/
condition, monitoring workers
Working in extreme requiring medical
heavy wind,  Training first aider on duty at all time.
weather conditions attention/ death, 2 4 8 Workmen/foremen 1 4 4 L
dust, storm,  Shift rotating workers and regular shot rest periods /
heat stroke,
extreme heat, cool hydration drinks.
 Dehydration heat
humidity and  Working hours will be review based on Dubai
cramps sunburn.
poor visibility Municipality summer timings
Pouring of concrete  Fall from  Personnel injury 2 3 6 M  Ensure shoring is in place and check by competent Site in charge, 1 3 3 L
height personnel. project engineer
 Falling of  Do not overload the mortar pan.
object overload.  Ensure concrete mixer machine is not keep near the
TITLE OF THE ACTIVITY: Construction of Precast Manhole
Asses.
Assessment Number: QRC-RA- Revision Date: 00 Page Number: 3 of 5
Date:
RISK CONTROL MEASURES RISK
INITIA FINAL
RATING (EL – Elimination, RE – Reduction, IS – RATING
L CONTROLLE RISK
TASK STEP HAZARDS RISKS Isolation, EC – Engineering Control, AC –
R RISK R R LEVE
S L Administration Control, PPE – Personal S L
R LEVEL R L
Protective Equipment)
edge of the excavation area
 Provide ladder for access and use manual handling
technique to carry smaller load.
 Provide barriers and handrail to prevent slip, trip and
fall.
 Fall fr5om
height.
 Falling object.  Ensure all scaffolding materials should be transferred
 In adequate from lower level to higher level through buckets
experience  Ensure scaffolding erection should be monitored by a
Erection of scaffolding  Injury to personnel Workmen, site in
scaffolder 2 4 8 M competent supervisor. 1 4 4 L
scaffolding collapse. charge, safety officer
 In adequate  Scaffolding tubes should not have any bends.
base plate.  Ensure safety harness must be worn at all time while
 In appropriate working at height
bracing for
scaffolding
 Improper  Ensure competent supervisor and adequate inspection
storage of provided training instruction, conduct tool box
reinforcement meeting prior to start the job and usage of appropriate
bars PPE.
 Inhalation of  Injury to personnel, back  Ensure toolbox training to all the workers, on work at
Installation of precast
particles ache. height/lifting and the use of PPE at site.
units and support 2 10 20 H Workmen 1 10 9 M
 Fall from  Back sprain  Ensure all worker are using safety harness to avoid
height fall from height and adequate warnings signs in place.
 Slip, trip and  Safe working platform should be provided, guard
fall rails should be in place
 Lack of training  Ensure proper access egress (Ladder provided and
and experience. secured)
TITLE OF THE ACTIVITY: Construction of Precast Manhole
Asses.
Assessment Number: QRC-RA- Revision Date: 00 Page Number: 4 of 5
Date:
RISK CONTROL MEASURES RISK
INITIA FINAL
RATING (EL – Elimination, RE – Reduction, IS – RATING
L CONTROLLE RISK
TASK STEP HAZARDS RISKS Isolation, EC – Engineering Control, AC –
R RISK R R LEVE
S L Administration Control, PPE – Personal S L
R LEVEL R L
Protective Equipment)
 Ensure worker should take extreme care while
working on wet soil.
 Movement of  Fatality or injury to  Curing should be done in a specific time.
Curing of precast units. water tanker workers, damage to  Operators /driver should have valid license, relevant Site in charge,
2 3 6 M 1 3 3 L
 Slip/Trip machinery, vehicle and certificates for equipment and vehicle. project engineer
 Wet soil property.  Ensure flagman standby, control the movement of
water tanker, reverse alarm and light should be in
good working conditioned

RR: Risk Rating Likelihood


Likelihood (L) (LxS)
Severity (S) RISK LEVEL =
(% of Compliance) Resultant Risk Level 0 1 2 3 4 5
being either High,
Medium or Low.

1 91 to 100 1 First-aid case 1–4 Low 1 1 2 3 4 5

2 81 to 90 2 Minor (Hospital referred) 2 2 4 6 8 10

Severity
5 – 10 Medium
3 71 to 80 3 Reportable (3 - 21 days medical rest) 3 3 6 9 12 15
4 25 to 70 4 Major (Hospital admission/≥21 days medical rest 4 4 8 12 16 20
12 - 25 High
5 0 to 24 5 Fatality 5 5 10 15 20 25

Legal Reference: Chapter 5, Federal Labour Law (8), UAE 1980/ Ministerial Order No. 32, UAE 1982/ Code of Construction Safety Practice, Dubai 2008
TITLE OF THE ACTIVITY: Construction of Precast Manhole
Asses.
Assessment Number: QRC-RA- Revision Date: 00 Page Number: 5 of 5
Date:
RISK CONTROL MEASURES RISK
INITIA FINAL
RATING (EL – Elimination, RE – Reduction, IS – RATING
L CONTROLLE RISK
TASK STEP HAZARDS RISKS Isolation, EC – Engineering Control, AC –
R RISK R R LEVE
S L Administration Control, PPE – Personal S L
R LEVEL R L
Protective Equipment)

Prepared by Approved by
Workmen Representative
Risk Assessment Committee/ HSE Management Representative/ Project Manager

Name & Name & Name &


Designation Designation Designation

Signature Signature Signature