TITLE OF THE ACTIVITY: Construction And Installation Of Manhole (Precast)
Asses.
Assessment Number: QRC-RA-001 27/10/2022 Revision Date: 00 Page Number: 10 of 10
Date:
RISK CONTROL MEASURES RISK
INITIA FINAL
RATING (EL – Elimination, RE – Reduction, IS – RATING
L CONTROLLE RISK
TASK STEP HAZARDS RISKS Isolation, EC – Engineering Control, AC –
R RISK R R LEVE
S L Administration Control, PPE – Personal S L
R LEVEL R L
Protective Equipment)
Legal Reference: Chapter 5, Federal Labour Law (8), UAE 1980/ Ministerial Order No. 32, UAE 1982/ Code of Construction Safety Practice, Dubai 2008
Prepared by Approved by
Workmen Representative
Risk Assessment Committee/ HSE Management Representative/ Project Manager