ABU DHABI GAS DEVELOPMENT COMPANY LIMITED

SHAH GAS DEVELOPMENT (SGD) PROGRAM


RISK ASSESSMENT and WORK INSTRUCTIONS

Task/Activity Description: Road Marking Works Reference N0: EPC10-RA -161-R1


Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 19/11/15
Page 1 of 5

Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsibl
No (Pre Controls) (Post Controls) e Person

Risk Rating

Risk Rating
Probability

Probability
Categories

Categories
Severity

Severity
 All employees must attend site induction training and job
specific training.
 Ensure that, all Survey instruments have valid calibration
certificates.
 Deploy only physically fit employees to manual handle
Manual survey tools
Handling Sprain, Back  Ensure all personnel involve on the activity wear
Supervisor/
operation of Pain, 3 C P M mandatory the P.P.E such as (Hi-vest, Helmet, safety 1 A P L Foreman/
1.
hand tools and WRULDs shoe, spectacles. Employees
survey  Must conduct TBT prior to start the work.
instruments  Use vehicle to transport surveying instruments for long
distance
 Adopt good manual handling techniques.
 Ensure that, all employees are briefed thoroughly on road
safety and precautions to take where there are many
moving equipment.
Dust and  Use of dust mask and safety spectacles.
Silicosis, ill 3 C P M 1 A P L
All
2. gases from  Avoid carrying out survey in a serious windy, foggy, mist, Staff/Workers
health
flaring stormy or raining day.
3. Heat stress Dehydration, 4 C P H  Provide cool-drinking water and oral rehydration products, 1 A P L Site
Heat  Stand-by vehicle Supervisors/F
oreman
Exhaustion,  Frequent rest breaks for workers working under sunlight
Heat Stroke during peak hot hours.
 In case of illnesses occur during the activity ensure to
follow the Emergency Response Plan.
 Ensure that, all employees are heat stress trained and
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS

Task/Activity Description: Road Marking Works Reference N0: EPC10-RA -161-R1


Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 19/11/15
Page 2 of 5

Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsibl
No (Pre Controls) (Post Controls) e Person

Risk Rating

Risk Rating
Probability

Probability
Categories

Categories
Severity

Severity
possess personal Igloo with them at all times.
 Chilled and normal water must be provided at all times.
 Supervisor/Foreman must maintain the daily rest timings in
the heat stress rest record and follow the flagging system.
 Secure Permit prior to start work.
 Pre-start walk around check and daily start up checklist to
be done and recorded / documented.
 Ensure all heavy equipment vehicles shall be fitted with
amber lights and reverse beckons back-up alarms.
Accidental  Ensure adequate supervisors are available during working
knocking hours
Parked up over of 3 B P/A M  Parking brake to be applied. Wheels to be blocked if 1 A L P/A Operators
4.
Equipment personnel parked on inclines.
Damage to  Only competent and certified personnel to be allowed to
property. start & operate plant and equipment.
 Only reverse parking shall be allowed at site and deploy a
trained and dedicated flagman for the moving equipment in the
work place.
 All equipment Operators must follow the site speed limits and
signage posted at site to prevent accident from occurring.
Movement of  Provide deceleration lane close to the speed/live track &
equipments/tru provide a sign board ‘
Collision with Operators/
cks from Live 4 C P H  Access Constructions Vehicles Only’ and flagman for 1 A P L
5. public guiding the vehicles into construction area. Supervisors
road to
vehicles  Minimum speed limit to be strictly followed.
construction
area. Sudden  Heavy equipment check list to be followed before start of
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS

Task/Activity Description: Road Marking Works Reference N0: EPC10-RA -161-R1


Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 19/11/15
Page 3 of 5

Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsibl
No (Pre Controls) (Post Controls) e Person

Risk Rating

Risk Rating
Probability

Probability
Categories

Categories
Severity

Severity
turn from live activity.
road to  Prevent taking rest & sleeping underneath the plant.
construction  Driver / Operator to check the persons below the plant /
area equipment before starting.
Back  All staff should be HSE inducted.
Site
Uneven loads strain/Medic  Mechanical aids to be used where possible. Supervisor/Fo
6. Poor al complaints 3 C P M  Job rotation for lifting tasks. 1 A P L
reman/Charg
Techniques Personal  Stack hazardous materials in a well ventilated area. e hand
Injury  Selection and used of appropriate PPE.
 First-aid box and trained first aider onsite should be
available during night working hour.
Inadequate  Emergency response should be in accordance with the
emergency project emergency response plan.
Death / Engineer/
response and 3 C P M  Emergency contact number will be posted at site. 1 A P L Superviso
7. extensive
arrangements Emergency contact numbers are available with the HSE r/Foreman
loss Plan.
Poor
communication  Emergency vehicle to be available during working hour.
 Communication by mobile.

Work Instructions:
1. All hazard control measures prescribed in this Risk Assessment is issued as a work instruction to be implemented by site Supervisor.
2. All persons and vehicles must comply with Site HSE Rules and Requirements.
3. Under no circumstance shall any person will work under suspended load / bucket while manually handling/ loading / offloading from equipment.
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS

Task/Activity Description: Road Marking Works Reference N0: EPC10-RA -161-R1


Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 19/11/15
Page 4 of 5

Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsibl
No (Pre Controls) (Post Controls) e Person

Risk Rating

Risk Rating
Probability

Probability
Categories

Categories
Severity

Severity
4. Hand brake to be applied when workers are working near equipment for lifting/ transferring load to and from the equipment
5. Do a tool box talk with all site supervisors, operators and operatives. Explain these control measures to all relevant operatives.
6. Housekeeping to be done and workplace to be made safe prior to leaving the workplace.
7. All persons shall sign their understanding and confirmation in the Tool Box Talk attendance sheet.
8. All construction waste will be removed daily from the work area.
9. All Near Misses and Accidents will be reported immediately to the on-duty Medic and site safety officers
10. Copy of this RA will be discussed in pre- start TBT. Copy will be available on site.
In Case of emergency, contact ASCON 24 Hour Emergency Numbers - 0566848083 or 0566848220

Prepared by Name Date and Signature Approved by Name Date and Signature
Construction HSE Manager Izhar Baig
Manager
Project Engineer Issued by Name Date and Signature
Sr EHS Officer DIeudonne Chrameh Project Manager Joseph.P
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
SHAH GAS DEVELOPMENT (SGD) PROGRAM
RISK ASSESSMENT and WORK INSTRUCTIONS

Task/Activity Description: Road Marking Works Reference N0: EPC10-RA -161-R1


Note : Risk Assessment Matrix adopted from ADNOC-CoPV5-06 Date of Issue: 19/11/15
Page 5 of 5

Risk Hazard Risk/Impact Risk Assessment Control Measures Risk Assessment Responsibl
No (Pre Controls) (Post Controls) e Person

Risk Rating

Risk Rating
Probability

Probability
Categories

Categories
Severity

Severity