All activities shall have their risk assessed in order to determine actions and conditions to be put in place in order to eliminate or reduce the risk.
The risk assessments shall be passed to the workers doing the work so that they will be familiar with the risks present and what they have to do to reduce them.
Project: : Activity: Sheet: Completed By: Date:
of TRIAL PITS
Project No: 62297 People affected / at risk of being harmed: Al Bawani Workers, Consultant Representative, Concrete Supplier Personnel
MINIMUM PPE TO BE WORN FOR TASK AS WELL AS PER SITE REQUIRMENT PPE
PPEs Fall of equipment and Check soil quality and suitable surface for
personnel. parking mobile equipment and where required,
ensure shoring prior sending operatives to
Damage due to no excavated area.
personnel protection.
Ensure all operatives, staff and visitora are
wearing mandatory PPEs while entering to
work site.
Equipment operations Lack of knowledge and Only trained and authorized operatives are Conduct pre start meeting
experience could result in allowed to operate equipment.
Untrained operators failure of Mobile equipment Record findings of
operation. Operators must be trained by 3rd party and equipment
Unauthorized Operators available with competency certificate/License
Collision between mobile PPE to be worn.
Movement of mobile equipment or with All equipment shall be inspected by 3rd party
equipment. personnel. and available with certifications/License. Ensure Supervision.
Laceration due to sharp Ensure manual tools are inspected and color
manual tools. coded . No home made tools are allowed at
site.
Lungs damage due to Regular rest breaks for the operative involved.
inhalation of silica,
Control dust with regular sprinkling.
hand arm vibration
syndrome due to prolong Health surveillance of operatives are being
exposure to vibration. carried out of operatives involved.
Adverse weather Flooding and collapse of Weather forecast shall be regularly monitored. Training on heat stress and
Conditions excavation due to rain stroke
Work shall be stopped where weather
Rain Heat stress, Heat exhaustion conditions put workers at risk I.e flood, storms Heat stress campaign
and heat stroke due to work in
Storm , Cold drinking water and rest shelters shall be Daily health checks
high heat index.
provided at work site.
High heat and humidity.
Work will not continue in summer restricted
hours unless proper arrangements are made.