Hazard Identification and Risk Assessment – HIRA

CSP # 1650 Project Name Related Documentation/ Legislation

Routine Non-Routine Emergency Task/Activity: CONSTRUCTION OF EARTH WORK ROAD (Tertiary Roads) RA No: RA-CVL-01 REVISION 02
RISK ASSESSMENT RISK CONTROLS
Original Risk Original Risk With Residual Risk With
Without Controls Present Control Additional Control Measures Additional Control
SN Hazard Identified Affected Person Risk Risk Control Measure Already in Use
S L Rate S L Rate Needed S L Rate
(1-5) (1-5) (1-5) (1-5) (1-5) (1-5)
 Ensure all workers received induction training prior to
deploy on site
 Conduct toolbox talk meeting to all workers
Potential may be  Awareness training shall provide to all workers
Potential for Slip, suffer injuries such  Workers should be constantly reminded to remain
1 Workers/Drivers 3 3 9 3 2 6
Trip and Fall as fractures or vigilant and alert
bruising  Maintained good housekeeping
 Proper supervision is a must
 Drivers/workers must wear strong, comfortable
footwear with a good grip

 All ground workers shall wear high visibility vest


 Vehicle and heavy equipment must equip an audible
back-up alarm, and has to inspect frequently and
maintain it to ensure that it is in good condition prior to
Potential of being operating.
Workers and others  Maintain a safe distance from operating equipment. All
struck by or caught Workers/driver and
2 may suffer serious, 4 3 12 ground personnel must establish eye contact with the 4 2 8
in between others
possible fatal, injury operator when approaching or being near heavy
equipments
equipment
 Provide to all concerned employees adequate hazard
awareness information on vehicle/heavy equipment
operation, including information on the consequences
associated with being in the vicinity of vehicle/heavy

REV-02 Page 1 of 3
Hazard Identification and Risk Assessment – HIRA

Routine Non Routine Emergency Task/Activity: CONSTRUCTION OF EARTH WORK ROAD (Tertiary Roads) RA No: RA-CVL-003 REVISION 2

RISK ASSESSMENT RISK CONTROLS


Original Risk Original Risk With Residual Risk With
Without Controls Present Control Additional Control Measures Additional Control
SN Hazard Identified Affected Person Risk Risk Control Measure Already in Use
S L Rate S L Rate Needed S L Rate
(1-5) (1-5) (1-5) (1-5) (1-5) (1-5)
equipment
 Conduct pre-job communication meetings on site prior
to starting work to discuss relevant hazards, procedures
and assignments during job execution
 Personnel shall not rest or sleep (e.g., seek shade) under
or around mechanical or heavy equipment at any time
 Temporary traffic control measuress must be taken
based on traffic management plan to ensure the safety
during man machine interfering
 All employees who are or may be exposed to potential
heat related illnesses will receive training on Heat Stress
Programme
 Heat Stress Management Program shall be developed to
provide workers with the training and equipment
necessary to protect them from heat related exposures
Heat stress, heat and illnesses
Exposure to hot stroke, sunburn, skin  Cool water should be readily available during warm
3 Site workers 4 3 12 4 2 8
weather condition allergies and eye weather on in hot work areas
injuries  Ensure when working on high temperature jobs,
consideration should be given to working in pairs with
each person watching out for early warning signs of
excessive heat stress in the other person
 Proper supervision during working on hot areas
 Ensure wear a proper PPE during hot weather such as
light clothes
 Heat monitoring fagging system should be available
to aware the workers about temperature
 All workers shall be given a induction training prior to
deploy to site
 Ensure dust control procedure are being implemented
4 Dust & Fumes All workers Health Issues 3 3 9  Proper supervision is a must 3 2 6
/Others  Ensure that workers performing the task are equipped
with the necessary PPEs, such as a safety glass and dust
mask
 Sprinkling water should be done before the start of the
work if the works are within 300 mm of residence or
sensitive receptor
Page 2 of 3
Hazard Identification and Risk Assessment – HIRA SFHI09-02
Routine Non Routine Emergency Task/Activity: CONSTRUCTION OF EARTH WORK ROAD (Tertiary Roads) RA No: RA-CVL-003 REVISION 1

RISK ASSESSMENT RISK CONTROLS


Original Risk Original Risk With Residual Risk With
Without Controls Present Control Additional Control Measures Additional Control
SN Hazard Identified Affected Person Risk Risk Control Measure Already in Use
S L Rate S L Rate Needed S L Rate
(1-5) (1-5) (1-5) (1-5) (1-5) (1-5)
 Conduct pre-job communication meeting on site prior to
starting work to discuss relevant hazards, procedures
5 Handling chemicals All workers Ill Health 3 2 6 and assignments during job execution specially of 3 2 6
handling chemicals
 Ensure MSDS are available of each chemicals and
workers are aware what chemicals their using
 Proper supervision is a must
 Ensure to use the appropriate PPEs required
 Ensure that workers performing the task are equipped
with the necessary PPEs
6 Noise Workers / Hearing loss 3 2 6  As the KSA law: It is prohibited to carry out (noisy) 3 2 6
others construction work before 7 Am and after 6 Pm on
all days
 Provide information instruction and training to the
workers involve
 Proper supervision is a must
• Ensure that workers performing the task briefed on the
Crossing the H&C controls
restricted area
• Provide information instruction and training to the
Environmental workers involve briefed on the H&C controls.
pollution
• Proper supervision is a must briefed on the H&C
Crossing the Changing natural controls.
7 All employees features 3 3 9 3 2 6
restricted area H&C • All workers shall be given a induction training prior to
Tampering with the deploy to site briefed on the H&C controls.
environmental and
• Proper supervision is a must
heritage surroundings
or changing • Post signage multi language ( H&C BOUNDARY do not
landmarks cross) indicating that they must not be crossed the
H&C, in addition to the warning orange net .

• Provide information instruction for the workers


regarding this area.
Working in remote Poor communication
8 All employees 3 3 9 • Ambulance will be taking tour all the time to make 3 2 6
area Emergency not report sure for any emergency or medical treatment.
• Post the signage with multi language (No Signal).

Page 3 of 3