You are on page 1of 3

Risk assessment

Brief description of work


No./PTW No.

Location of work Project name IBRI-IPP MS Ref. No.

Assessed by NISHAD K.A & TAMILARASAN Date of input

Review cycle Where any significant change to work or environment occurs, a through review of their risk assessment must take place.

Current Risk Final risk


Item Task Activity Potential Hazards Con Ris Control Measures
Prob Cons Prob Risk
s k

1 Usage of Chipping of Injury from sharp 2 4 8 TBT on safe use of power tools and provision of good quality tools. 1 1 1
Power Tools concrete surface edges/ striking Ensure inspection of power tools prior to use.
objects. Ensure to keep other workers away to avoid accident from power
Slip, trip & fall while tools movement.
using of power tools. Adequate space ensured between personnel while using power
Injury due to falling tools.
tools from height. Only 110 volt hand operated power tools shall be used.
Injury due to flying Do not carry/lift the power tools from its cable.
particles. Ensure periodic inspection and maintenance of power tools by
Electrocution/Fatality. competent electrician.
Injury due to rotating ELCB fitted in 110v circuit and is serviceable.
parts contact to body Proper cable management ensured.
parts. Ensure competency of person before using a power tool.
Injury to nearby Avoid using tools standing on slippery, uneven surfaces and over
personnel. loose objects.
Ensure to use appropriate PPE.
Lifting by Light pole lifting Serious injuries/ 4 4 16 The crane/Hiab operation shall be planned properly. 2 1 2
using crane / by crane/hiab. fatality by crane over Ensure lifting permit to be obtained.
hiab. turn. Operatives shall be briefed about hazards of crane operation.
Hit by load. Ensure the Crane/ Hiab is inspected and certified by a third party.
Failure of suspended Provision of 3rd party certified rigger/ slinger.
load to people/ Web slings must be inspected at each shift and defective slings to
assets. be taken away from site and disposed.
Crane collapse due to Lifting equipment / accessories shall be inspected and certified by
ground settlement. a third party.
Fuel/ oil leakage Serviceability of crane shall be ascertained prior to task. All
Current Risk Final risk
Item Task Activity Potential Hazards Con Ris Control Measures
Prob Cons Prob Risk
s k

from accidents. controls and SWL indicator/limit switches must be fully


Personal accidents serviceable.
from failure of lifting Crane shall be placed on a well compacted/ levelled ground.
accessories. Outriggers fully extended and pads used underneath jacks.
Swing area barricaded and hazard warning placed.
Crane shall be position away from edge of excavations.
Crane operator must have valid driving license and third party
certificate.
Fire extinguisher available in the crane.
Crane operator and the rigger fully conversant with hand signals.
Wind shields of the crane shall be clean to get good vision.
During inclement weather lifting ops. To be stopped if wind speed
is 9 m/s.
No one to be allowed go below a suspended load.
Tag lines to be used for placing/ guiding loads
Ensure slings are used at correct location between the poles to
ease erection.
Always rise the load 1 mtr above to ensure slinging is in balance
and then only proceed lifting.
Smooth and steady movement of lifting permitted.
In case of road closure adequate alternative arrangements shall be
provided to ensure flow of other traffic and traffic wardens
provided.
Working at General Trip & Fall. 5 2 15 Sufficient illumination should be ensured before starting the
Night Injury to personal activity
Property damaged Monitor of continues supervision
Working of alone should be avoided
Usage of appropriate working platform
Proper signaling should be ensure during lifting activity
Obtain night work permit
Tool box talk should be commencing before starting the activity.
Area to be barricaded with sign boards
Use of appropriate PPE’s
PREPAID BY:TAMILARASAN APPROVED BY: