JOB TITLE / AIM: JSA for construction of batter protection along road barrier
JSA DATE: 1/3/2007 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: Iqbal Zaffar SCRIBE: Abdullah Khan
PARTICIPANTS: Mehboob
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of tools & workers
2 Trimming of slope
3 Brick Masonry for Toe Beam
4 Bricks laying on slope & ground level
5 Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of tools & workers and Unauthorised tools brought to site Before mobilizing any tool make sure that the E
material &P Personnel got inspected the tool.
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.

Workers starting the job unfit to work All personnel must undergo the fitness exam from
DEL company doctor & if not fit to work shall not
be allowed to work at the project site.
Workers starting the job without permit JSA must be in place prior to work. Ensure all the
persons take part in the toolbox meeting
discussion. All Persons must sign at the back of
JSA.CWP shall be obtained from OPS.
Hand Injury Ensure proper hauling of materials/get help if
required/Wear hand gloves.
Fall of tools/material Ensure proper stacking of materials
No materials shall stack behind the edge of slope
Ensure that proper barrication are in place.
Ensure that proper access & egress was in place
2 Trimming of slope Hand injury Ensure that workers are wearing of hand gloves
during manual trimming

SIMOPS Ensure that proper distance from one workers to


another workers
Trips/falls Ensure that area have been provided with proper
access & egress like ladders going down the slope
Ensure slow movement of workers while accessing
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
down the area
Ensure that area secured & barricaded
Ensure potable water/sufficient shelter is available
Heat Stress/Exhaustion each area where workers are doing the job. First
aid kit available at site.

Ensure that only designated access shall be used


going down and up the slope
Workers might fall over the slope
Ensure that no worker shall work without
sufficient light.
Ensure that wearing of clear glass is a must after
dark.
Ensure proper tools are use for the job
Ensure that full supervision are in place
Ensure that excess materials shall removed far way
from the area
4 Brick Masonry for Toe Beam Hand Injury Ensure proper hauling of materials/get help if
required/Wear hand gloves.

Throwing of Bricks Ensure that workers must not throw the bricks
during working to avoid any incident.

MSDS for Cement. MSDS of Cement must be attached with the


permit.

Ensure that area have been provided with proper


Trips/falls access & egress while working on the slopes.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
4 Bricks laying on slope & ground Person falling from slope Ensure that Full body harness shall be worn while
level Placing the bricks.
Harness shall be tied of with scaffold railing
constructed on the top.

5 Demobilization Poor house keeping Ensure that area should be clean after the work is
being finished.
Same as mobilization