JOB TITLE / AIM: JSA for construction of batter protection along road barrier
JSA DATE: 1/3/2007 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: Iqbal Zaffar SCRIBE: Abdullah Khan
PARTICIPANTS: Mehboob
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of tools & workers
2 Trimming of slope
3 Brick Masonry for Toe Beam
4 Bricks laying on slope & ground level
5 Demobilization
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of tools & workers and Unauthorised tools brought to site Before mobilizing any tool make sure that the E
material &P Personnel got inspected the tool.
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.
Workers starting the job unfit to work All personnel must undergo the fitness exam from
DEL company doctor & if not fit to work shall not
be allowed to work at the project site.
Workers starting the job without permit JSA must be in place prior to work. Ensure all the
persons take part in the toolbox meeting
discussion. All Persons must sign at the back of
JSA.CWP shall be obtained from OPS.
Hand Injury Ensure proper hauling of materials/get help if
required/Wear hand gloves.
Fall of tools/material Ensure proper stacking of materials
No materials shall stack behind the edge of slope
Ensure that proper barrication are in place.
Ensure that proper access & egress was in place
2 Trimming of slope Hand injury Ensure that workers are wearing of hand gloves
during manual trimming
Throwing of Bricks Ensure that workers must not throw the bricks
during working to avoid any incident.
5 Demobilization Poor house keeping Ensure that area should be clean after the work is
being finished.
Same as mobilization