You are on page 1of 14

TITLE OF THE ACTIVITY: RE-ROUTING OF ELECTRICAL CABLE

o
Assessment Number: QRC-RA-004 Asses. Date: 17-12-2022 Revision Date: 00 Page Number: 1 14
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

General  Lack of Injury to personnel  Ensure only person having working visa allowed to supervisor,
Preparation communication. Minor/Major. 4 5 20 H enter the working area. Safety officer 4 1 4 L
(surveying) and  Inadequate Difficult to response  Designated access routes to be used and and PM.
Mobilization of procedure used in an emergency. appropriate signages should be display.
personnel.  Incompetent Failure to follow  Site safety induction training should be conducted
 Unskilled workplace safety. to all workers.
personnel Poor execution of  No visitor will be allowed to enter without gate
 Weather structure pass.
condition  Pre task briefing to all workers before and ensure
 Personnel with close supervision must be standby.
Partial disability,  Approved Permit to work must be available at site
young workers before work comes.
 Less experience  Ensure site engineers and foremen are aware of
personnel weather condition and daily activities.
 Skill personnel should be employed.
 The worker should understand the local language.
 Ensure young workers should be monitor by a
competent foreman
Mobilization of  Wrong Injury to personnel  Ensure all equipment and machinery selected Site
equipment and equipment and Hearing loss, 4 5 20 H should be in standard of construction. engineer, 4 1 4 L
machinery like machinery used. abrasion, head injury,  Materials should storage in a designated area and supervisor
 Exposure to overturning of fully barricaded. and safety
noise. vehicles  Ensure unloading of materials should be under officer.
 Harm and fingers Hydraulic oil leaks supervision of a foreman.
cut injury.  Ensure regular maintenance of vehicles.
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 2
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

 Falling object  Manal handling training to all personnel to carryout


from height. loading and unloading activities.
 Speeding of the  Vehicles should be overloaded.
vehicle at the  Ensure regular maintenance of equipment.
working area.  Speed limit should be strictly monitor at site.
 Poor  Certified Banksman/flagman should be deployed
maintenance of during machinery movement.
vehicle and
heavy
equipment.

Removing of  Vehicle accident Property damage.  Only QRC, approved vehicle, equipment, and Supervisor,
External lighting due to uneven Fatality injury workers 3 4 12 M machineries Hiab Truck and Manlift shall be used. PM, and 3 1 3 L
system and trees. surface. and passerby death or  Safety operating speed limit shall be strictly workers.
 Materials falls facture monitor.
Removal of Feeder from height.  In this step we will dismantling the light fittings
Pillar  Crushing.
 Exposure to the and remove all connections and keep it aside.
Disposal of surplus
public falling  For the light place in the trees and following
materials using
debris.
mobile equipment. we use manlift for removal.
 Tripping hazard.
 Eye injuries.
 For the poles higher than 4m height, we will
 Dust inhalation.
 Collapse of use Hiab for the removal.
structure.
 All vehicles should be park in designated area.
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 3
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

 Competent flagman should warn others and guide


vehicle during reverse movement
 Ensure tools box talk conducted for safe handling
of materials mauling.
 Operator trained and ensured all machinery
satisfied by third party and certificate available at
site.
 Area Should be proper barricaded where cut off the
trees.
 Ensure daily safety check list available for all
machinery & equipment.
 Vehicles should not be overloaded; load should be
in a secure position.
 Reverse beeper and flashlight beacon fitted.
 Ensure all guard and covers to be fitted.
 Ensure working area should be completely fence.
 All required permits shall be obtained.
 Ensure fire extinguisher available on site and
emergency service contact display at site.
 Ensure all workers on site should wear full body
PPE, (safety helmet, safety shoes, full body
coveralls, hand gloves, safety goggles etc.)
 Conduct pre-task training to all workers involved in
demolition activities.
 Make sure the circuit breaker at the MDB shall be
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 4
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

turned off.
 Remove the feeder pillar FP-24,25,26,27 and keep
it aside. After removing the feeder pillar.
 Foundation also needs to be removed.

Excavation both  Structure Injuries to workers 3 5 15 H  Provide proper protection with wood or metal Foreman & 3 1 3 L
manually and using collapse. Damage of property sheets with stable supports. site engineer
mechanical heavy  Damage of  Ensure to inform the authority before embedding the
equipment exiting services. existing underground utilities.
 Ensure trial holes in advance.
 Ensure approved permits to work (PTW) available at
site before work comes for any such work.
 Provide certify approved 3rd party flagmen for all
moving equipment.
 Check Vehicle operators’ valid third-party
certificate and valid UAE driving license suitable for
the type of vehicle.
 Ensure that pedestrian walkways segregated from
vehicle access
 Conduct TBT prior to start the activity.
 All workers should be aware about hazards and
precaution regarding leveling work.
 making steps (benching) or sloping on all sides of
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 5
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

excavation to avoid collapse and reduce depth


 Making slopes on the sides of excavation.
 Avoid heavy equipment movement near the
excavated area by barricading or marking the area
for safe movement of vehicles.
 Ensure to provide signage at the excavation area.
 Ensure the ground condition is suitable for the
work.
 Excavated soil shall keep 2mtr away from the
excavation edge
All task that  Collision with vehicular accidents at 4 3 12 H  Check Vehicle operators’ valid third-party Operators, 4 1 4 L
involves usage of other site. certificate and valid UAE driving license suitable for drivers, site
moving equipment equipment. Legal prosecution. the type of vehicle. supervisor
like Mini Excavator.  Third party Major injury to  Ensure certified flagman is assigned to all moving
etc. certificates not workers. equipment.
provided for Overturning of  Daily inspection shall be done by operator prior to
operators and equipment. start.
moving Personal injury,  Ensure that faults are immediately reported, and
equipment possibly major from repair are attended by authorized personnel only.
(bobcat, wheel impact crushing  Ensure amber lights, reversible lights and horn of
loader, roller the moving equipment are in effectively working
compactor etc) condition.
 Operatives may  Ensure to follow site speed limits and never
get hit by overload any vehicles.
moving  Equipment shall be used only for their intended
equipment. purpose.
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 6
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

 No passengers are allowed to travel in mobile


 Over speeding, equipment.
over loading  Operatives are not allowed to take rest next to
 Legal non- parked vehicles
compliance may  Don’t allow any operatives movement in the
result from vicinity of the equipment.
a lack  Ensure that pedestrian walkways segregated from
of a certified vehicle access.
flagman and
necessary
inspection
certificates
& records.
Dust generating the  Lung diseases Death  Ensure full body PPE must be worn at all levels
workplace and dermatitis Respiratory system (respiratory mask, hand gloves, goggles, safety
block 5 5 25 H shoes, coveralls etc.) Engineer, 5 1 5 L
 Toolbox talk to raise awareness to all workers. supervisor,
 Ensure water spraying to reduce the generation of PM AND HSE
dust. Officer.
 Continuous supervision is required to ensure
workers are following safe system of work.
 Eye wash station to be provided and first aid kid
with first aider.
 Ensure housekeeping toolbox talk conducted to all
worker, extreme care to be taken while working on
dusty area.
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 7
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

 Appropriate safety personal protective equipment


must always be worn.
 Spray water to reduced dust generating from
working area.
 Warning signs must be displayed at site.
 Barricade the area with safety mesh
Access/Egress  Unauthorized Death, injuries  Ensure access to the site must be controlled to Flagman/site
entry to site. 3 4 12 M ensure the safety of all workers and visitor. supervisor 3 1 3 L
 Injury to public.  Banksman in place to ensure any awkward
 Vehicle collision reversing.
 Conduct tools box talk on safe operating
system/speed limits.
 Ensure access and egress routes free from
materials and equipment.
 Ensure mandatory personal protective equipment
(PPE)must always be worn (safety helmet,
coveralls, safety shoes, Hi-visibility vest etc.)
 Barriers should be erected around unattended
excavations, secured with sandbags where
necessary and warning signage in place such as
deep excavation, men at work, reduce speed,
warning flashlight etc.

 Poor compaction Formation of 2 5 10 H  Identify the cable route for the junction board. Site 2 1 2 L
Relocation of of soil. sinkholes. engineer,
 Disconnect the junction box power cable from main
Junction Box  Excessive white finger and foreman.
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 8
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

vibration to numbness injury to supply.


operatives workers.
 Remove the junction box and install it in the new
All activities involve  Protruding rebar Major cut and other
backfilling, Levelling and sharp physical injuries. location.
& compaction. objects. Musculoskeletal
 Lay the cable from the new power source to
 Poor manual disorder for
handling. operatives. proposed junction box location.
 Inhalation of Skin irritation and
 Terminate the cable.
dust and foreign allergic reaction for
particles. operatives.  Recheck all the connection are OK.
 Contact with  Energize the junction box.
cementitious
products.  Verify internal inspection record of compactor prior
 Soil to start.
contamination  Deploy trained and physically sound operatives for
due to oil the task.
spillage from  Deploy job rotation to avoid exposure to excessive
compacting vibration.
machines.  Ensure drip tray and spill kit are available.
 Machinery  Report all oil spillage incident to Emergency spillage
overturn. response team.
 Improper access  Ensure all protruding rods are either blunt or
and egress provided with rebar cap.
 Vibration and  Ensure to deploy proper manual handling
noise from techniques.
compactor may  Ensure proper compaction done after backfilling
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 9
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

cause ill-health materials as per method statement.


to operatives.  Ensure suitable respiratory mask is effectively worn
 Slip, trip and fall by operatives.
due to  Ensure proper washing facilities are available for
 Uneven surface operatives.
movement of  Ensure effective usage of all task related PPE like
vehicles, shock absorbent hand gloves, Ear muff etc as
damage to recommended by manufacturer of the equipment.
existing  Ensure to do periodical health checkup.
underground  Ensure proper mode of access and egress is
utilities during available.
construction  Ensure all operatives are effectively wearing safety
toed shoes and rubber gripped hand gloves.
Manual handling  Fatigue. Death, injuries  Ensure manual handling training and instruction Workmen
 Ligament strains, 3 6 18 M provided to all workers. and 3 1 3 L
muscle strains.  Eliminate the need of manual handling by using supervisor
 Abdominal mechanical aids wherever possible.
hernias.  Assess the load and weights marked on all loads.
 Hand injury.  Personal protective equipment must be worn (hand
gloves)
Using of power  Use of defective Burn injury.  Power should be inspected by a competent Site
tools power tools. Cut injury. 3 5 15 M electrician with colour coded on regular basis. supervisor, 3 1 3 L
Electric shock.  Tools above 110 volts must have approved from electrician
DMC prior to use at site. and safety
 Trained the worker on safe use of power tools. officer
 Ensure that ON/OFF switch is in safe working
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 10
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

condition.
Environmental  Adverse weather Death.  Provision of welfare facility on site with good Flagman/site
conditions conditions, Sunburn. 4 5 20 H drinking water, air conditional system, first aid supervisor, 4 1 4 L
 Heat exhaustion Dehydration. room etc. PM and HSE
 Heat stroke  Closed supervision on site and provide the workers
 Dehydration rehydration salts and regular break to the workers.
 Personal injuries  Shift rotation system should be implemented.
due to high  Ensure shift routine work should be implemented.
temperature  Drinking plenty of water with electrolyte.
 Sunstroke and  Do not allowed alone work.
tiredness  Ensure frequent break provided for the workers.
 Provide heat stress training.
 Conduct toolbox talk to workers.

Use of Hiab Crane  Loading and Major injury to 4 5 20 H  Before lifting of the load surrounded area of trailer Lifting 4 1 4 L
For Offloading area workers and passing and mobile crane should be barricaded by warning supervisor,
Loading and not secured by by motorist/ visitors/ tape/rope with wound warning tape at least 1.5 site
offloading of warning tape. staff or nearby meters wide access. engineer,
materials.  Warning workers.  Make sure that sign board clearly visible along the foreman &
devices not Fatalities, Damage of area to aware the motorist/visitors/staff and HSE Officer.
working, property and legal nearby workers regarding the hazards.
insufficient prosecution  Assign banks man to control road traffic.
knowledge  Supervisor/Foreman should be plan properly the
to positioning of Mobile crane and trailer.
operator /  Crane operator is responsible for ensuring the
rigger and operation of his unit such out rigger must be fully
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 11
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

poor extended, out rigger lock to be secured, ensure


maintenanc that warning devices is properly functioning,
e of the manual of crane is available necessarily, and
equipment. maintenance record of mobile crane including valid
 Having no certificate prior to commence lifting operation.
control of  Mobile crane operator should mandatory
Precast performed check list every shifting of his unit after
during setting to ensure the safe system of work.
lifting.  Supervisor to plan procedure to be followed and
 Weight not instruct the employee accordingly.
distributed  Tag line must be attached always to the load before
evenly lifting to avoid unnecessary movement.
 makes it  Truck driver is responsible to the safety of his load
difficult and
control.  part of his training should entail the loading of his
 Over loaded truck.
Vehicle,  His knowledge and advice should be adhered.
 Employee to be made aware of these hazards. Only
 communication between the rigger & operator can
avoid
 an injury from occurring.
 Driver to be inducted in safe loading operation.
 Driver to ensure that the capacity chart is available
and clearly readable out of door cab.
 Driver should be monitored the loading sequence.
Loading personnel should be briefed in capacity of
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 12
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

vehicle.
Waste  environment Contamination of  Hazardous wastes should be stored in designated HSE / PM
Materials/Hazardou impact environment/ 4 3 12 M areas and label with signage. Engineers 4 1 4 L
s Wastes damage to natural  Conduct training on safe handling of hazardous and
flora. materials and the important of PPEs (safety hand workmen
gloves, dust mask, full body coveralls, safety
helmet, goggles etc.)
 Safety signages should be at place, segregated and
disposed as per DM guidelines.
 Ensure housekeeping should be maintained at all
level and proper materials storage at site.
Precautionary  Get positive in Hight fever.  Ensure toolbox talks conducted to all workers at Workmen,
measures for the COVID 19 or any Serious cases/Death site on coronavirus (COVID-19) safety precaution HSE, PM,
COVID - 19 other diseases. Caught 5 4 20 H must be followed, Engineer and 5 1 5 L
 Personnel can be  Ensure DHA safety guiding implemented at site pedestrians
infected to virus (surgical mask, hand gloves and social distances of or pass by.
1.5 meter must be maintained at all time.
 Conduct toolbox talks on good housekeeping and
personal hygiene.
 Provide hand sanitizer for disinfectant, first aid kit
and ensure a competent first aider standby at site
 Ensure daily temperature scanning before work
comes.
 Emergency contacts should be display at site and all
incident/accident and near miss must be reported
immediately.
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 13
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

RR: Risk Rating Likelihood


Likelihood (L) (LxS)
Severity (S) RISK LEVEL =
(% of Compliance) Resultant Risk Level 0 1 2 3 4 5
being either High,
Medium or Low.

1 91 to 100 1 First-aid case 1–4 Low 1 1 2 3 4 5

2 81 to 90 2 Minor (Hospital referred) 2 2 4 6 8 10

Severity
5 – 10 Medium
3 71 to 80 3 Reportable (3 - 21 days medical rest) 3 3 6 9 12 15
4 25 to 70 4 Major (Hospital admission/≥21 days medical rest 4 4 8 12 16 20
12 - 25 High
5 0 to 24 5 Fatality 5 5 10 15 20 25
TITLE OF THE ACTIVITY: EXTERNAL LIGHTING SYSTEM REMOVAL & MODIFICATION OF FEEDER PILLAR

o
Assessment Number: QRC-RA-001 Asses. Date: 10-12-2022 Revision Date: 00 Page Number: 14
f
14
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL

Legal Reference: Chapter 5, Federal Labour Law (8), UAE 1980/ Ministerial Order No. 32, UAE 1982/ Code of Construction Safety Practice, Dubai 2008

Prepared by Approved by
Workmen Representative
Risk Assessment Committee/ HSE Management Representative/ Project Manager
Name & Designation Betta Melvis - Safety Engr. Name & Designation Name & Designation Eng. Khalid walid - PM

Signature Signature Signature

You might also like