HSE Risk Assessment

Revision: 00 Date: 06/12/2022 Page:1 of 10

Ref. N°: Participants Name Job Title Signature


Abdel Aziz Anter Construction Engineer
Activity/Task Sayed Ahmed HSE Supervisor
concerned and its Cable tray installation
location

Required level of  Minimum (at start


 Permanent  Other:
Supervision: and end of task)
Risk Rating (RR) guideline:

IMPORTANT NOTE : By signing this document, it is acknowledged by each


person involved in this risk assessment that all reasonable attempts have been
made as a first priority to identify any potential to eliminate all the significant
hazards listed, e.g. by preventing working at height or entering into a confined
space.

Likelihood (L): Probability of the undesired event to happen (shall consider the frequency and duration of exposure and Severity (S): Importance of harm, damage or impact caused by the event.
the potential for the undesired event to happen).

Value Definition Severity Value Definition


Negligible the occurrence is extremely unlikely to happen and has never happened according to Minor None or very limited consequences on people (e.g. first aid injury), property (e.g. scratch on equipment painting) or the environment
(1) our knowledge (1) (e.g. small quantity of biodegradable waste dispersed)
Low the occurrence is unlikely to happen in the foreseeable future but has already been Moderate Injury requiring medical treatment without lost workdays, reversible environmental negative impact or property damage / business
(2) experienced (2) interruption below 50 k€ of cost involved
Moderate the occurrence is predictable to happen in the mid-term High Lost Time Injuries, with full recovery, or reversible environmental negative impact or property damage/business interruption below
(3) (3) 200 k€ of cost involved
High the occurrence is predictable to happen in the short term Major Severe Accident as per ACCIONA & RTCC General Electric criteria.
(4) (4)
Definite the occurrence is certain and immediate. Catastrophic Potential for several fatalities (or other type of severe accident)
(5) (5)

Approved by

Competent Discipline Engineer EHS Representative (Name,


(Name, Signature and Date) 06/12/2022 Signature and Date)

Risk assessment reference number:


HSE Risk Assessment
Revision: 00 Date: 06/12/2022 Page:2 of 10

Activity Hazard Risk and affected Existing Control Measures (L) (S) (RR) Additional Control Measures (L) (S) (RR) Check
Step Persons
Obtain Unauthorise Accident resulting  Permit to work shall be obtained as 3 3 9 1) Site manager, supervising 2 1 2 Hse
permit to d work. serious injury or death a pre-requisite to perform work. engineer, foreman shall superv
work Unauthorise to worker.  Work shall not be started until designate a permit receiver isor/of
d personnel duly approved permit. competent enough to take ficer
entering a Significant property  A safe work practice shall be responsibility in securing
restricted and appurtenances implemented to reduce the the permit to work. Constr
location damage possibility of accident and 2) Permit receiver shall be uction
without incident. trained and authorized to superv
permit. Loss of production  Permit receiver and permit issuer receive a permit to work. isor
significant cost due to shall enter the site together to 3) Permit receiver shall be Permit
Unidentified damages. ensure workplace hazards are responsible to oversee for receive
hazards with adequately identified and the safety of all workers r
unplanned Governmental mitigating measure shall be under his permit to work.
safety violation established. 4) All the employees shall
mitigating environmental  Permit receiver shall not leave the adhere to all requirements
measures. complaint. area for whole duration work. set forth in the permit to
 Work shall not proceed without the work, risk assessment and
Improper presence of approved permit to other relevant safety
communicati work with the permit receiver practices and standards.
on b/w overseeing the activity. 5) All workers shall attend the
permit  Permit receiver shall account all toolbox talk meeting shall
receiver and sign on the attendance
workers under his permit to work
issuer. before the start of work. sheet.
6) Permit receiver must be
 Joint site visit should be done
Incorrect trained and able to
before issuing work permit.
equipment communicate each and
 Clearly identify the equipment
identification everything related to his
number and location to be worked.
job.

4 4 16 1) Delivery/ collection drivers 2 4 8 Hse


Delivering, Toppling of Nearby shall be subject to McLaren superv
unloading improperly employees/visitor  Hiring competent workers. induction/Training with isor/of
and storing may get hit by regards to traffic ficer

Risk assessment reference number:


HSE Risk Assessment
Revision: 00 Date: 06/12/2022 Page:3 of 10

of stacked or reversing/moving  All plant to have a fully trained management.


Materials secured equipment and may banks man present all times. 2) Ensure exclusion zone is Constr
using get injured.  Forklift/other equipment shall be set up around the uction
Pickup Breaking or tested and certified by 3rd party. preparation work area and superv
Van, failure of  Daily checklist of forklift must all plant movement and isor
Forklift, lashing maintain by forklift operator checked by supervisor
Pallet  PPE provided 3) Always use the pedestrian
Trolley. Plant and access with high visible
Traffic vest.
movement 4) Forklift must be tested and
Vehicle/Fork certified by 3rd party.
lift break 5) Daily checklist of forklift
down must maintained by forklift
operator
Falling 6) Forklift Operator /banksman
materials must be trained and
from certified by 3rd party.
Forklift/ 7) All plant to have a fully
trolley trained banks man present
all time.
Over loading 8) No reverse without banks
man.
Personal 9) Ensure access route are
injury sufficient and safe to use.
10) Proper barricade and safety
signboard provided on
open excavation.

Manual Sharp edges musculoskeletal  Ensure proper manual handling 4 3 12 1) Eliminate the need for 1 3 3 Hse
Handling disorders procedure manual handling by using superv
Untrained  Adequate PPE provided mechanical aid. isor/of
labours Hand injuries  Training will be provided 2)Reduce the weight of a load ficer
 Toolbox talk will be conducted on to limit force exertion
cut, bruises daily basis
Risk assessment reference number:
HSE Risk Assessment
Revision: 00 Date: 06/12/2022 Page:4 of 10

Not hiring 3) If unsure of the load weight, Constr


competent check with supervisor. uction
workers 4) Identify and eliminate sharp superv
edges before any manual lift isor
5) Ensure adherence with
sufficient and appropriate PPE.
6) Limit load carrying to 20kg
per person
7) Supervisor must make sure
while manual handling load
individual task and
environment to be considered to
reduce the risk of manual
handling.

Material Inappropriat Trips and fall  Ensure accesses are kept clear at 3 4 12 1) Provide adequate lighting 1 4 4 Hse
storing e or leaking all times. especially during night superv
storage area. Slip and fall  Housekeeping to be carried out hours isor/of
regularly throughout the day when 2) Appropriate space is ficer
Storing Operatives required. allowed around storage
incompatible Staff/storekeeper  Supervisor to ensure operatives are areas for employees to Store
chemicals stacking material neatly and stacks move around safely keeper
together. are stable and in a safe condition without the risk being
trapped between stacked
Using materials.
inappropriate 3) Maintain good
or unsecured housekeeping.
storage area 4) Fire Extinguisher in place
and do not obstruct with
Poor house materials
keeping. 5) No smoking and no loose
connection in storage area
First Aid arrangement in place

Risk assessment reference number:


HSE Risk Assessment
Revision: 00 Date: 06/12/2022 Page:5 of 10

Installation Handling of Lost of assets,  Only trained and authorised 4 4 16 1) Ensure safe access to the 1 5 5 Hse
of GI/PVC materials, personnel injury, personnel to carry out the task. working platform. superv
Conduits use of tools fatality, death,  Ensure the PTW in place and task 2) Ensure Full body harness isor/of
and Tray and tackles accident briefing by supervisor to work and 100% tie off ficer
/Trunking/ for force. 3) Ensure the scaffold
Cable installation. Material damage due  Ensure proper working platform platform is properly erected Site
pulling and to falling. with complete fall protection with "Safe to use" tag. superv
Laying. Work at  Daily toolbox talk will be provided 4) Ensure castor wheels are isor
using height Head/body injury locked and out rigger in
Mobile place.
Scaffolding Falling 5) Hand tools must be
. objects secured/tethered
6) Hot work permit to be
Fall of obtained and ensure that
person there is no combustible
materials near cutting work.
Overturning 7) Ensure Fire extinguisher in
of Mobile place with fire blanket to
scaffold protect the Fire flux
8) Ensure cutting wheel must
Angle be from standard company
Grinder for and inspect before use.
GI Tray 9) Angle grinder must
cutting inspected by competent
electrician and maintain
Dust record.
10) Ensure operatives must
Use of alert while using cutting
threading tools for their clothing to
Die for GI avoid entanglement with
conduit moving parts.
11) Angle grinder must have
Using safety guard and operatives
solvent for must use face shield.

Risk assessment reference number:


HSE Risk Assessment
Revision: 00 Date: 06/12/2022 Page:6 of 10

PVC conduit 12) Dust mask and noise


joints protection must use.
13) Safety data sheet and
COSHH assessment must
briefed to the operatives
before using any chemicals
and solvent.
14) Maintain good
housekeeping.
15) PPE must be in use for
every task.
16) While cable pulling activity
need close supervision and
with good communication
17) Roller to be use safety to
pull the cable and secured
to avoid fall from height.

Cable Physical like laceration, PAT test to be conduct and maintain 4 4 16 1) RAMS to be briefed to the 2 4 8 Hse
glanding Injuries foreign parts in eyes, register. operatives before start the superv
and finger injury activity and maintain the isor/of
termination Spark and Entanglement with All the power tools shall be 110 volt record. ficer
(Not Fire and safe to use 2) Hot work permit to be
energized) obtained and work area Site
using drill sharp edge All power supplies should be installed must free from combustible superv
machine tools & connected item isor
and hole by a competent electrician. 3) Fire extinguisher in place
show Noise and with fire blanket.
cutter. dust 4) Noise protection to be use
5) Eye protection must be
used.
6) Operatives should alert
while using sharp edge
tools

Risk assessment reference number:


HSE Risk Assessment
Revision: 00 Date: 06/12/2022 Page:7 of 10

to avoid entanglement with


clothing.
7) Close supervision and
necessary PPE.

Working in Physical respiratory diseases Prepare the working area for a good 3 4 12 1) Ensure that the working 1 4 4 Hse
poor injuries, working condition. area is well-ventilated. superv
visibility/d Slips, trips & body injury due to 2) Wear goggles & face mask isor/of
ust falls, Health slip/trip and fall All workers shall wear high visibility when working in a dusty ficer
condition effects – eye vest and PPE place
damage breathing problem 3) TBT conducted by Site
supervisor. superv
asthma 4) First aider and first aid kit isor
available on the site
5) Ensure that work area must
have proper illumination
6) Maintain good
housekeeping.

Use of Damaged Falls can result in Check the ladder is of suitable quality 3 4 12 1) Only light work, off short 2 4 8 Hse
Ladder ladder bone fracture which for industrial use and is in good duration and work in which superv
can be multiple, and condition the operative can maintain isor/of
Uninspected cause ligament/tendon secure hand and foot hold ficer
ladder damage. Maintain a minimum of 3 points of can be undertaken form a
contact with stepladders always ladder Site
Homemade Bone/body injury 2) Never try to overreach with superv
ladder Standard ladder will be provided any ladders isor
3) Check the ladder is of
Falling from suitable quality for
height industrial use and is in good
condition
4) Check the inclination of the
ladder conforms to the one-
in-four rule.

Risk assessment reference number:


HSE Risk Assessment
Revision: 00 Date: 06/12/2022 Page:8 of 10

5) Check the ladder legs (and


stays) are fully deployed or
locked (depending on type)
to maintain maximum base
dimensions and the step
ladder is orientated to
provide maximum stability.

Use of Damaged Electrocution Power tools shall be inspected 4 5 20 1) PTW to be obtained, prior 1 1 5 Hse
power tools cable periodically to commencing the task superv
such as insulation, Electric shock Ensure all power tools are in good 2) All portable electrical isor/of
angel Sockets. condition and appropriately maintained equipment must be PAT ficer
grinder, Short circuit tested and color coded.
Drill Vibration use dust mask Make sure the test dates are Site
machine, Electric burn visible on the equipment. superv
Jack Adequate ppe shall be provided 3) Damaged industrial sockets isor
Hammer Dust Hearing loss and power cables must be
TBT shall be conducted on daily basis removed.
Noise 4) Ensure the electrical cable
is not damaged and has not
been repaired with
insulating tape or
unsuitable connectors.
5) Ensure cables from power
tools shall be organized so
as not to present a tripping
hazard
6) Only trained competent
operatives to operate the
power tools.
7) Ensure proper and regular
maintenance of equipment
that takes account of noise
8) Ensure proper hearing
protection always.

Risk assessment reference number:


HSE Risk Assessment
Revision: 00 Date: 06/12/2022 Page:9 of 10

9) Make sure people use the


right tool for the job and
are trained to use it
correctly
10) Ensure defective tools that
requires maintenance is
reported for repair or
replacement.
11) Instruct workers to keep
their hands warm and dry,
and to not grip a vibrating
tool too tightly. Workers
should allow the tool or
machine to do the work.
12) Ensuring proper job
rotation and limiting time
operatives working with
power tools and hand tools.

Use of Improper Hand injuries Hand tools should be visually inspected  3 3 9 1) Never use damaged, blunt 2 2 4 Hse
Hand tools selection of for defects, prior to use.   or broken tools to avoid superv
hand tools. Repetitive strain injury. isor/of
injury Selection right tools for right Job   2) Select right tools for right ficer
Improper Job.
maintenance Body pain Ensure no Homemade or makeshift tools  3) Remove from service any Site
to be used at site   tool that shows signs of superv
Use of Aches damage or defect. isor
damaged and 4) Ensure Hand tools are
Defective Fatigue Stored in accordance with
Hand tools the manufacturer’s
soreness instructions.
Ergonomics 5) Ensure hands are not in
direct line of fire while
using.

Risk assessment reference number:


HSE Risk Assessment
Revision: 00 Date: 06/12/2022 Page:10 of 10

COMMUNICATION TO WORKING PARTY


By signing this sheet, each individual acknowledge that he received information on the risks and control measures associated to the identified activity, that he will adhere to these
control measures and that he will report any discrepancy to its content and stop the work whenever necessary.
Full Name Job Title Signature Date Full Name Job Title Signature Date

Risk assessment reference number: