Good housekeeping is
monitored by the supervisor.
Supervisor to brief all workers Supervisor
by the supervisor.
on the first day on emergency QHSE Officer
arrangements agreed with the
principal contractor.
Where possible, mechanical
means to be used to transport
materials.
Where possible, mechanical means
Where the movement requires
to be used to transport materials.
short distances, operatives will
Where the movement requires
use barrows or where this risk is
Operators risk injury, short distances, operatives will use Project Manager/
the minimal passage of
particularly to the back, from barrows or where this risk is the Engineer
Manual materials between numbers of
4 lifting and handling heavy or 5 4 20 minimal passage of materials 1 4 4 Project
handling operatives.
awkward objects, e.g., Pipe between numbers of operatives. Supervisor
All materials will be below the
sections. All materials will be below the QHSE Officer
recommended guidelines for
recommended guidelines for
manual handling lifting the
manual handling lifting the weight
weight of 25kg.
of 25kg.
Remind operatives of the safe
system of work at site
induction.
All hot works areas are to be
cleared of any debris, fire
Hot works areas are to be cleared
extinguishers are to be always
of any debris, fire extinguishers are
kept close, and fire blankets
to be always kept close, and fire Project Manager/
used where needed. Hot works
Operators and nearby blankets used where needed. Hot Engineer
permits will be in place and hot
5 Hot works tradesmen are at risk from 3 4 12 works permits will be in place and 1 4 4 Project
works guidelines will be
burns/fire. hot works guidelines will be Supervisor
adhered to. Smoke alarms are
adhered to. Smoke alarms are to QHSE Officer
to be isolated locally.
be isolated locally.
Firewatcher is to be appointed
who will check for smouldering
material for no less than 1 hour
Page 2 of 5 QHSE-RA- Installation of a New Air Conditioning System
Risk Assessment Page 3 of 5
Installation of a new air conditioning system
Department Document Ref. No. Issue Date Revision
QHSE QHSE-DOSC-RA-AC 00-00-0000 00
Improbable (I.) 1 1 Mi 5 4 3 2 1
PROBABILITY = Likely (5) Probable (4) Possible (3) Remote (2) Improbable (1)
SEVERITY = Catastrophic (5) Major (4) Reportable (3) Serious (2) Minor (1) RISK = PROBABILITY x SEVERITY
* Residual risk is the level of risk that remains after suitable and sufficient control measures are introduced
Project Manager:
Project Engineer:
QHSE Officer: