You are on page 1of 3

50 MW ARTISTIC

WIND POWER PROJECT

Issue Date: 20-01-2021 JOB SAFETY ANALYSIS WORKSHEET Issue #: 05


(Equipment Lifting)

Activity Steps Hazard Hazard Risk Control Measures Residual Responsibility Responsibility
Likelihood Impact Risk for Execution for Monitoring
Equipment Lifting Mobilization of Un Inducted  Only inducted and medically fit people Area HSE
equipment People Concern Supervisor /
(Crane) should enter the working area. Supervisor Rigger
 HC COVID-19 SOP shall be strictly
followed.

Un inspected  Ensure the crane is 3rd party certified.


equipment
 All lifting gear needs to be used during
lifting are 3rd party certified & certificates
available
Simultaneous  Stop all activities near the vicinity of
operation
(SIMOPs) crane radius.
 No Simultaneous Operation (SIMOPs) is
permitted.
PPE Non  All required PPE needs to be provided.
compliance
 Ensure workers involved in activity wear
mandatory PPE. (Hard hat, Safety
shoes, goggle, reflective vest)
Crane Setup Uneven/Soft  Ensure that ground is firm & rigid.
ground
 Ensure the crane is properly set up.
 Ensure out riggers are fully extended.
 Crane shall be placed on hard surface
and wooden packers are placed
underneath of outriggers.
Pedestrians/unaut  Barricade the lifting area and put sign
horized entry
“Lifting in Progress” to aware other
personnel.
 Avoid unauthorized entry inside lifting
zone.
Equipment Lifting Lifting gear and  Loading & unloading activities to be
shackles do not
suit the load or conduct during day hours. No lifting to be
have incorrect lift done after sunset until provision of
Angles.
50 MW ARTISTIC
WIND POWER PROJECT

Issue Date: 20-01-2021 JOB SAFETY ANALYSIS WORKSHEET Issue #: 05


(Equipment Lifting)

proper lighting and permission from client


and HC Manager.
 Safety Engineer /Supervisor shall remain
onsite and monitor whole lifting activity
until its completion.
Slings, chains and  Loads to be rigged only by certified
shackles of
insufficient lifting riggers.
capacity.  Only third party certified lifting gear to be
used.
 Only lift guard posts from certified lifting
lugs
Movement of the  Ensure tag lines are in good condition
load due to
incorrect rigging and attached to during every lift.
 Use only recognized hand signals or
radio system.
 Only rigger to direct the movement and
placement of loads.
Equipment failure  Prevent load from unintentional swing by
compensating for boom deflection
centralize center of gravity
 Load must be set down in a stable
manner that prevents movement when
rigging is removed.
 Operation to be supervised by a
competent rigger at all times.
Abnormal  Reference to the local weather forecast,
Weather/High if there is heavy fog, strong wind, no
Wind Speed offload activities will be allowed.
 Ask operator to monitor wind speed
through anemometer and stop lifting if
wind speed exceed limit. i.e 32 KPH
Demobilization Poor house  Out rigger pads are correctly stowed on
keeping the crane.
 Job related supervisor to ensure area
was left clean and tidy.
50 MW ARTISTIC
WIND POWER PROJECT

Issue Date: 20-01-2021 JOB SAFETY ANALYSIS WORKSHEET Issue #: 05


(Equipment Lifting)

Risk Table

Likelihood Impact
1-Very Low 2-Low 3-Average 4-High 5-Very High
1-Most 1 2 3 4 5
Unlikely
2-Unlikely 2 4 6 8 10
3-Likely 3 6 9 12 15
4-Most Likely 4 8 12 16 20
5-Certainly 5 10 15 20 25
Note: This JSA is a live document and may be amended based on results of actual monitoring performed by HC, AWPL and IMC.
Developed By Department/ Organizations Signature

(HC)

Jeetesh Kumar HSE

Review By Department Signature

Asad Shaikh HSE Manager

Approved By Department Signature

Mr. Lee chen HSE Director

The JSA was read and work procedure and safety aspects were reviewed and understood by team executing the job Supervisor