You are on page 1of 2

Date :

03.09.2018
Vizag-Refinery Modernization Project, Visakhapatnam
JOB SAFETY ANALYSIS Document No.: 073876C001/502/JHA/6100/015 Rev. 00

Main Activity Pile breaking with Hydraulic breaker Unit/Location (Prime G), MS Block
Equipment’s to be used Hydraulic excavator breaker. Team Members ACX, BS, SP, MKV, SA,
Required PPEs. Safety Helmet, Safety Shoes, Hand Gloves, Safety Goggles and Ear Plug where ever required
SN. Job Activities Hazards Control Measures Responsibility
Access to work place 1.1. Collision with loose soil 1.1.1. A high level of personal awareness is required from all employees Engineer/
1.2. Trip Hazard. while transiting around site. Supervisor
1.3. Fall of materials from height. 1.1.2. Where possible personnel should adhere to designated walkways.
1.4. Entering into the work place 1.1.3. Ensure flagmen with all plant vehicles.
without permit. 1.2.1. All work area should be kept free as far as reasonably practicable of
trailing cables, sleeper, packing etc.,
1.2.2. Protruded unwanted reinforcement steel should be removed from
1 walkways/work area.
1.2.3. Remove boulders, concrete wastes from the walkways/work area.
1.3.1. All personnel should maintain a safe working distance from other
overhead activities.
1.3.2. Personnel should not work/move under suspended loads.
1.3.3. If working at height, all tools and equipments should be secured
from displacement.
1.4.1. Obtain PTW before entering into the work place.
Positioning of Hydraulic 2.1. Improper placement of 2.1.1. Hydraulic breaker must be inspected & in good condition to use. Engineer/
excavator breaker. breaker 2.2.1. Only authorised operator should operate the excavator breaker. Supervisor
2.2. Unauthorised operation. 2.3.1. Always position the excavator breaker at a safe distance from
2 2.3. Availability of flagman in excavation edges.
every movement. 2.4.1. Ensure flagman is always available during operation & each
movement.

3 Equipment Operation 3.1. Reversing vehicle with 3.1.1. Only allow authorised operators to operate the hydraulic breaker Engineer/
restricted rear vision. 3.1.2. Hydraulic breaker must be fitted with reversing beepers. Supervisor
3.2. Splashing of concrete into 3.1.3. Ensure flagmen/signal man with excavator breaker for guidance.

Prepared By Reviewed By Approved By


Date :
03.09.2018
Vizag-Refinery Modernization Project, Visakhapatnam
JOB SAFETY ANALYSIS Document No.: 073876C001/502/JHA/6100/015 Rev. 00

eye 3.1.4. Always use mirrors to identify potential hazards & to eliminate them.
3.3. Operator cabin must be 3.1.5. Do not reverse into any direction without the guidance of flagmen.
protected with steel bars or steel 3.1.6. Ground personnel are not permitted in front or nearby areas while
mesh. Hydraulic excavator breaker is in operation.
3.4. Over extension of Excavator 3.1.7. Ensure fire hose is charged with hydrant during equipment operation
breaker boom length leads to time.
unstable condition. 3.2.1. Ensure fire extinguisher is always available with the equipment.
3.3.1. Excavator breaker daily safety checklist must be available & signed
by job engineer & HSE officer.
3.3.2. Ensure equipment fuelling time engine must be off.
Applying breaker 4.1. Defective breaker 4.1.1. Only use inspected and good condition breaker. Engineer/
4.1.2. Check the hydraulic hose doesn’t have leak. Supervisor
4 4.2. Slips and trips 4.2.1. Ensure proper area barricading to avoid tripping hazard.
4.2.2. Remove all unwanted materials.
Night work 5.1. Low visibility. 5.1.1. Low visibility hazard must be emphasized in tool box meeting. Engineer/
5.1.2. Ensure sufficient site lighting for job where required. Supervisor
5.1.3. Red/green light batons to be used for guiding vehicles during night
5.2. Fatigue works.
5
5.2.1. Adhere to good fatigue management practices.
5.2.2. Get a good session of sleep prior to commencing night shift.
5.2.3. Report to foremen/supervisor when symptoms of fatigue affect safe
operation.

Prepared By Reviewed By Approved By