Professional Documents
Culture Documents
2) Set pump into installed 1) Slipping Hazard 1) Lower pump to bottom of excavation P&M/Site
2) Tripping Hazard 2) Inspect pump and connect hose Engineer
3) Falling Hazard 3) function pump before lowering into well
4) Moderate lifting
3) Move hose to Excavation 1) Ergonomic Hazard 1) Utilize caution tape and cones to eliminate a P&M/Site
2) Pinch points trip hazard Engineer
3) Tripping Hazard 2) Connect cam lock fitting to excavation and
connect hose
3) Tape all connections
4) Pump water to Excavation 1) Equipment 1) Plug power cord into generator P&M/Site
movement 2) Utilize GFCI receptacle Engineer
2) Slipping Hazard 3) Verify water flow and check for leaks
3) Tripping Hazard 4) Monitor water levels
4) Falling Hazard
5) Moderate lifting
Name of the Preparation -- R.Ramesh Babu