JSA FOR DEWATERING OPERATION

Name of the site -- Nissan (2ASDU Project)

Date of the Preparation -- 15/01/2014

S.no Scope of Activities Hazard Control Measures Requested by


1) Barricade work area 1) Contact with 1) Barricade work area around excavator with P&M/Site
Vehicle highly visible barricades. Engineer
2) Ergonomic Hazard 2) Cones placed around excavation
3) Tripping Hazard 3) “Caution” tape
4) Slipping Hazard

2) Set pump into installed 1) Slipping Hazard 1) Lower pump to bottom of excavation P&M/Site
2) Tripping Hazard 2) Inspect pump and connect hose Engineer
3) Falling Hazard 3) function pump before lowering into well
4) Moderate lifting

3) Move hose to Excavation 1) Ergonomic Hazard 1) Utilize caution tape and cones to eliminate a P&M/Site
2) Pinch points trip hazard Engineer
3) Tripping Hazard 2) Connect cam lock fitting to excavation and
connect hose
3) Tape all connections

4) Pump water to Excavation 1) Equipment 1) Plug power cord into generator P&M/Site
movement 2) Utilize GFCI receptacle Engineer
2) Slipping Hazard 3) Verify water flow and check for leaks
3) Tripping Hazard 4) Monitor water levels
4) Falling Hazard
5) Moderate lifting
Name of the Preparation -- R.Ramesh Babu