Who and what all will be affected? DECC Employee, Sub/ Other contractors, Property, The Public, Visitors
Risk Rate Risk Rate
Description of (Initial Actions required PPE (Residual
No Significant Hazard Risks Action by
Task Risk) To reduce or control risks Required Risk)
L S R L S R
1. Trial trench
1 Welding, FIRE HAZARD There is a 3 4 1 Site Engineer must be on site Hard Hat 1 3 3 Project Engineer
cutting and potential chance 2 Permit work system available HI-VI Site Engineer
grinding work Of fire explosion for hot work activities Vest Forman
and cause fire Risk assessment are available Safety HSE Officer
injury and at site, but there is fire spark Shoes
material damage preventing control measure not
stated in the risk assessment
Ensure review he hot work risk
assessment done by competent
person
Advised to be remove all
flammable materials, fuel, gas
cylinder from welding work
area
Ensure fire blanket to prevent
Review Date: No1:___________No2____________No3____________
NOTE: Risk assessment should be completed by a site team member and a member of the safety department if possible
Page 2 of 4
ACTIVITY: HOT WORK RISK ASSESSMENT
fire spark source from grinding
work
Ensure all workers to comply
with PPE requirements. Safety
shoe, safety helmet,
safety glass, welding glass,
welding apron, welding face
shield and welding gloves
Ensure Welding cable should
be good condition with double
insulated
Welding machine pre use
inspection done by competent
person prior to start work
Ensure fire watchman
continuously monitoring the
hot work activity
Inspection to be done by
competent person before using
the electrical tools.
Ensure there is no molten slag
to be removed after completion
of hot work activity
Welding FIRE HAZARD Injury to 3 3 9 Ensure work areas in Hard Hat 1 3 3 Project Engineer
2 operative communal areas are HI-VI Site Engineer
and others appropriately cordoned off and Vest Forman
safety signage is in place Safety HSE Officer
When working in occupied Shoes
properties ensure that tenant is
aware of works being
undertaken and any associated
risks
Specific hot works hazards to
be covered in site induction
where appropriate
3 Exposure to Serious 3 4 1 Consult COSHH inventory list Hard Hat 1 4 4 Project Engineer
Review Date: No1:___________No2____________No3____________
NOTE: Risk assessment should be completed by a site team member and a member of the safety department if possible
Page 3 of 4
ACTIVITY: HOT WORK RISK ASSESSMENT
Hazardous injury 2 and control approach prior to HI-VI Site Engineer
substances Delays in the use of or creation of Vest Forman
specific hazardous substances or Safety
works materials Shoes
PPE to be issued, recorded,
monitored and replaced where
appropriate
Appropriate PPE to be
supplied and worn as identified
The above risk assessment is briefed and I have read and understood the Hazards, risks and control measures that to be adopted.
Sl.
Name Designation Signature Date
No.
1 SAEED ELSAYED SITE ENGINEER
2 SASIKUMAR HSE ENGINEER
3 IBRAHIM FOREMEN