Hindustan Prefab limited

(A Govt. of India Enterprises)


Jangpura, New Delhi
ABSTRACT OF COST

Name of Contractor M/s Eco Water Solutions - New Delhi


Construction of 200 KLD STP at Panchkarma
Name of site
Hospital, Poojapura- Trivendrum
Bill No. and Date RA Bill No.I Dated …30/01/2014………………

Total value of work done upto date B/F (A) Rs. 2128059.65
Less Gross amount of last bill paid vide MB No. Page No.
Gross amount payable in this bill (B) Rs. 2128059.65
Deductions
1 Security deposit on total work done 5% 106,402.98
Less already recovered vide MB No Page No.
Net recoverable in this Bill
2 Income Tax on the total work done 2% 42,561.19
Less already recovered vide MB No Page No.
Net recoverable in this Bill
3 Cost of WCT 3% 63,841.79
Less already recovered vide MB No Page No.
Net recoverable in this Bill
4 Cost Labour Cess 1% 1,064.03
Less already recovered vide MB No Page No.
Net recoverable in this Bill
5 Mobilization advance paid vide MB No Page No.
Already recovered vide MB No Page No.
Now recoverable in this Bill
6 Security advance paid vide MB No Page No.
Already recovered vide MB No Page No.
Now recoverable in this Bill
7 Interest on Mobilizationadvance
8 Any other advance/recoveries
Total deduction (C) 213,869.99
Net payable (B) - © 1,914,189.66

S.O AE/AEE PROJECT MANAGER CONTRACTOR

Checked and passed for payment for Paid vide cheque / DD No ……………..
Rs …………………………………. dated …………. For Rs…………………..
Hindustan Prefab limited
(A Govt. of India Enterprises)
Jangpura, New Delhi
BILL FORM
Bill No - RA Bill No.I Dated 30/01/2014 Name of Site /Department Kerala Projects
Name of the work Construction of 200 Construction of 200 KLD STP
KLD STP at at Panchkarma Hospital,
Panchkarma Hospital Poojapura - Trivendrum
Name of the contractor M/s Eco Water Solutions - New Delhi
Reference of letter of award HPL/CE/LOA/2012-13/151/1322
Date of start - 24th April Date of Measurement 30/01/2014
Date of completion 31th December EOT Granted (i) Provisional
Date of actual completion ……………. EOT Granted (ii) Final

% of Qty of
Item Amount Up to
Description of Items of Work Executed Work Unit Work Done Rate/Unit
No. Date
Executed up to Date

1 Anaerobic Upflow Reactor 0.55 Each 1 631974.00 347,585.70


2 Secondary Clarifier 0.55 Each 1 514279.00 282,853.45
3 Treated water tank 0.90 Each 1 103944.00 93,549.60
4 Filter Feed Tank 0.90 Each 1 103944.00 93,549.60
5 Sludge Holding Tank 0.90 Each 1 173281.00 155,952.90
6 Equilization/collection Tank 0.90 Each 1 173985.00 156,586.50
7 Aeration tank 0.50 Each 1 1458402.00 729,201.00
8 primary Clarifier 0.50 Each 1 388907.00 194,453.50
Control Pannel Room 0.20 Each 1 371637.00 74327.40

Gross Value of Bill up to date 2,128,059.65


Gross Amount paid in last bill
Gross Amount payable in this bill 2,128,059.65

For Eco-Water Solutions


For Hindustan Prefab Ltd.
Technologies Pvt. Ltd.
CERTIFICATES

The work has been done as per CPWD specifications and as per instructions of Engineer in
1
charge

2 Tools and Plants required for the execution of work have been arranged by the contractor

3 Electricity and water have been arranged by the contractor

No labour disput has risen at site and all the labour payments have been made by the
4
contractor and no complaint in this regard has been received so far

5 Contractor is following all labour laws as per Kerala Govt. rule

6 No recovery is pending from the contractor othe than the proposed in the bill

S.O A.E/A.E.E Sr. Engineer Project Manager


Hindustan Prefab limited
(A Govt. of India Enterprises)
Jangpura, New Delhi
Measurement
Bill No - RA Bill No.I Dated …28/1/2014.. Name of Site /Department Kerala Projects
Construction of 200 KLD STP at Panchkarma
Name of the work
Hospital, Poojapura- Trivendrum
Name of the contractor M/s Eco Water Solutions - New Delhi
Reference of letter of award HPL/CE/LOA/2012-13/151/1322
Date of start …24th April…….. Date of Measurement 30/01/2014. s

I Civil Works

% of % of
Item
Description of Items of Work Executed Cost of Work Unit
No.
Unit Executed

1 Collection Tank
13.0 m dia x3.3 m LD (Including FB)
Approval of design and drawings 10.00 10.00
E / W Excavation 10.00 10.00
Concreting of Raft 15.00 15.00
Concreting walls (Full height) 45.00 45.00
Successful hydraulic test 10.00 10.00
Commisioning 10.00
Total % of work executed 90.00
Quantity in this bill 90.00
Quantity paid in last bill 0.00
Quantity up to date 90.00 Each

2 Primary Settling Tank


Approval of design and drawings 10.00 10.00
E / W Excavation 10.00 10.00
Concreting of Raft 10.00 10.00
Concreting walls (1/2 height) 20.00 20.00
Concreting walls (Full height) 25.00
Successful hydraulic test 10.00
Installation of rake mechanism 5.00
Commisioning 10.00
Total % of work executed 50.00
Quantity in this bill 50.00
Quantity paid in last bill 0.00
Quantity up to date 50.00 Each

Anaerobic Upflow Reactor


3
Approval of design and drawings 10.00 10.00
E / W Excavation 10.00 10.00
Concreting of Raft 15.00 15.00
Concreting walls (1/2 height) 20.00 20.00
Concreting walls (Full height) 25.00
Successful hydraulic test 10.00
Commisioning 10.00
Total % of work executed 55.00
Quantity in this bill 55.00
Quantity paid in last bill 0.00
Quantity up to date 55.00 Each

4 Aeration Tank
Approval of design and drawings 10.00 10.00
E / W Excavation 10.00 10.00
Concreting of Raft 10.00 10.00
Concreting walls (1/2 height) 20.00 20.00
Concreting walls (Full height) 25.00
Successful hydraulic test 10.00
Installation of blower , diffuser etc complete 5.00
Commisioning 10.00
Total % of work executed 50.00
Quantity in this bill 50.00
Quantity paid in last bill 0.00
Quantity up to date 50.00 Each

5 Secondary Settling Tank


Approval of design and drawings 10.00 10.00
E / W Excavation 10.00 10.00
Concreting of Raft 10.00 10.00
Concreting walls (1/2 height) 25.00 25.00
Concreting walls (Full height) 25.00
Successful hydraulic test 10.00
Commisioning 10.00
Total % of work executed 55.00
Quantity in this bill 55.00
Quantity paid in last bill 0.00
Quantity up to date 55.00 Each
6 Filter Feed Tank
Approval of design and drawings 10.00 10.00
E / W Excavation 10.00 10.00
Concreting of Raft 10.00 10.00
Concreting walls (1/2 height) 25.00 25.00
Concreting walls (Full height) 25.00 25.00
Successful hydraulic test 10.00 10.00
Commisioning 10.00
Total % of work executed 90.00
Quantity in this bill 90.00
Quantity paid in last bill 0.00
Quantity up to date 90.00 Each

Treated Water Storage Tank


7
Approval of design and drawings 10.00 10.00
E / W Excavation 10.00 10.00
Concreting of Raft 10.00 10.00
Concreting walls (1/2 height) 25.00 25.00
Concreting walls (Full height) 25.00 25.00
Successful hydraulic test 10.00 10.00
Commisioning 10.00
Total % of work executed 90.00
Quantity in this bill 90.00
Quantity paid in last bill 0.00
Quantity up to date 90.00 Each

Anaerobic Sludge Digestor Tank


8
Approval of design and drawings 10.00 10.00
E / W Excavation 10.00 10.00
Concreting of Raft 10.00 10.00
Concreting walls (1/2 height) 25.00 25.00
Concreting walls (Full height) 25.00 25.00
Successful hydraulic test 10.00 10.00
Commisioning 10.00
Total % of work executed 90.00
Quantity in this bill 90.00
Quantity paid in last bill 0.00
Quantity up to date 90.00 Each

9 Control Pannel Room


Approval of design and drawings 10.00 10.00
E / W Excavation 10.00 10.00
concreating of framed structure 15.00
completion of roof slab 25.00
completion of brick work 20.00
plastering and finishing 20.00
Total % of work executed 20.00
Quantity in this bill 20.00
Quantity paid in last bill 0.00
Quantity up to date 20.00 Each

Electro Mechanical Equipments & Pipe


10
line laying
Approval of data sheets 10.00
Supply of all Electro mechanical equipments 60.00
Completion of erection 10.00
Successful Trial run 10.00
Commisioning 10.00
Total % of work executed 0.00
Quantity in this bill 0.00
Quantity paid in last bill 0.00
Quantity up to date 0.00 Each