Lucky Engineering Services

Risk Assessments for Date:


Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

RA-001 Welding & Gas Cutting Scope: Welding & Gas Cutting Rev:01
Risks

 Oxy-Acetylene Cylinders Storage.


 Electric Welding Set
 Grinder
 Unauthorized Operation
 Unsuitable Working Environment (including low illumination work areas)
 Work inside confined space
 Fire & Explosion
 Sever Burn
 Property Damages
 Electric Shock
 Eye damage of various kinds, either from exposure to light or from particles in the eye.
 Heat Stress leading to fainting in extreme conditions.
 Respiratory problems from exposure to the welding fume.
 Systematic poisoning off fumes from galvanized, lead-coated or other toxic metals, e.g.
 Ignition of other flammable materials whilst welding.
 Metal Spatter.
 Gases and fume iron oxide, carbon monoxide, ozone gas nitrous fumes and carbon (when combustion is incomplete).

Who / What may be affected ( Project Specific)


Site Workers Client / Client Representative Visitors

Staff Persons in the Vicinity Property

Initial Risk Rating (Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
4
X 4
= 16

Control Measures

 Valid hot works permit.


 Hot works permit for a shift only. Next shift, next permit in case of night shift.
 Confined space permit for work inside confined space along with hot work permit.
 Only competent and authorised personnel are permitted to carry out welding work.
 Must have fire watch for period after work has been completed as fires often start later.
 Fire resisting sheets (fire blankets) should be used to protect the surroundings from flame and spotter.
 Appropriate PPE will used when welding – gauntlets, welding shield, flame retardant overalls. Leather sleeves shoulder
drapes are to be use when welding upwards.
 Equipment will be well maintained and inspected as per manufacturer’s recommendations.
 Welding works will be carried out in well ventilation may be required.
 Grinder must be 110v only complying with current colour coding system. Visual checks before use.
 Extra ventilation, fans required to reduce the likelihood of heats stress and occurrence.
 Reduce time exposure should be considered especially during summer months.
 Prolonged welding operations to be shielded from the sighting of adjacent operatives to reduce the risk of ‘arc-eye’.
 If welding operations are being undertaken on coated metals, air sampling should be carried out and consideration given
to the use of respirators of this work. Oxygen / Acetylene hoses, gauges should be checked regularly to avoid any
leakages.
 Flash back arrestors should be fitted on every gas cylinders sets.
 If conducting welding works near hazardous area, it must be covered / isolated properly to avoid flux falling on the
hazardous materials.

Page 1 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

Control Measures
 Gas welding torch to be checked regularly.
 Sufficient illumination at work areas, LUX meter can be used to measure.
 Welding sets calibration.
 Oxy-Acetylene cylinders must be stored at designated areas & keep segregated with an appropriate distance. Don’t store
inside buildings. Keep cylinder upright and secured.
 At work areas oxy-acetylene cylinders must be carried inside specified trolleys.

Required Permits
Excavation Hot Works Confined Space Ladder OPE Diving

ESSWP Add Add Add Add Add

Add Add Add Add Other Detail as required

Responsibilities / Accountabilities
General Manager Lifting Coordinator Admin Manager Lifting Scaffold Supervisor
Foreman
Supervisor
Services Emergency Response
Staff Site Manager Safety Team Dive Master
Coordinator
Procurement Engineering Commercial
Project Engineer Quality Team Human Resources
Manager Manager Manager
Marine
Project Manager Logistic
Superintendent Add Other Detail as required
Coordinator

Training Requirements (Both Internal & External)


Site safety Induction Power tools operation
Tool box talks Working at height
Welding/Gas Cutting

PPE Requirements
Site Mandatory PPE Hand gloves
Face shield
Safety Shoes

Residual Risk Rating (Further to implementation of Controls – Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
1 X 4 = 4

Page 2 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

RA-002 Loading & Unloading Materials Scope: Loading & Unloading Materials using Boom Loader/Forklift
Rev:01
Risks
 Machine Failure
 Falling of Object/Material
 Failure of Crane
 Failure of lifting gears
 Material break / damage
 Injury to person/operators Fatality
 Material break / damage
 Injury to person/operators

Who / What may be affected ( Project Specific)


Site Workers Client / Client Representative Visitors

Staff Persons in the Vicinity Property

Initial Risk Rating (Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
4
X 5
= 20

Control Measures
 Third party certificate for crane, operator and riggers.
 All the lifter gear should have third party certificate and physically in good condition.
 Lifting permit prior.
 All the lifter gear should have third party certificate and physically in good condition. Color Coding
 Loading and unloading area must be barricaded and signage’s to be installed
 Loading and unloading of material should occur at designated dispatch and receivable points
 A lifting supervisor to be assigned
 Rigger shall check rigging & slinging before lifting
 Load must be raise to require height to move to designated place
 Proper supervision by rigging foreman for unloading & loading
 Ensure dead end of wire rope is properly secured.
 Trained and experience driver should operate crane only.

Required Permits
Excavation Hot Works Confined Space Ladder OPE Diving

ESSWP Add Add Add Add Add

Add Add Add Add Other Detail as required

Responsibilities / Accountabilities
General Manager Lifting Coordinator Admin Manager Lifting Scaffold Supervisor
Foreman
Supervisor

Page 3 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

Construction Services Emergency Response


Staff Safety Team Dive Master
Manager Coordinator
Procurement Engineering Project Commercial
Quality Team Human Resources
Manager Manager Engineer Manager
Marine
Project Manager Logistic
Superintendent Add Other Detail as required
Coordinator

Training Requirements (Both Internal & External)


Site safety Induction
PPE training

PPE Requirements
Site Mandatory PPE Task Specific PPE

Residual Risk Rating (Further to implementation of Controls – Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
1 X 5 = 5

RA-003 Manual Handling Scope: Manual Handling Rev:01


Risks

Page 4 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

 Lifting Heavy loads


 Twisting while lifting
 Poor underfoot conditions
 Top heavy bending
 Previous back problems
 Injury to Person
 Material/Asset damage
 Body Pain, Back Pain, Muscular skeleton problem.

Who / What may be affected ( Project Specific)


Site Workers Client / Client Representative Visitors

Staff Persons in the Vicinity Property

Initial Risk Rating (Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
3
X 3
= 9

Control Measures

 Plan to eliminate the need to manually lift.


 One person maximum allowed lifting is 25 kgs otherwise indicated.
 Review the task, the individuals capability, the load itself and the working environment.
 Can the load be split into smaller ones?
 Check environment for space constraints, uneven untidy ground and variation in work, surface/height poor lighting and
extremes of temperature/humidity.
 Check individuals strength limits/physical disabilities.
 Display appropriate warning sign
 DSTI’s
 Ensure adequate rest periods/recovery periods are followed between lifts/activities.
 Access the load prior to lifting
 Use gloves that offer adequate protection and aid grip.
 Proper: lifting techniques will be followed:
1)Position in front of the load with legs balanced and spread equal to shoulder width
2) Bend the knees to reach the bottom of the load to get a grip; do not bend the spine.
3)Lift load slowly by gradually straightening the legs
4)Do not twist spine if you need to change direction; turn whole body instead.
5) Carry the load as close to your body and as high as your weight.

Required Permits
Excavation Hot Works Confined Space Ladder OPE Diving
Working at Height
ESSWP Add Add Add Add

Add Add Add Add Other Detail as required

Page 5 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

Responsibilities / Accountabilities
General Manager Lifting Coordinator Admin Manager Lifting Scaffold Supervisor
Foreman
Supervisor
Construction Services Emergency Response
Staff Safety Team Dive Master
Manager Coordinator
Procurement Engineering Commercial
Project Engineer Quality Team Human Resources
Manager Manager Manager
Marine
Project Manager Logistic
Superintendent Add Other Detail as required
Coordinator

Training Requirements (Both Internal & External)


Site safety Induction Scaffolding access procedures
Working At height Training & certification Man lift operator

PPE Requirements
Site Mandatory PPE Face Shields
Safety Harnesses (Double Lanyards) Welding Masks
Gloves (decking and steel handling) Respiratory Protective Equipment

Residual Risk Rating (Further to implementation of Controls – Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
1 X 3 = 3

RA-004 Use of Hand tools Scope: Use of Hand tools for driving bolts and beating metal Rev:01
Risks

 Damaged tools.

Page 6 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

 Improvised tools
 Sharp edges.
 Cuts, Abrasions, Amputations to fingers and body parts of a persons.
 Injury to eyes.
 Broken bones and bruises.
 Fall of tools from height.

Who / What may be affected ( Project Specific)


Site Workers Client / Client Representative Visitors

Staff Persons in the Vicinity Property

Initial Risk Rating (Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
4
X 4
= 16

Control Measures

 Ensures the condition of the hand tools are good, when obtaining from the stores
 Hand tools shall not be kept on walkways.
 Hand tools shall be kept in tool boxes whenever not in use.
 All tools shall be inspected for any damages on daily basis and at regular intervals
 Tie off tools with a rope to prevent its fall while working at height or near egdes.
 Don't keep any tools unattended at the height after work.
 Tools should be free of oil & grease.
 Secure the tools properly to prevent fall from height
 Proper maintenance of tools should be done periodically.
 Store keeper will inspect all the new tools before issuing to site.
 Ensure operatives are wearing hand gloves during activity.

Required Permits
Excavation Hot Works Confined Space Ladder OPE Diving

ESSWP Add Add Add Add Add

Add Add Add Add Other Detail as required

Responsibilities / Accountabilities
General Manager Lifting Coordinator Admin Manager Lifting Scaffold Supervisor
Foreman
Supervisor
Construction Services Emergency Response
Staff Safety Team Dive Master
Manager Coordinator
Procurement Engineering Commercial
Project Engineer Quality Team Human Resources
Manager Manager Manager
Marine
Project Manager Logistic
Superintendent Add Other Detail as required
Coordinator

Training Requirements (Both Internal & External)

Page 7 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

Site safety Induction


Working at height

PPE Requirements
Site Mandatory PPE
Safety Goggles

Residual Risk Rating (Further to implementation of Controls – Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
1 X 4 = 4

RA:005 Potable Electrical Equipment Scope: Potable Electrical Equipment for grinding and welding of components on site Rev:01
Risks

 Faulty/damaged equipment.
 Site environment.
 Trailing leads.

Page 8 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

 Poor Posture.
 Untrained Users.
 Injury to Person
 Damage to Property
 Eye Injury/Skin Injury
 Back pain, Muscle Cramp
 Electric Shock
 Flying Particle
 Noise
 Vibration

Who / What may be affected ( Project Specific)


Site Workers Client / Client Representative Visitors

Staff Persons in the Vicinity Property

Initial Risk Rating (Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
4
X 4
= 16

Control Measures

 All portable electrical equipment will be individually identified (colour coded) and subject to planned maintenance.
 Only 110V tools allowed, if above required then obtained permit from main contractor.
 Equipment supplied will be fit for purpose with regard to voltage, power and environmental conditions.
 Visual inspection of equipment will be carried out before use.
 Safety goggles/ face shield must be wearing while operating tools.
 Training/TBT to be conducted prior to use tools.
 Ensure the drill machine is inspected and color coded.
 Ensure plug, drill bit, drilling machine and electrical cables are free from defects.
 Ensure the power tools are provided with yellow colored industrial socket.
 Don’t bend and hold the material between legs and operate the power tool.
 Competent Operator.

Required Permits
Excavation Hot Works Confined Space Ladder OPE Diving

ESSWP Add Add Add Add Add

Add Add Add Add Other Detail as required

Responsibilities / Accountabilities
General Manager Lifting Coordinator Admin Manager Lifting Scaffold Supervisor
Foreman
Supervisor
Construction Services Emergency Response
Staff Safety Team Dive Master
Manager Coordinator
Procurement Engineering Project Engineer Commercial Quality Team Human Resources

Page 9 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

Manager Manager Manager


Marine
Project Manager Logistic
Superintendent Add Other Detail as required
Coordinator

Training Requirements (Both Internal & External)


Site safety Induction
PPE training
Use of Portable Power Tools

PPE Requirements
Site Mandatory PPE Task Specific PPE
Safety Goggles
Safety Gloves

Residual Risk Rating (Further to implementation of Controls – Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
1 X 4 = 4

RA:006 Hot Works Scope: Hot Works Include Grinding Cutting, Welding for Fitting Items on Site Rev:01
Risks

 Electric Welding Set.


 Grinder.

Page 10 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

 Unauthorized Operation.
 Unsuitable Working Environment (including low illumination work areas).
 Fire & Explosion.
 Severe Burns.
 Severe Injuries
 Property Damages.
 Electric shock.
 Eye damage of various kinds, either from exposure to light or from particles in the eye.
 Heat stress leading to fainting in extreme conditions.
 Respiratory problems from exposure to the welding fume.
 Systemic poisoning off fumes from galvanised, lead-coated or other toxic metals, e.g. metal fume fever manifests itself in
the form of a flu-like illness which can last two to three days.
 Ignition of other flammable materials whilst welding operations are under way.
 Metal spatter.
 Infra red and visible light given off by welding gas.
 Ultra-violet radiation given off by electric arc welding.

Who / What may be affected ( Project Specific)


Site Workers Client / Client Representative Visitors

Staff Persons in the Vicinity Property

Initial Risk Rating (Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
X =
3 4 12

Control Measures

 Valid hot works permit.


 Hot works permit for a shift only. Next shift next permit in case of night shift.
 Only competent and authorised personnel are permitted to carry out welding work.
 Consider fire watch for period after work has been completed as fires often start later.
 Fire resisting sheets (fire blankets) should be used to protect the surroundings from flame and spatter.
 Appropriate PPE will be used when welding – gauntlets, welding shield, flame retardant overalls. Leather sleeves,
shoulder drapes are to be used when welding upwards.
 Equipment will be well maintained and inspected as per manufacturer’s recommendations.
 Welding works will be carried out in well ventilated locations when possible. If not forced ventilation may be required.
 Grinder must be 110v only complying to current colour coding system. Visual checks before use.
 Extra ventilation should be introduced to reduce the likelihood of heat stress occurrence.
 Reduced time exposure should be considered especially during summer months.
 Prolonged welding operations to be shielded from the sightline of adjacent operatives to reduce the risk of ‘arc-eye’.
Plywood boards may be used.
 If welding operations are being undertaken on coated metals, air sampling should be carried out and consideration given
to the use of respirators for this work.
 If conducting welding works near hazardous area, it must be covered/ isolated properly to avoid flux falling on the
hazardous materials.
 Sufficient illumination at work areas, LUX meter can be used to measure.
 Welding sets calibration.

Required Permits

Page 11 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

Excavation Hot Works Confined Space Ladder OPE Diving

ESSWP Add Add Add Add Add

Add Add Add Add Other Detail as required

Responsibilities / Accountabilities
General Manager Lifting Coordinator Admin Manager Lifting
Foreman Scaffold Supervisor
Supervisor
Construction Services Emergency Response
Staff Safety Team Dive Master
Manager Coordinator
Procurement Engineering Commercial
Project Engineer Quality Team Human Resources
Manager Manager Manager
Marine
Project Manager Logistic
Superintendent Add Other Detail as required
Coordinator

Training Requirements (Both Internal & External)


Site safety Induction
PPE training
Use of Portable Power Tools

PPE Requirements
Site Mandatory PPE Task Specific PPE
Safety Goggles
Safety Gloves

Residual Risk Rating (Further to implementation of Controls – Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
X =
1 4 4

RA:007 Work at Height Scope: Works at Height Rev:01


Risks

 Working at Edge.
 Working Outside of Edge Protection.
 Objects & Man Falling from Height.
 Major Injury.

Page 12 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

Who / What may be affected ( Project Specific)


Site Workers Client / Client Representative Visitors

Staff Persons in the Vicinity Property

Initial Risk Rating (Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
X =
4 4 16

Control Measures

 Obtain WAH Permit from main contractor.


 Obtain Permit to remove safety controls where absolutely required.
 Full Time Supervisor.
 Safety Harness shall be hooked at suitable location.
 Exclusion zone.

Required Permits
Excavation Hot Works Confined Space Ladder OPE Diving

ESSWP Add Add Add Add Add

Add Add Add Add Other Detail as required

Responsibilities / Accountabilities
General Manager Lifting Coordinator Admin Manager Lifting
Foreman Scaffold Supervisor
Supervisor
Construction Services Emergency Response
Staff Safety Team Dive Master
Manager Coordinator
Procurement Engineering Commercial
Project Engineer Quality Team Human Resources
Manager Manager Manager
Marine
Project Manager Logistic
Superintendent Add Other Detail as required
Coordinator

Training Requirements (Both Internal & External)


Site safety Induction
PPE training
Use of Portable Power Tools

PPE Requirements
Site Mandatory PPE Task Specific PPE
Safety Goggles
Safety Gloves

Page 13 of 14
Lucky Engineering Services
Risk Assessments for Date:
Miscellaneous Metal Project: Construction of 7 Projects 06/06/2020
Works in Al Ain Zoo

Residual Risk Rating (Further to implementation of Controls – Project Specific)


Likelihood (L) Severity (S) Risk Rating (RR)
X =
1 4 4

Page 14 of 14