M-DT-MS-07135.16-ST-008-A Response
M-DT-MS-07135.16-ST-008-A Response
Material
Material
Material
6. Inspection plans
for application is
missing.
Differentiate the layer
in 2 parts, horizontal
application and
vertical application
for pump room walls.
list the PPE as per sds
Chemical exposure
to the personnels
housekeeping
proper materials stacking and storaage
power tools are to be inspected by competent electrician
Grinder to be guarded
grinding wheel to be fixed by competent and trained personnels
rpm of grinding wheel to be more than machine/
how work permit to be implemented
, apron,
Use of gas cylinders are to be included in the risk assessment