RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
materialswith the help of JCB and Plate Compactor
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
with the help of JCB and Plate Compactor
Page 2 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor
damage due to
Trap in equipment and accessories.
accident. Inspection & approval of the Heavy lift
between of
body part arrangements including de-slinging.
during Ensure the Heavy lift erection sequence is
loading. well designed & plan approved.
Page 3 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
leveling with the help of JCB and Plate Compactor
Flying current damage due to fire. Proper storage of tools power tools.
objects Work force Electric Shock Use only with required protective handles.
Use tool with proper guard only
3 4 12 2 2 4 Y
Portable
Page 4 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
leveling with the help of JCB and Plate Compactor
/ Large in and other structures of the back in lifting. Prefer mechanical aid if possible.
quantity and Abdominal hernias Manual handling technique need to apply
oversized. Chronic pain etc. Grip the load properly. Ensure synchronization
between the load lifters.
Load must be rested in between in case of
al Handling
Page 5 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
leveling with the help of JCB and Plate Compactor
Page 6 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
with the help of JCB and Plate Compactor
supervision of
long work condition and adequate welfare facility will be
temperature
temperat measure Skin rashes, Job rotation will be implemented. Rest area with
during Heat stroke Trained first aider available. (As per OSHAD-SF proper
ure Cop 9.0 Workplace Wellness)
summer ventilation
Page 7 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor
Page 8 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor
Page 9 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor
All personnel in the team are to be made aware of the safe systems of work.
Supervisors should ensure that all lifting gear used are in good condition and safe for use.
Workers and supervisors should be trained in the use of power tools and machinery to ensure that equipment is maintained in good condition prior to and during use.
Ensure that good house keeping standard is maintained through out.
Page 10 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor
First-aid facilities should be available to cope with any significant injuries that may arise from the work.
Monitoring and review
Work should be monitored by Foreman and charge hand who are trained to ensure that any additional precautions or equipment required are provided.
Page 11 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor
Page 12 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor
Page 13 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor
Aim to reduce risks but costs of prevention may be limited. Undertake a risk assessment of the situation / task and implement the appropriate actions. Actions should have a
5-12 timescale and should be monitored. Where the risk involves work in progress undertake a risk assessment as soon as possible to ensure the safety of the situation or task.
Medium Work should not start until the risk is reduced to an acceptable level. Considerable resources may have to be allocated. Contact your Manager and Risk Manager by
telephone about the actions that should be taken to reduce the risk/s. incident report must be completed. Incident must be added to service risk register.
Page 14 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor
Page 15 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor
Page 16 of 16