You are on page 1of 16

RISK ASSESSMENT

TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
materialswith the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o
Collision  Workers due  Personal injuries due to collision with
 Permit / NOC should be obtained from
with to hit with vehicles appropriate authority prior to commencement of
adjacent moving  Property damage due to contact with task. PTW must be obtained for each area
structure / separately.
and leveling

equipment other structure/ Moving vehicles and


vehicles /
persons.  Equipment machines  Proper instructions to be given to the
damage due to responsible persons during the mobilization of
Inconvenien vehicles and equipment’s.
ce to traffic collision.
uipment Site

or  Designated areas to be arrange beforehand


 Property due
surrounding with the client/contractors for the special
to hit with arrangements for parking and storing.
persons/ped
moving  Equipment should have reverse alarm, front
Page 1 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o
Equipement  Workers due  Personal injury workers moving  A valid permit to be issued.
collision with to hit with around.  Area should be barricaded and adequate
workers, moving  Property damage signage is to be provided.
Objects and
Site leveling

equipment  Property/Equipment damage due to  Certified flagman to be used.


other
oom loader and bobcat

moving  Property fire.  Operator / Rigger to be certified.


machinery, damage due to  Equipment should have valid TPC.
Equipment. accident.  Utilities should be identified and marked.
Falling  Property  Lifting plan should be available
objects.
damage  Wing speed must be checked.
Tilting of
 Outriggers should be fully extended. Staff should be
ipment

Page 2 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o
Fall of load.  Workers due
to hit with  Permits need to take before the activity.
Overturning  Design, Planning & preparation of Heavy
of crane. moving Lift
Load hit with equipment  Safe Heavy lifting procedure.
adjacent  Property  Competent Riggers & operators
structure.  Testing & certification of the lifting
roofing material

damage due to
Trap in equipment and accessories.
accident.  Inspection & approval of the Heavy lift
between of
body part arrangements including de-slinging.
during  Ensure the Heavy lift erection sequence is
loading. well designed & plan approved.

Page 3 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o
Electricity  Workers due  Cuts, Puncturing due to contact with
Fire contact with sharp personal injury to operator
moving parts  Personal Injury/ fatality while using  Proper inspection/maintenance of tools
Rotating
rinder, Drill, Hammer

 Replace/repair defective tools Regular


parts /Wheel of tools and the tool.
 Use with proper PPE inspection to be
Dust due to electric  Damage to the tool or job-Property
SiteHand/

 Correct usage as per procedure carried out for


Power Tools

Flying current damage due to fire.  Proper storage of tools power tools.
objects  Work force  Electric Shock  Use only with required protective handles.
 Use tool with proper guard only
3 4 12 2 2 4 Y
Portable

Sounds and due to noise,  Hit by fling fragments Ensure to be


 Trained personnel
noise Vibration and  Tripping and falling full compliance
 Do not use loose cloth while using tools with
Vibration dust.  Inhalation of dust lungs effected. rotating. with OSHAD-SF

Page 4 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak / Acquire current utility drawings. Carry out o
Manual  Worker force  Muscle sprains, and strains due to  Load must be assessed before lifting, and check
Handling due to lifting lifting heavy items the path for tripping/slipping hazard in which the
load would be carried.
the heavy load  Injuries to muscles, ligaments, discs  Assess physical capacity of the persons involved
Site(Manual)

/ Large in and other structures of the back in lifting. Prefer mechanical aid if possible.
quantity and  Abdominal hernias  Manual handling technique need to apply
oversized.  Chronic pain etc.  Grip the load properly. Ensure synchronization
between the load lifters.
 Load must be rested in between in case of
al Handling

traveling long way.


 Ensure load is not obstructing the vision. Proper
5 3 15  Engage extra person to guide who is not involved 2 2 4 supervision of Y

Page 5 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o
SiteBitumen
rmal paint,

 Environment  Use of trained personnel


Leakage due to  Keep away the source of ignition
 Contaminate the soil due to leakage

Page 6 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak / Acquire current utility drawings. Carry out o
 Workers due  Management will provide anti-dehydration
to extreme powder for all workers during hot climate.
 Heat stress to the workers  Abu Dhabi summer working time will be followed
levelinghot

hot weather working direct to sun light (June 15 – Sept 15).


or due to Close
 Headache to work force  Consultation with employees about health
in extreme

supervision of
long work condition and adequate welfare facility will be
temperature

Excessiv  Dizziness due to increase of body the area.


without any provided at the work location. (Rest area,
e heat core temperature Drinking water station, Toilets, First aid facility Proper rest
and control  Vomiting, 3 5 15 and emergency arrangements. 2 2 4 break Y
WorkingSite

temperat measure  Skin rashes,  Job rotation will be implemented. Rest area with
during  Heat stroke  Trained first aider available. (As per OSHAD-SF proper
ure Cop 9.0 Workplace Wellness)
summer ventilation

Page 7 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o

Page 8 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o

Personal protective equipment

Page 9 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o
 Safety Helmet, Safety Shoes, Ear plugs, Face shield/Visor, Appropriate Gloves & Safety Goggles
Information, instruction and training

 All personnel in the team are to be made aware of the safe systems of work.
 Supervisors should ensure that all lifting gear used are in good condition and safe for use.

 Workers and supervisors should be trained in the use of power tools and machinery to ensure that equipment is maintained in good condition prior to and during use.
 Ensure that good house keeping standard is maintained through out.

Page 10 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o
Emergency procedures
 Site emergency procedures should make provision for the rescue of individuals from injuries.

 First-aid facilities should be available to cope with any significant injuries that may arise from the work.
Monitoring and review
 Work should be monitored by Foreman and charge hand who are trained to ensure that any additional precautions or equipment required are provided.

Page 11 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o

Page 12 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o
RISK MATRIX Risk Rating (RR) – Severity x Likelihood
LIKELIHOOD
Likely
Rare Unlikely Possible Almost certain
Could happen often (on
Remote possibility (once Could happen but rare Could happen occasionally Could happen frequently (once
L average once a month or
every 3 years or more) (typically once in a year) (on average quarterly) a week or more)
SEVERITY more)
1 2 3 5
(IMPACT) S 4

Low Low Low Low Medium


Insignificant 1
1 2 3 4 5
Low Low Medium Medium Medium
Minor 2
2 4 6 8 10
Low Medium Medium Medium High
Moderate 3
3 6 9 12 15
Significant 4 Low Medium Medium High High

Page 13 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak / 4 8 12  Acquire current
16 utility drawings. Carry
20 out o
Medium Medium High High High
Major 5
5 10 15 20 25
RISK BASED CONTROL PLAN
RISK LEVEL ACTION AND TIMESCALE
1-4 Quick, easy controls should be implemented immediately and further action planned for when resources permit. Monitoring required ensuring controls are maintained. Manage
Low through routine procedures. Go for economic improvements where possible. Incident report must be completed.

Aim to reduce risks but costs of prevention may be limited. Undertake a risk assessment of the situation / task and implement the appropriate actions. Actions should have a
5-12 timescale and should be monitored. Where the risk involves work in progress undertake a risk assessment as soon as possible to ensure the safety of the situation or task.
Medium Work should not start until the risk is reduced to an acceptable level. Considerable resources may have to be allocated. Contact your Manager and Risk Manager by
telephone about the actions that should be taken to reduce the risk/s. incident report must be completed. Incident must be added to service risk register.

Page 14 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  safety Acquire current
Do not commence the activity until a risk assessment has been completed to ensure the of the situation or utility
task. Ifdrawings. Carry to
it is not possible out
reduce or eliminate the risk o
15-25
even with unlimited resources, work must remain prohibited. Inform your relevant Director, your Manager and the Risk Manager immediately by telephone. Incident report
High
must be completed. Incident must be added to service risk register.

Prepared by: Emirates Link Maltauro


Prepared by : Project HSE Manager Reviewed by : PM
Name : Najam ul Hassan Abbasi Name : Ahmed Zeiter
Sign : Sign :

Page 15 of 16
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Concrete work

RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing

ASSESSOR: Safety & Project Departments ASSESSED DATE: 16/1/2023 REVIEWED DATE: 15/02/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing m
 Property damage due to collision of moving vehicles
underground services. p
vehicles with
Site leveling with the help of JCB and Plate Compactor

 Personal ill health /Fatality due to Gas leak.


other adjacent  Arrangement Plan of proper site safety l
 Lungs effects due to dust. techniques using safety cones and barricades y
structure or  Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all h
Contact with the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority. O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff. C
Water leak /  Acquire current utility drawings. Carry out o

Page 16 of 16