TASK RISK ASSESSMENT SUMMARY

S. No Description of Task steps Remarks


1 Site Preparation (Mobilization / De-mobilization of equipment and materials)

2 Loading and unloading of materials/ equipment using boom truck/ mobile crane or fork lift.

3 Manual Handling

4 Working at height using a Scaffold


RISK ASSESSMENT
Laying/Installation
TITLE OF THE ACTIVITY: of Pipes - Underground and aboveground
Construction of (7) different projects at Al Ain Zoo District - Package -1 RISK RESIDUAL RISK
5 BASELINE
STEP DESCRIPTION OF
RISK ASSESSMENT
Housekeeping
REF No.:HAZARDS
RA -
CONSEQUENCES
Laying/Installation of Pipes
CONTROL MEASURES RESP.
6NO. TASK STEP
ADDITIONAL CONTROL
PARTY REFEREN
007 Underground
S and
P R aboveground
MEASURES / ACTIONS
S P R CES
Safety
Working in
7 ASSESSOR: & Project
hot/humid conditions REVIEWED
ASSESSED DATE: 15/08/2019
Departments DATE:

1 Site •Moving traffic •Personnel harm • Personnel should undergo 3 C M • Effective and Site 1 C L OSHAD
Preparation continuous supervision Engineer/ COP 2.0
•Poor •Asset Damage safety induction.
(Mobilization / to be ensured always. Authorised PPE,
communication; Supervisor
De- • Permit to work should be OSHAD
•Untrained work • Flashing lights shall
mobilization of obtained from appropriate COP 8.0
force be placed suitably to
equipment and authority prior to General
warn drivers during
materials) •Un protected work commencement of task. Work Place
night
force Amen,
• Tool box talk shall be • All personnel will
•Heat stress OSHAD
conducted by respective wear the Mandatory
•Manual Handling Foreman. COP 21.0
PPE (Safety Helmet,
• Scattered materials Permit to
• Workers will not exceed the Safety Glasses,
in the area. work
load limit. Coverall, and safety
systems,
shoes) along with PPE
• Lone Working will be avoided OSHAD
specific to their task.
COP 22.0
• Heavy or awkward loads Barricading
should be moved using a of Hazards,
handling aid. OSHAD
• Area shall be barricaded. COP 30.0
Lone
• Sign boards shall be placed to Working.
warn vehicle drivers.
• All tasks to be carried out by
trained, authorized personnel.
• Ensure good housekeeping.
• Safe access area shall be
S: Severity, P: Probability, R: Risk. provided.
Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable, B-Remote, C-Occasional, D-Probable, E-Frequent • Certified equipment’s and
operators shall be allowed. Page No. 1 of 1
• Banks man shall be positioned
to warn the personnel with