Laying Pipes
Laying Pipes
2 Loading and unloading of materials/ equipment using boom truck/ mobile crane or fork lift.
3 Manual Handling
1 Site •Moving traffic •Personnel harm • Personnel should undergo 3 C M • Effective and Site 1 C L OSHAD
Preparation continuous supervision Engineer/ COP 2.0
•Poor •Asset Damage safety induction.
(Mobilization / to be ensured always. Authorised PPE,
communication; Supervisor
De- • Permit to work should be OSHAD
•Untrained work • Flashing lights shall
mobilization of obtained from appropriate COP 8.0
force be placed suitably to
equipment and authority prior to General
warn drivers during
materials) •Un protected work commencement of task. Work Place
night
force Amen,
• Tool box talk shall be • All personnel will
•Heat stress OSHAD
conducted by respective wear the Mandatory
•Manual Handling Foreman. COP 21.0
PPE (Safety Helmet,
• Scattered materials Permit to
• Workers will not exceed the Safety Glasses,
in the area. work
load limit. Coverall, and safety
systems,
shoes) along with PPE
• Lone Working will be avoided OSHAD
specific to their task.
COP 22.0
• Heavy or awkward loads Barricading
should be moved using a of Hazards,
handling aid. OSHAD
• Area shall be barricaded. COP 30.0
Lone
• Sign boards shall be placed to Working.
warn vehicle drivers.
• All tasks to be carried out by
trained, authorized personnel.
• Ensure good housekeeping.
• Safe access area shall be
S: Severity, P: Probability, R: Risk. provided.
Risk Rating (High, Medium to Low) 1-Negligible , 2-Marginal, 3-Critical,4-Sever, 5- Catastrophic
A-Improbable, B-Remote, C-Occasional, D-Probable, E-Frequent • Certified equipment’s and
operators shall be allowed. Page No. 1 of 1
• Banks man shall be positioned
to warn the personnel with