Contractor PMC Engineer Employer

QUALITY CONTROL CHECKLIST – Skim Coat

PROJECT NAME : Cordoba (Phase 1) At Bloom Living, Zayed City, Abu Dhabi - Main Works Package
CLIENT : Bloom District Properties
CONSULTANT : Dar Al-Handasah Consultant

PROCESS: _______________________________ DATE: _______________


LOCATION OF WORK: __________________________________________________
DRAWING/SPECIFICATION REFERENCES: _________________________________

CHECKED BY ENDORSED BY
ITEM CONTRACTOR CONSULTANT REMARKS
(tick) (tick)
Yes No Yes No
Is the Material Approved. (MIR)?
Is the Surface Preparation acceptable to receive
Antifungal paint?
Is the skim coat applied correctly?
Is there any defect which need to repaint, or
rectification required to apply again skim coat?

Is Safety measures provided?

MAIN CONTRACTOR (P.E. and QA/QC Engr.) CONSULTANT


Name : __________________________________ Name : ____________________________________
Signature: __________________________________ Signature: ____________________________________
Date : __________________________________ Date : ____________________________________

Rev. 0 Issue No. 1 Issue Date: 15-07-09