You are on page 1of 1

Contractor PMC Engineer Employer

QUALITY CONTROL CHECKLIST - Post Fixed Rebar Drill & Fix with Chemical Anchor

PROJECT NAME : Cordoba (Phase 1) At Bloom Living, Zayed City, Abu Dhabi - Main Works Package
CLIENT : Bloom District Properties
CONSULTANT : Dar Al-Handasah Consultant

PROCESS: _______________________________ DATE: _______________


LOCATION OF WORK: __________________________________________________
DRAWING/SPECIFICATION REFERENCES: _________________________________

CHECKED BY ENDORSED BY
ITEM CONTRACTOR CONSULTANT REMARKS
(tick) (tick)
Yes No Yes No
1. Rebar setting out and marking, including
PT strands
2. The hole depth and cleaning using a
brush and air blower. Contractor to
submit for consultant inspection and
approval.
3. Rebar fixing/application of the chemical.
4. Is Safety measures provided?
MAIN CONTRACTOR (P.E. and QA/QC Engr.) CONSULTANT
Name : __________________________________ Name : ____________________________________
Signature: __________________________________ Signature: ____________________________________
Date : __________________________________ Date : ____________________________________

Rev. 0 Issue No. 1 Issue Date: 15-07-09