Employer PMC Engineer Contractor

QUALITY CONTROL CHECKLIST


BACKFILLING

PROJECT NAME : Cordoba (Phase 1) At Bloom Living, Zayed City, Abu Dhabi - Main Works Package
CLIENT : Bloom District Properties
CONSULTANT : Dar Al-Handasah Consultant

PROCESS : _______________________________ DATE: _______________


LOCATION OF WORK: __________________________________________________
DRAWING/SPECIFICATION REFERENCES:_________________________________

CHECKED BY ENDORSED BY
ITEM CONTRACTOR CONSULTANT REMARKS
(tick) (tick)
Yes No Yes No
1. Is the level of excavation checked against
A.M. bench mark?
2. Have all service lines been protected,
checked, tested and signed off?
3. Have warning tapes/tiles been provided
over service lines?
4. Is the source and material to be used in
backfilling approved and meets specification
requirements?
5. Is honey comb/voids/damaged to concrete
rectified?
6. Is checking carried out for substructure
waterproofing, if any?
7. Are trenches free of debris and other
deleterious materials?
8. Is the compaction carried out in layers using
the approved compaction equipment?
9. Has In Situ Density Test carried out as per
specification requirements?
10. Has the final level been checked and as per
drawing?
MAIN CONTRACTOR CONSULTANT

Name : _________________________ Name : ____________________________

Signature : _________________________ Signature : ____________________________

Date : _________________________ Date : ____________________________

Rev.0 Issue No. 1 Issue Date:15-07-


09