RISK ASSESSMENT

TITLE OF THE ACTIVITY: Backfilling Work


RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
Collision  Workers due  Personal injuries due to collision with
 Permit / NOC should be obtained from
with to hit with vehicles appropriate authority prior to commencement of
adjacent moving  Property damage due to contact with task. PTW must be obtained for each area
uipment and materials

structure / separately.
equipment other structure/ Moving vehicles and
vehicles /
persons.  Equipment machines  Proper instructions to be given to the
damage due to responsible persons during the mobilization of
Fall of vehicles and equipment’s.
material and collision.
equipment  Designated areas to be arrange beforehand
 Property due
while with the client/contractors for the special
to hit with arrangements for parking and storing.
loading and
moving  Equipment should have reverse alarm, front
Page 1 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
 Workers due  Personal injury due to collision with Safety induction informing the necessity of using
Collision of to collision, moving vehicles. PPE to be given for all workers. Inspection of
vehicles  Environment  Personal injury while visiting the site  Permits shall be secured in advance from equipment
with other due to leakage due to slip, trip and fall as there the relevant utility / local authority prior to before start the
nd Plate Compactor

adjacent excavation in the vicinity of existing underground work.


or damage already piling work is ongoing and
services. Equipment must have the third party Close
structure or underground excavated and uneven surfaces are inspection certificate and Operator must have the supervision of
objects utilities available there. third party competency certificate. the area.
 Work force  Property damage due to collision of  Arrangement Plan of proper site safety Regular spray
Contact with due to Noise moving vehicles techniques using safety cones and barricades and of water on the
existing and vibration.  Personal ill health /Fatality due to use of proper sign boards to be defined. sand.

Page 2 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
Equipement  Workers due  Personal injury workers moving  A valid permit to be issued.
collision with to hit with around.
leveling

 Area should be barricaded and adequate


for

workers, moving  Property damage signage is to be provided.


Objects and
bobcat

equipment  Property/Equipment damage due to  Certified flagman to be used.


other
moving fire.  Operator / Rigger/Flagman to be certified.
Site

machinery,  Equipment must have the third-party


, Boom loader and

Equipment. certificate
and back filling

Falling  Utilities should be identified and marked.


objects. Staff should be
Equipment

 Activity should be performed under the provided the


Tilting of direct supervision. safety induction
Page 3 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
rtable Hand/ Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
Electricity  Workers due  Cuts, Puncturing due to contact with  Proper inspection/maintenance of tools
contact with sharp personal injury to operator  Replace/repair defective tools
Fire  Use with proper PPE
Rotating moving parts  Personal Injury/ fatality while using  Correct usage as per procedure
parts /Wheel of tools and the tool.  Proper storage of tools
Dust due to electric  Damage to the tool or job-Property  Use only with required protective handles.
Use tool with proper guard only
r, Drill, Hammer

current damage due to fire. 


Flying Regular
 Trained personnel
objects  Work force  Electric Shock/Fatality inspection to be
 Do not use loose cloth while using tools with
noise due to noise,  Hit by fling fragments rotating. carried out for
ower Tools

power tools.
Vibration Vibration and  Tripping and falling  Do not keep any flammable substances nearby
dust.  Inhalation of dust lungs effected. during hot work activity. Fire Extinguisher & fire

Page 4 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
Manual  Worker force  Muscle sprains, and strains due to  Load must be assessed before lifting, and check
Handling due to lifting lifting heavy items the path for tripping/slipping hazard in which the
load would be carried.
the heavy load  Injuries to muscles, ligaments, discs  Assess physical capacity of the persons involved
/ Large in and other structures of the back
l Handling (Manual)

in lifting. Prefer mechanical aid if possible.


quantity and  Abdominal hernias  Manual handling technique need to apply
oversized.  Chronic pain etc.  Grip the load properly. Ensure synchronization
between the load lifters.
 Load must be rested in between in case of
traveling long way.
 Ensure load is not obstructing the vision. Proper
5 3 15  Engage extra person to guide who is not involved 2 2 4 supervision of Y

Page 5 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
Spillage  Environment
Fire due to
Contact with contamination
body  Workers due
rmal paint ,Bitumen

Chemical to inhalation
exposure to or contact of
persons body with
paint.  Use of trained personnel
 Property  Keep away the source of ignition
Contaminate the soil due to leakage  Hot work should not be allowed in that area.
damage due to 

Page 6 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
loader with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
 Workers due  All known services are to be located by hand and
to fall in, recorded.
hoeleveling

 Use cable avoidance tools to locate cables.


Collapse and  Respective permits to be obtained prior to start.
hit with  Width of excavation will be followed depending
moving on soil condition as per approved shop drawings.
Site

equipment.  Ensure adequate clearance from existing


structures
eep with Back

 The sides of all excavations will be battered to


provide a stable slope or supported by a suitable Close
system to prevent cave-in. supervision.
 All deep excavation near roads and access shall
Regular
Page 7 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
area with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
Site leveling

 Banks man and rigger (certified) to guide the


operator.
vel for the excavated

 Load should not be more than the safe working


load and lifting gears.
 Daily inspection of lifting gears.
 Avoid workers entry to the place.
 Only engage licensed, certified, competent and
experienced operators.
 Warning signs should be displayed like “Do Not
Fall of
Enter”, “Over Head Hazard”. Close

Page 8 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
 Fire  Workers due  Personal injury  Hot work PTW should be issued before start of Tool Box Talks
 Explosi to exposure  Burn work. (TBT) will be
on with fire /heat  Property damage carried out to
 TBT should be conducted by competent person
 Gas  Workers due  Vomiting, all workers
and Risk assessment should be communicated explaining the
leakage to inhalation of  Skin rashes, before work start. specific activity
 Exposur gas  Fatigue
 Check the condition of hose and check for gas on site with its
e with  Stress & Delirium hazards and
leakage.
tempera  Fatality associated risk
ture  Make sure safe transportation of gas cylinders including
 Falling used for water proofing. Regulator should be in emergency
good condition, Gage pressure should be fixed
Page 9 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
    Safety footwear to be worn and care taken
to prevent slips and trips
 Keep the cylinders always in vertical
condition.
 Work area to be clear of any obstructions
which will might cause interruptions to
operation
 Clear work area from combustible materials
 Safety goggle, Face shield mask with

Page 10 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
hot with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
 Workers due  Management will provide anti-dehydration
to extreme powder for all workers during hot climate.
Site leveling

 Heat stress to the workers  Abu Dhabi summer working time will be followed
hot weather working direct to sun light (June 15 – Sept 15). Close
or due to  Headache to work force  Consultation with employees about health supervision of
Working in extreme

long work condition and adequate welfare facility will be the area.
temperature

Excessiv  Dizziness due to increase of body


without any provided at the work location. (Rest area, Proper rest
e heat core temperature Drinking water station, Toilets, First aid facility
control break
and  Vomiting, 3 5 15 and emergency arrangements. 2 2 4 Y
measure  Job rotation will be implemented. Rest area with
temperat  Skin rashes, proper
during  Heat stroke  Trained first aider available. (As per OSHAD-SF
ure Cop 9.0 Workplace Wellness) ventilation and
summer
Page 11 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment

Page 12 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment

Personal protective equipment

Page 13 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
 Safety Helmet, Safety Shoes, Ear plugs, Face shield/Visor, Appropriate Gloves & Safety Goggles ,safety vest
Information, instruction and training

 All personnel in the team are to be made aware of the safe systems of work.
 Supervisors should ensure that all lifting gear used are in good condition and safe for use.

 Workers and supervisors should be trained in the use of power tools and machinery to ensure that equipment is maintained in good condition prior to and during use.
 Ensure that good house keeping standard is maintained through out.

Page 14 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
Emergency procedures
 Site emergency procedures should make provision for the rescue of individuals from injuries.

 First-aid facilities should be available to cope with any significant injuries that may arise from the work.
Monitoring and review

Page 15 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
 Work should be monitored by Foreman and charge hand who are trained to ensure that any additional precautions or equipment required are provided.

First Aider contact number : Mr Mukhar : 055-4597615

Page 16 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment

RISK MATRIX Risk Rating (RR) – Severity x Likelihood

Page 17 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
LIKELIHOOD
Likely
Rare Unlikely Possible Almost certain
Could happen often (on
Remote possibility (once Could happen but rare Could happen occasionally Could happen frequently (once
L average once a month or
every 3 years or more) (typically once in a year) (on average quarterly) a week or more)
SEVERITY more)
1 2 3 5
(IMPACT) S 4

Low Low Low Low Medium


Insignificant 1
1 2 3 4 5
Low Low Medium Medium Medium
Minor 2
2 4 6 8 10
Low Medium Medium Medium High
Moderate 3
3 6 9 12 15
Low Medium Medium High High
Significant 4
4 8 12 16 20

Page 18 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
Medium Medium High High High
Major 5
5 10 15 20 25
RISK BASED CONTROL PLAN
RISK LEVEL ACTION AND TIMESCALE
Quick, easy controls should be implemented immediately and further action planned for when resources permit. Monitoring required
1-4
ensuring controls are maintained. Manage through routine procedures. Go for economic improvements where possible. Incident report
Low
must be completed.
Aim to reduce risks but costs of prevention may be limited. Undertake a risk assessment of the situation / task and implement the
appropriate actions. Actions should have a timescale and should be monitored. Where the risk involves work in progress undertake a
5-12 risk assessment as soon as possible to ensure the safety of the situation or task. Work should not start until the risk is reduced to
Medium an acceptable level. Considerable resources may have to be allocated. Contact your Manager and Risk Manager by telephone about
the actions that should be taken to reduce the risk/s. incident report must be completed. Incident must be added to service risk
register.

Page 19 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment
Do not commence the activity until a risk assessment has been completed to ensure the safety of the situation or task. If it is not
15-25 possible to reduce or eliminate the risk even with unlimited resources, work must remain prohibited. Inform your relevant Director,
High your Manager and the Risk Manager immediately by telephone. Incident report must be completed. Incident must be added to service
risk register.

Prepared by: Emirates Link Maltauro


Prepared by : Project HSE Eng Approved by : PM
Name : Najam ul Hassan Abbasi Name : Ahmed Zeiter
Sign : Sign :

Page 20 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L

Over  Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of  Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated  Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
 Property damage due to collision of moving vehicles m
underground services.
vehicles with  Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor

other adjacent  Arrangement Plan of proper site safety l


 Lungs effects due to dust. techniques using safety cones and barricades
structure or y
 Hear loss due to sounds generated by plate compactor. and use of proper sign boards to be defined.
objects due  Hands arms tingling and joints pain for workers those are w
 Only trained and experience labor to be
unsafe drive/ engaged. i
using the plate compactor.
Operation. t
 Site Supervisors to communicate with all
Contact with h
the trained personnel’s in the site for the smooth
existing work flow by keeping safety on top priority.
O
services /  TBT to be provided regarding work S
utilities procedure, equipment’s to be used and hazard H
during site involved in the work before start of work. A
 Emergency contact numbers of ERT and D
grading and
3 4 12 service provider to be available on site. 2 2 4 Y
clearance. S
 Importance about the usages of PPE’s &
Gas leak / gas Right tools for the right job should be explained
F
explosion. to the staff.
C
Water leak /  Acquire current utility drawings. Carry out o
flooding survey to confirm depth and line of existing P
Sewage leak utilities (utilize suitable survey equipment

Page 21 of 21