Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
structure / separately.
equipment other structure/ Moving vehicles and
vehicles /
persons. Equipment machines Proper instructions to be given to the
damage due to responsible persons during the mobilization of
Fall of vehicles and equipment’s.
material and collision.
equipment Designated areas to be arrange beforehand
Property due
while with the client/contractors for the special
to hit with arrangements for parking and storing.
loading and
moving Equipment should have reverse alarm, front
Page 1 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Page 2 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
with the help of JCB and Plate Compactor
Equipment. certificate
and back filling
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
rtable Hand/ Site leveling with the help of JCB and Plate Compactor
power tools.
Vibration Vibration and Tripping and falling Do not keep any flammable substances nearby
dust. Inhalation of dust lungs effected. during hot work activity. Fire Extinguisher & fire
Page 4 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Page 5 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Chemical to inhalation
exposure to or contact of
persons body with
paint. Use of trained personnel
Property Keep away the source of ignition
Contaminate the soil due to leakage Hot work should not be allowed in that area.
damage due to
Page 6 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
loader with the help of JCB and Plate Compactor
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
area with the help of JCB and Plate Compactor
Page 8 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Page 10 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
hot with the help of JCB and Plate Compactor
Heat stress to the workers Abu Dhabi summer working time will be followed
hot weather working direct to sun light (June 15 – Sept 15). Close
or due to Headache to work force Consultation with employees about health supervision of
Working in extreme
long work condition and adequate welfare facility will be the area.
temperature
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Page 12 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Page 13 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
All personnel in the team are to be made aware of the safe systems of work.
Supervisors should ensure that all lifting gear used are in good condition and safe for use.
Workers and supervisors should be trained in the use of power tools and machinery to ensure that equipment is maintained in good condition prior to and during use.
Ensure that good house keeping standard is maintained through out.
Page 14 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
First-aid facilities should be available to cope with any significant injuries that may arise from the work.
Monitoring and review
Page 15 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Page 16 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Page 17 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Page 18 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Page 19 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor
Page 20 of 21
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Backfilling Work
RISK ASSESSMENT REF No.: RA -02 Risk assessors team: PM,CM,PE, HSE Crew and General Foreman
Ahmed Zeiter, Ahmed Ghani, Hany, Najam and Ram sing
ASSESSOR: Safety & Project Departments ASSESSED DATE: 30/03/2023 REVIEWED DATE: 30/03/2023
Additional
Risk Residual Improveme Accept
Implemented control measures
evaluation risk nts in Y/N?
Who may be harmed and controls
Activity Hazard
how Consequences/Impact
RL RL
L S H/ L S H/
M/
M/L L
Over Personal injury due to collision with moving vehicles. Safety induction informing the necessity of using
speeding of Personal injury while visiting the site due to slip, trip and PPE to be given for all workers.
vehicles at fall as there already piling work is ongoing and excavated Permits shall be secured in advance from C
site. and uneven surfaces are available there. the relevant utility / local authority prior to o
Collision of excavation in the vicinity of existing
Property damage due to collision of moving vehicles m
underground services.
vehicles with Personal ill health /Fatality due to Gas leak. p
Site leveling with the help of JCB and Plate Compactor