Project Location : New NHT/CCR, NSU, MS blending unit & fabrication JSA No.: 07
yard
P&M and Equipment, Radiography Camera , Collimeter, Rediation Survey Rev. No.: 00
Tools & tackles involved Meter, Pocket Dosimeter & Alarm Lamp.
Job Description: Radiography WORK . Prepared By: Mr. Aadarsh kumar
(Contractor Site
Eng. /Sup)
Sequence of Operation – Activity Tools &tackles Hazards Safety measures / precautions
Sl.
Job Classification: Mechanical Risk Reviewed By: Risk level
Mr. Saket KumarResponsibility
Steps used & involved at
No. level after
manpower various Action by
H/M/L (Contractor control
deployed steps
HSEM)
1.1.1 Maintain proper housekeeping
Name of the Site at work location.
Approved By: Mr. Bijoy Kumar
Mr. Dhananjay Kumar/ Mr. Subrata Manna 1.1.2 Don’t keep unwanted material
Engineer/ RSO :
1. L at site. (Contractor L Site Engineer
1.Slip& Trip
Area clearance Hand tools
hazard
RCM/Site
1.1.3 Inspection of work site to be
done before start the job.
Manager)
PPE / safety device Status. Issued for
Safety helmet, Safety shoe, Safety goggle, hand gloves,
required implementation/ review
Boiler suit, TLD Badge etc.

1. Cut injury 2.1.1Keep Hands away from


2. due to sharp M cutting edges. L Site Engineer
Film loading in dark room Hand tools
edge. 2.1.2 Ensure hand protection.

1. Burn 3.1.1Wear hand gloves


injury due to 3.1.2 Ensure hands are away from
3. H L Site Engineer
Film setting on object Hand tools. hot surface. hot surface.

Page 1 of 4
4.1.1 Job to be carried out as per the
Procedure.
4.1.2 Wear TLD badge/Dosimeter
1.Exposure
without fail while handling radiation
to harmful
sources.
radiations
4. Gamma ray source setting Radiography H 4.1.3 Send TLD badges to BARC L RSO
from
camera, hand (Bhabha Atomic Research Centre)
Gamma ray
tools every month to check how much
source
dose the personnel have exposed in
order to find out whether it is within
maximum permissible dose.
5.1.1Ensure proper isolation and
barrication-Operations to ensure
1. Exposure before issuing permit.
to harmful 5.2.2 Prevent persons other than
radiations radiography technician, to enter
5. H L RSO
Gamma ray source activation Radiography from barricaded area while radiography is
camera, hand Gamma ray being carried out.
tools source 5.2.3 Carry CV tongs and lead pot
to the area where radiography is
being done.
6.1.1 Ensuring proper isolation and
barrication.-Operations to ensure
1. Exposure before issuing permit.
to harmful 6.1.2 Prevent persons other than
Radiography radiations radiography technician, to enter
6. H L RSO
Gamma ray source deactivation camera, hand from barricaded area while radiography is
tools Gamma ray being carried out.
source 6.1.3 Carry CV tongs and lead pot
to the area where radiography is
being done
7.1.1Ensure proper lifting methods
F-15, hand 1. Injury due 7.1.2 Use good quality ropes and
7. H L Site Engineer
Shifting of Gamma ray camera tools to heavy lift chain-pulley blocks for lifting of
source to height
8.1.1 Use safety belt/full body
1.Injury due
harness.
8. to fall from H L Site Engineer
Working on temporary platforms Hand tools 8.1.2 Ensure that scaffolding is safe
height
like scaffolds to use.
6. 1. 6.1.1Ensure plenty of cold L RSO
Unavailabili drinking water is available at site

Page 2 of 4
ty of 6.2.1 Ensure adequate rest shelter
drinking is available for workmen to take
water rest.
Heat Stress Management 2. Lack of
or
inadequate
rest shed
1. 7.1.1 Housekeeping shall be
Tripping maintained after completion of work
/slipping for the day.
Housekeeping & close Hand tools hazard due 7.1.2 Ensure proper illumination on
7. of work for the day to poor M walkway. L RSO
illumination
& poor
housekeepin
g
1. Extreme 8.1.1Effective TBT shall include
weather about weather condition.
condition 8.2.1Emergency Response at
2. Leakage workplace.
8. H L RSO
Emergency Response of toxic or 8.2.2 Ensure emergency vehicle
flammable arrangement at workplace.
gases. 8.2.3 Ensure availability of First aid
box at workplace.

General precaution for Demolition:

1) Instruction should be given for “NO SMOKING” and ensure that no fire/ hot work occurs nearby.
2) Tools & nails are to be kept in a toolbox never carry the nails in bags or in pockets.
3) Materials shall be kept in arrange way on the ground. The foreman shall ensure good housekeeping.
4) Tie the lifeline while making beam bottom at the outer side.
5) Support the lifeline at every 5 m length.
6) Helpers should not be allowed to work at outer side.
7) Ensure access wherever you work.

Page 3 of 4
8) Check for defective tools.
9) The included angle for the ladder is 75 degree and the ladder should extend at least 1 m beyond the landing platform.
10) The ladder must be secured at the top and bottom. Do not use top rung or top step of the ladder.
11) Never use brittle materials like brick as a packing material for shutter supporting towers.
12) Do barricading/Identified/highlight while doing breaking work at outer side.
13) While demolition keep one helper to remove the nails and stack the shutters properly (neatly) and ensure proper access.
14) 1/3 of portion of the tower only can be projected beyond periphery of the slab as cantilever.
15) In such cases the Wallers to be secured by hooks embedded in concrete.
16) Props used at periphery must be braced adequately.
17) Required job permit shall be obtained from concern authority.