PTA-HSE-JSA-06
1
2.Setting Crane for the Hand Injury to the rigger. Keep hands out of pinch point while rigging, Use hand
test blocks and Failure of slings or D-shackles. gloves.
equipment to be lifted Know the weight to be lifted and its configuration, Check
Weather condition, Wind speed (low, high) Supervisor/ Engineer
Emphasis more to STOP WORK if they see anything unsafe.
3.Lifting the test blocks Lifted material falling. Barricade the area of Crane operation place warning.
and test equipment Hitting people or existing Check rigging before lifting.
facility. Ensure lifted load is properly balanced.
Crane losing balance. Stop lifting if wind is getting strong and poor visibility.
Refer to load chart and radius of operation. Supervisor/ Engineer
Assign one man to give signal to crane operator.
Use tagline to control suspended load.
Use safety glasses, gloves. Keep other people clear
of immediate area.
4.Unloading the test Rolling/tilting of material. Assign one man to signal and this man controls movement of
blocks and test Damaging other existing Crane -Know the weight to be lifted.
equipment facility. Ensure to place Wooden packing between load
Hand injury to rigger. Use proper slinging method to carry Site office at work
Injury to personnel by falling of location
material. Position body out of line of loading and unloading.
Keep hands well away from (Load) site office ends.
Know the weight to be lifted.
Supervisor/ Engineer
Use tagline to control suspended load.
Position yourself to safer position for emergency exit at
workplace.
Ensure the site is thoroughly inspected for possible
obstruction in route and location of unloading.
Ensure their enough clearance for Crane movement back and
forth.
Use proper slinging method to (Load) Site office at work
location.
2
5. Hydraulic press Strike by hoses, disconnected Appropriate permit shall be obtained. Supervisor/ Engineer
testing parts Test equipment and all components must be calibrated and
Crushing and Pinching certified.
Cutting, Stabbing and Inspection and ensure proper connections before starting the
Puncturing work.
Improper connection of hose Secure the hoses with whip checks/safety pin/safety devices
and accessories, Hose rupture, Use only rated capacity hoses for the job.
Uncalibrated pressure Ensure that only technical trained and competent personnel to
gages/test manifold, test arrange/fix the pressure test equipment and instruments.
equipment Ensure fittings and joints are appropriate for the
Defective pressure gauge. pressurization of line.
High pressure in Unit, Over Follow the approved method statements.
pressurizing, Use calibrated pressure gauges
Mechanical failure, Use pressure gauges on its intended purpose only.
Monitor the pressure gauge from a safe distance away from
the potential source of high-pressure connection points,
Coupling etc.)
Never increase the pressure more than the maximum
allowable pressure for the weakest portion in the segment or
pressure rating of the hose & coupling.
Do not leave the pressurized hose or pump or air compressor
unattended when the test is going on.
Isolate the equipment from all source of energy when not in
use.
Depressurized system before disconnecting hoses and
removal of any fittings.
Use rated manifolds with test pressure certificates
Keep warning signs and testing area Barricaded.
Never attend to rectify or do maintenance by tightening the
nut and bolts while line is pressurized.
Nearby existing live services shall be isolated / protected.
Engaged trained personnel 24/7 to monitor the all lines during
the hydro test.
Area shall be fully barricaded and hazard signs shall be in
place.
Pressure shall be released according to method statement.
Provide watch protecting unauthorized person from entering 3
the restricted area for testing.
NEW PTA COMPLEX
PTA-HSE-JSA-006
4
ATTENDANCE SHEET
NAME COMPANY POSITION ID NO. SIGNATURE