JOB SAFETY ANALYSIS Date: 05.02.2019.

Company: Douse Fire Systems Pvt. Ltd.


Project: Barclays Pune LTS Commerzone-2, Kharadi.
th th
Locaton: P3, 2nd, 3rd, 4 & 5 floor.
The type of work, nature of work: Firefighting pipe, sprinkler assembly and Pre-Action System.

The tools and equipment used: Welding Machine, Threading Machine, Drilling Machine, Cutting Machine, Grinding Machine, Spanners, Lifting
attachment, Mobile Scafolding ,pneumatc testng ,

The training and skill required for the job: Safety induction training and JSA Briefng before starting the activity, Banks man Material handling training.

Personal Protectve Equipment Required: (As required PPE) safety shoes, Safety Helmet, reflective Jacket, Cut resistant gloves / leather gloves,
Face shield, Apron / Boiler Suit, ear plug, Nose Mask & Shoulder Pad.

Prepared By: Sachin Jagdale. (Safety Manager).


Reviewed Approved BY:

1 of 4
Sequence of Steps Potential Hazards Recommended Safe Procedure Responsibility
Risk (s)Involved
1. Mobilization and Use of  Contact with pedestrian / . Site supervisor
telehandler and Trailer Workers. 1. Trainings of all involved & records must be submitted to /Engineer
 Contact with other construction EHS Dept.
vehicles. 2. Segregate the vehicle and pedestrian access and appoint
 Contact with structures / flagman at intersection crossings with whistles.
Foundation bolts. 3. Barricade the structural material and foundation bolts.
 Approach access up to the point 4. All loads to be carried on the Vehicle must be held
of operation. securely and supported or in a stable manner, not likely to
 Operative errors. lead to dropping of the lead.
 Unskilled worker 5. Any induced works shall be allow
 Medical unfit worker
6. Medical and vertigo test shall

2. Shifting of fabrication pipe to  Hit to member/nearby object 1. Unauthorized entry should be restricted near to the work Site supervisor
module area from fabrication yard  Falling of material from hand area. /Engineer
 Ergonomics hazards 2. All work area and path ways should be free from
Obstruction.
3. All workers must be trained in manual material handling.
4. Provide suficient manpower to carry the material.
5. Use required PPEs like Cut resistant hand gloves.

3. Stacking of sprinkler pipe near  Slip and Fall 1. Ensure batten should place on even ground. Site supervisor
module assembly area on the  Caught in between 2. Ensure use of proper PPE ( Cut resistant hand gloves) /Engineer
planks. 3. Ensure use of proper stopper to prevent the role of pipe.

 Fall or slip. 1. Ensure use of cut resistant hand gloves. Site supervisor
4. Installation of frefghting pipes at  Personal /hand injury. 2. Ensure sufficient manpower engaged for the task. Ensure /Engineer
ground level(Assembly with hold the pipe until pipe tied with module structure.
structural steel modules) 3. Ensure no loose material keep on the module structure
(use of tools pouches)
5. Hang the chain by proper bolting  Slip /Fall the chain /bolt 1. Ensure all loose bolts should kept on the tools pouches. Site supervisor
system. 2. Ensure all bolts should be proper tie. /Engineer
3. Ensure good housekeeping (clean bolts, nut and washer
fall on ground (If any) after completion of work.
6. Hydro test of fre hydrant and  Uses of damage scaffolding. 1. Ensure the proper design scafolding we are Site supervisor
sprinkler headers  Unsafe working platform. providing for working of height, even those /Engineer
 Exceeding maximum we given full body harness for fall of person.
allowable pressure. 2. Ensure the working platform should be
 Injury to workers. proper established and safe zone will be
 Damage to equipment/system. provided on the platform.
 Un-attended equipment/system. 3. Ensure the pressure relieving device is set
 Changing the duration of at maximum allowable pressure for
the hydro-test. weakest portion of the segment to be hydro
 Unsafe depressurization tested.
4. Keep away from the pressurized segment of
of hydro-test fluid.
the system Being hydro-tested.
5. Monitor the pressure gauge from a safe
distance away from the potential source of
high pressure jeting (such as flange joint,
spade and coupling).
6. Do not leave the pressurized hose or pump
unattended
When the hydro-test is going on.
7. Isolate the equipment from all source of
energy when not
In use.
6. Do not change (exceed/decrease) the
duration of hydro- test without permission
from the inspection engineer.
7. Pneumatc test Pre Acton  Uses of damage HOSE 1. Ensure the proper cylinder HOSE pipe Site supervisor
pipe will be a good condition /Engineer
system Installaton
 Unsafe depressurization 2. Ensure the pressure relieving device is
of pneumatic –test set maximum allowable pressure.

 Damage to equipment / 3. Isolated the equipment from all source


system of energy when not in use

 Uses of damage 4. Ensure the proper design scafolding we


scafolding are providing for working of height,
even those we given full body harness
 Change the duration of for fall of person.
the pneumatic test
5. Do not change (exceed/decrease) the
 Poor illumination duration of pneumatic - test without
permission from the inspection
 Unskilled workers engineer.

 Intended cylinder 6 .keep away from the potential source of


high pressure ( such as flange joint spade and
 Pressure leakage coupling

7. only tested cylinder shall be used and


submit the test certificate

8. whip lashes should be fix on the cylinder


with pipe

9. only skilled worker should be allow

10. Barricade this area

11. Display the sign Board

12 .obtain the work permit

13. job specific training required .

8. Working at nights  Slip, trip & fall of material. 1. Erection work is not allowed for night shift. Site supervisor
 Personal injury. /Engineer
2. Maximum avoids working in the nights.
Property damage.
3. Only work is done when proper illumination is
provided
(Min 250 LUX).
4. Obtain night work permit is a mandatory.
9. Storage of material.  Cause damage to the 1. Keep all the tools & materials in a proper Site supervisor
tools, missing, and delay store in orderly placed. /Engineer
of work.
2. Any damaged tools found, replace for new
 Personal injury / Property
one.
damage. Slip, trip & fall
10. Completion of work &  from
Hit heights.
and slip hazards & Site supervisor
1. Ensure that operator keeps all the devices
other devices. cause property damage. closed when it is not operated. /Engineer
 Personal injury.
2. Housekeeping in working area should be neat
Property damage.
and clean.