JOB TITLE / AIM: JSA for Magnetic particle inspection (MPI)

JSA DATE :24 /1/07 JSA NO./ REVISION: 00


SUPERVISOR/ JSA LEADER: SCRIBE: Abdullah Khan
PARTICIPANTS:
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps: List the main sequential steps. Each step should accomplish a specific component of the task.

1- cleaning of weld joint with Power brush


2-Applying white contrast paint (MSDS)
3-Placing of hand yock
4-Spraying (Metallic Spray ) in b/w legs of hand yoke.
5-Demobilization

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE, S: First aid kit must be present at the area and the HSE personnel is the first response in case of
emergency, Ambulance to be positioned near work area at all times

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Proper cleaning of weld joint (Power Pinch point Ensure to wear proper PPE while cleaning the weld
brush) joint with power brush.
Hand Injury Ensure that all the protruding welds / Sharp edges
shall be removed and wear proper PPE specially
gloves.
2 Applying white contrast paint Improper inhalation while working in close Ensure that while applying contrast paint don’t stay
(MSDS) area. opposite direction of wind flow.
Ensure to wear mask while applying contrast paint.
Skin Irritation Ensure that clean water is placed near by. Incase of
contact with skin wash off with water.
Eye irritation Incase of contact with eyes rinse thoroughly with
plenty of water and seek medical advice.
Fire Ensure that fire extinguisher shall be placed at the
time of activity.
Working with out permit Operations NFHWP shall be obtained from BHPB

3 Placing of hand yoke Un approved equipment Ensure that E & P checked and tagged the
equipment prior to mobilization
Electric shock Ensure that the equipment is calibrated and
certificate is attached.
Joint in cable Ensure that there shall be no joint present in the
Supply Cable.
4 Spraying (Metallic Spray ) in b/w Improper ventilation If ventilation is insufficient wear respiratory
legs of hand yock. protection equipment.
Ensure that first aid kit shall be available at work
front.
Hand protection Ensure to wear Solvent resistant gloves.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Improper handling storage Do not discharge into the sub soil/ soil

Don’t discharge into the drains/ surface


waters/ground water.
Fire Keep away from sources of ignition
5 Demobilization Improper house keeping Proper house keeping shall be done prior to
demobilization.