1 Check all materials installed are as per approved material submittal. 2 Check all the outlets of nozzle area expect the remote end of deluge system 3 Check for outlet valve of foam tank in OPEN position 4 Check for pressure actuatingg valve to the foam tank 5 Check for the activation and operation of deluge valve by opening manual release valve
6 Check for the release of foam through the remote end point 7 Check for the interface and activation signal in FACP
Remarks (if any):
Sub-Contractor Representative Main Contractor Representative Consultant/Client Representative