1 Check all materials installed are as per approved material submittal. 2 Check the drawings used for installation are current and approved. 3 Check for all electric cabling and termination 4 Check for the location of Fire pump controller 5 Check for the power supply 6 Check for the allignment of jockey pump 7 Check for the rotation of Jockey pumo 8 Check the setting of cut -in and cut -off pressure
Remarks (if any):
Sub-Contractor Representative Main Contractor Representative Consultant/Client Representative