SIDDHIRGANJ 335MW CCPP PROJECT

INSPECTION AND TEST REPORT

Conduit Installation
Inspection Date/Time Document No.
Work ITP No.
Location Drawing No.

Result Remark
No. Check Items
Acc. Rej. N/A

1 Check conduit support and coupling installation

2 Check alignment and fixing of conduit

Check that equipment has been installed


3
free from harm

4 Check identification of conduit

5 Check bonding jumper of conduit

6 Check touch up condition after installation

Comment

Name(Signature) / Date
Samsung Samsung
Sub-contractor EGCB/OE
Construction QA/QC