The document is a checklist for inspecting a UPS installation at Southco - Ranjangaon. It lists 15 items to check including verifying specifications, checking for physical damage, panel installation, cable entry, instruments, batteries, meters, remote panels, mountings, earthing, and exhaust fans. The checklist notes any observations and confirms the works have been completed and are ready for inspection, with signatures from the vendor, consultant, and CBRE.

Uploaded by

sachin wake
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
725 views1 page

UPS Checklist

The document is a checklist for inspecting a UPS installation at Southco - Ranjangaon. It lists 15 items to check including verifying specifications, checking for physical damage, panel installation, cable entry, instruments, batteries, meters, remote panels, mountings, earthing, and exhaust fans. The checklist notes any observations and confirms the works have been completed and are ready for inspection, with signatures from the vendor, consultant, and CBRE.

Uploaded by

sachin wake
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

UPS Checklist

Southco - Ranjangaon
Client : Inspection Report No
Consultant : Date
Package : Electrical Inspection Request No
Vendor : Date
Description of Work :
Wing : Dwg.Ref.No Rev : Inspection Request
Floor : Details : Inspected by By Time
Location
Sl.
Description Yes No Remarks
No
1 Check the specifications of UPS as per the approval
2 Ensure that the equipment is lowered down slung by lifting hooks
only
3 Check for the physical damages if any during transit
4
Ensure that while shifting the equipment it is inched only on rollers

5 Panel installation as per drawing, line & level, alignment of panel,


clearance between wall/partition
6
Check the cable entry provision for incoming and outgoing

7 check the instrument relays


8 Check the indications and meters
9 Check the batteries & specifications
10 Check the meters ( Volt, Amps, Frequency,KWH,Phase indicator,
running Hrs , Battery charger etc )
11 check the UPS remote panel
12 check the remote panel breakers
13 Check the mountings of UPS
14 Check the earthing
15 Check the exhaust fan condition

Observations if any :

The above works have been completed and checked and are ready for inspection
Vendor : Consultant : CBRE :