You are on page 1of 1
SUBSTATION OPERATION FLOW CHART (2MVA) |] seven [Make sure 1, 118FA10 LT Panel Breaker is in open condition [EWERGENY CONTACT: ] _[2. 1IBBA1L HT pane main breaker is in open condition Is, L1BATI0 TR OLTC is set on step-03 [Name : Md. Sagor Hossain 4. LIRMULO panel ( unit-O1,uni-02,uni-02,unit-04) eanh | station: commisoing ‘switch isin open condition. ngineer (i 5. L1RMULO panel ( unit-01,unit-02,uni-03,unit-04) LBS is in (Contact: #0801770872967 eon anon ‘Naom :Jannatun Nagem 6. REB line is alive and voltage is 11kV on 11BAT panel, Designation: Engineer (BMS) (Contact: #8601723405758 [RMU MAINTENANCE INSTRUCTION : uni.o2. Unit. unito4 Grose the 2188420 HT panel cea breaker 1) Keep the LBS n open postion, Il) Keep te earth site n cose positon I) Conduct the necessary maintenance union: 1) Keep the L8S in open postion i) Tum of the 118610 pane! breaker. no Ai) Keep the earth switch in cose poston < ‘Witt mins to stabilize the system 1W) Conduct the necessary maintenance ‘cAUTION {L "D0 NOT CLOSE THE EARTH SWITCH OF [BREAKER IN CLOSE POSITION" ‘ait 10 mins to stablize the ‘stem mediate ‘ross the "PUSH OFF” of aaai0 panel 2, "DO NOT CLOSE THE BREAKER OF 1188410 (WHEN 1ARUMIO UNIT-O1 EARTH SWITCH ISIN (CLOSE POSITION, ‘Close the LAS of RMUIO Unit or ‘wa 10 mins to stablize the ‘sytem Tames ‘urn of the LBS of 'HRMULO ‘Unio Wilt mins to stabilize he system Ca Cot otc une Wai 20 mins o stabilize the ‘stem media Tum off the LBS of <—| wats mins to sabize the system Close the L188A11 HT panel cca breaker ‘aie 10 mins to stablize the ‘stom immediately ‘um of the LBS of SHRMULO Unit | Ware 5 mins to saiize te system (Close the S1BFALOLT pane! incoming cincut breaker ist mine o stabilize the system (Check the out pu votage on the vot meter {2BFALO LT panelis ready fox power supply.

You might also like