SUBSTATION OPERATION FLOW CHART (2MVA)
|] seven
[Make sure
1, 118FA10 LT Panel Breaker is in open condition
[EWERGENY CONTACT: ] _[2. 1IBBA1L HT pane main breaker is in open condition
Is, L1BATI0 TR OLTC is set on step-03
[Name : Md. Sagor Hossain 4. LIRMULO panel ( unit-O1,uni-02,uni-02,unit-04) eanh |
station: commisoing ‘switch isin open condition.
ngineer (i 5. L1RMULO panel ( unit-01,unit-02,uni-03,unit-04) LBS is in
(Contact: #0801770872967 eon anon
‘Naom :Jannatun Nagem 6. REB line is alive and voltage is 11kV on 11BAT panel,
Designation: Engineer (BMS)
(Contact: #8601723405758
[RMU MAINTENANCE INSTRUCTION :
uni.o2. Unit. unito4
Grose the 2188420 HT panel cea
breaker
1) Keep the LBS n open postion,
Il) Keep te earth site n cose positon
I) Conduct the necessary maintenance
union:
1) Keep the L8S in open postion
i) Tum of the 118610 pane! breaker.
no Ai) Keep the earth switch in cose poston
< ‘Witt mins to stabilize the system 1W) Conduct the necessary maintenance
‘cAUTION
{L "D0 NOT CLOSE THE EARTH SWITCH OF
[BREAKER IN CLOSE POSITION"
‘ait 10 mins to stablize the
‘stem
mediate
‘ross the "PUSH
OFF” of aaai0
panel
2, "DO NOT CLOSE THE BREAKER OF 1188410
(WHEN 1ARUMIO UNIT-O1 EARTH SWITCH ISIN
(CLOSE POSITION,
‘Close the LAS of RMUIO Unit or
‘wa 10 mins to stablize the
‘sytem
Tames
‘urn of the LBS of
'HRMULO
‘Unio
Wilt mins to stabilize he system
Ca Cot otc une
Wai 20 mins o stabilize the
‘stem
media
Tum off the LBS of
<—| wats mins to sabize the system
Close the L188A11 HT panel cca
breaker
‘aie 10 mins to stablize the
‘stom
immediately
‘um of the LBS of
SHRMULO Unit
| Ware 5 mins to saiize te system
(Close the S1BFALOLT pane!
incoming cincut breaker
ist mine o stabilize the system
(Check the out pu votage on the vot meter
{2BFALO LT panelis ready fox power supply.