SIDDHIRGANJ 335MW CCPP PROJECT

INSPECTION AND TEST REPORT

Fiber Optic Cable Installation


Inspection Date/Time Document No.
Work ITP No.
Location Drawing No.

Result Remark
No. Check Items
Acc. Rej. N/A
1 Check cable route in accordance with schedule

2 Check physical damages of cables

3 Check dressing and fastening condition

4 Check bending radius

5 Check adequate support installation for cables


Check using good quality connectors according to
7
requirement
Check proper splicing cable with pigtails inside Terminal
8
box
9 Continuity of F.O cable by Light Source
Loss calculation using light source and Power Meter
10
(LSPM)
Comment

Name(Signature) / Date
Samsung Samsung
Sub-contractor EGCB/OE
Construction QA/QC