SAUDI ARAMCO PRE-COMMISSIONING FORM


LOW VOLTAGE CABLES
Equipment Type:
Equipment Tag No:
BI/JO No:
Ref. Drawings & Documents:
Manufacturer:
Model No:
Test Completion Date:

User Reference:
Equipment Description:
Plant No. / Location:
Serial No:

Field Installation Tests


Visual and Mechanical Inspection
Yes

No

Yes

No

1. Inspect cables for physical damage and proper connection in accordance with
single line diagram.
2. Cable connections shall be torque tested to manufacturer's recommended
values or values recommended in P-000.
3. Verify proper terminals and crimping die are used on cable and that crimping
procedure is proper.
4. Verify cable color coding or phasing.
Electrical Tests
1. Perform Megger Test on each cable with respect to ground and adjacent
cables. For cables 250 volt and less use 500 volt megger; for cables above 250
volt to 600 volt use 1000 volt megger; for cables above 600 volts and less than
1200 volts use 2500 volt megger.
2. Perform continuity test to insure proper cable connection.

Witness
Signature & Date

PDD

Inspection

Operation/Maintenance

CopyrightSaudi Aramco 2009. All rights reserved.

Contractor

Form No. P- 040 Issue Date: March 2006

Sheet 2 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


LOW VOLTAGE CABLES
Equipment Type:
Equipment Tag No:
BI/JO No:
Ref. Drawings & Documents:
Manufacturer:
Model No:
Test Completion Date:

User Reference:
Equipment Description:
Plant No. / Location:
Serial No:

Field Test Data


Cable
Identity

Cable
Size

Cable
Type

Cable
Voltage
Rating

CONNECTION

Megger Results in Megohms

A-B, to C & GRD


B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD
A-B, to C & GRD
B-A, to C & GRD
C-A, to B & GRD

Witness
Signature & Date

PDD

Inspection

Operation/Maintenance