Project No Project Title Facilities INFORMATION Tag No. System/ Sub System No. Cable Core/ Size Cable From Cable To Ref. Drawing Nos. Voltage INSPECTION / TEST OK N/A P/L NO 1 Documents required: a) Cable layout drawing b) Cable schedule and drum list 2 Verify to ensure that all construction/ installation activities have been completed 3 Cable Installed, identified, dressed and secured, cable rack / tray segregation and bending radius as per project specifications and design. Verify and confirm single core cables are using trefoil clamps, cable gland and gland plate made of nonmagnetic material 4 Verify cable type and size in accordance with cable schedule 5 Cable gland type and size in accordance with Cable schedule. Confirm that barrier glands are installed where required 6 Verify Gland & Lug are properly installed. Refer to manufacturer’s recommendation as required 7 Verify and confirm terminations are tight. Record torque if applicable 8 The cable insulation resistance is to be checked using a 500V megger. Each core is to be tested against all other cores and earth.
Test Point Insulation Resistance Remarks
R-YBNE Y-RBNE B-RYNE
9 The cable continuity to be tested using a suitable multi-meter, set to
ohms. Measured resistance to be compared with the datasheet value. Measured cable resistance ( ) Ohms. 10 Gland body to earth path resistance (Max 0.1 Ohm) 11 Cable joints, if any are completed, identified and the location is marked in cable schedule and relevant layout drawings. 12 Buried/underground sections of cables are properly marked using cable markers as per project specifications. 13 heck and confirm all related red line markings are completed. 14 Record any defects/shortcomings in the system punch-list. 15 Verify no dust inside enclosure /cabinet / panel and insulation surfaces are clean. JX NIPPON OIL & GAS EXPLORATION
INSPECTION TEST RECORD (ITR) - A
LOW VOLTAGE CABLE E25-A
16 Verify Instruments & its accessories /electrical equipment/panel externally clean. COMMENT(S) AND ADDITIONAL INFORMATION
COMPLETED BY VERIFIED BY ACCEPTED BY
DESIGNATION DESB Representative NIPPON Inspector Discipline Engineer COMPANY JX NIPPON JX NIPPON NAME SIGNATURE DATE