EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3, MESAIEED

TITLE: CONDUIT & FITTINGS INSTALLATION CHECKLIST

DOC NO. EI-E/006 CONTRACT NO. GC12105200


PROJECT NO. SYSTEM/SUB-SYSTEM NO.
MANUFACTURER TYPE
LOCATION DRAWING NO.
ITEM CHECKLIST DESCRIPTION RESULT REMARKS

1 Conduit material/accessories as per project specification


Surface mounted conduits shall be laid in straight lines with neat bends &
2
sets permits ease drawing in cables

3 No conduit shall have more than two right angle bends without a draw-in box

Conduit shall be installed in accordance with manufacturer's installation


4
instructions
5 All conduits shall be installed with fish wires to permit ease of wiring

6 Conduits arranged such that running couples are minimum


Conduits shall be fastened with heavy duty spacing saddles fixed at intervals
7
not exceeding 1.2m
Check if underground conduit bending radius not less than cable
8
manufacturer bending radius.
9 Check if underground conduit is not less than 2 inch diameter

10 Check if underground conduit rising from ground has concrete encasement

11 Proper sockets/bushes shall be provided for conduit entry to enclosures.

12 Cables shall run in conduit with min space factor of 40%


Damaged coating shall be properly repaired with protective paint as per
13
project specifications.
All metallic conduit couplings/joints shall be properly repaired with protective
14
paint as per project specifications.
15 Conduit in plaster/concrete shall be secured by holdfasts or crampits

Remarks:-

Dopet Construction Dopet QA/QC QP


Name
Position
Signature
Date
DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 17 OF 29