CONSTRUCTION OF SEA WATER DESALINATION STATION AT ZARAT

HAVING A CAPACITY OF 50 000m 3 /day EXPANDABLE TO 100 000 m 3 /day

GEOMETRIC SURVEY REPORT

REFERENCE TO CODE: PAGE OF

AREA:
STRUCTURE/MEMBER:
DRAWING Reference:

Anchor bolts/Embedded
Blinding Footings Pedestals Columns Shims Slab/Roof Others
plates/Openings

1 – Coordinates
Northing Easting
No.
Actual As per DWG. Diff. Tolerances Actual As per DWG. Diff. Tolerances

2 – Elevation
Concrete Anchor Bolts/Embedded Plates/Openings
No.
Actual As per DWG. Diff. Tolerances Actual As per DWG. Diff. Tolerances

NOTES:

QC CIVIL Contractor QC Mechanical AT SONEDE


SUBCONTRACTOR SUBCONTRACTOR

NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE

Date Date Date Date

Form code: CV.0003.ITR.0001