Lightning Protection System Installation Works

Inspection Checklist

KHABAT THERMAL POWER Ministry of Electricity (MOE) of Kurdistan


Project Name Owner Name Regional Government
PLANT UNITS 1&2

POSCO ENGINEERING & GAMA POWER SYSTEMS


Contractor Main Subcontractor
CONSTRUCTION CO., LTD. ENGINEERING & CONTRACTING INC.

Item Name / Item No Lightning Protection System


Area / Unit
/ Description Installation
ITP No KP-00+++-CQ712-B7702 ITP Item
Report No Date
Drawing No Rev.0

Approximate Date/Time of Pouring Concrete:

No. ITEM DESCRIPTION BÜKEM GAMA

1 Visual check of materials.

2 Check the installed down-conductor wire is visually proper.

Check that all dimensioning of down-conductor and clamps as per the approved
3
attached drawing are followed while implementation.

Check that all joints are properly fix as per the typical installation details attached with
4
the inspection checklist.

Check that connections are properly for the down-conductor connects the air terminals
5
to the grounding system.

Remarks / Comments