Inspection and Test Plan (ITP) – Grounding Works

Contractor Name: SUMEC COMPLETE


EQUIPMENT AND ENGINEERING CO., Grounding Works Inspection and Approval
LTD. Sheet
ITP Section No.: 1.0 Civil ( ), 2.0 Structural Steel ( ), 3.0 Architecture ( ), 4.0 Equipment ( ), 5.0 Piping ( ), 6.0 Storage Tank ( ), 7.0 Electrical ( / ),
8.0 Instrument/Automation ( ), 9.0 Security Fence ( ) & CCTV System ( ), 10.0 Landscaping ( ) & Plantation ( )
Xx.0 Add section if any others work scope in contract and then the section number can be re-adjusted.

ITP Section Inspection/Test Stage Requirement and Inspection Scope of Inspection Inspection Record
Acceptance Frequency Form No.
Contractor Client and OE Third Parties
Criteria

1 Verify grounding Conductor free of grease, Visual Inspection I W/R


electrode system dirt and corrosion.
materials are in Absence of damages.
accordance with Proper Ground rod length
specifications and resistant to
and drawings corrosion.
2 Verify Comply with approved for Visual and Dimensional I I/R/S
buried/above construction plan Inspection
ground grounding
system conductors
between
equipments, steel
structure and
grounding
electrode are
installed, routed
including elevation
in accordance to
specifications and
drawings
3 Verify Proper connection with Visual Inspection I S/R
grounding bolt, clamp, exothermic
connection tight welds executed
and as per according to instruction
specifications manual.
and drawings
4 Testing and Comply with approved for ≥ 0.5 Ω I I/W Calibration
Inspection of construction plan and Certificate of Earth
Bonding and specifications Resistance Tester
Grounding
Systems

Inspection Legend Notes:


1. ITP Section Numbers for example but not to limited:
Client = Nuevo Solar Energy Corporation
1.0 Civil 2.0 Structural Steel
OE = RINA Tech Singapore Pte Ltd.
3.0 Architectural 4.0 Equipment
Contractor = SUMEC Complete Equipment and Engineering Co.,
Ltd. 5.0 Piping 6.0 Storage Tank
I = Inspection 7.0 Electrical 8.0 Instrument/Automation
T = Test 9.0 Security, Fence & CCTV System 10.0 Landscaping & Plantation
Add other section(s) per Works in scope of work in the contract as necessary.
R = Review
S = Spot witness and random check (Notification of authorized 2. Scope of Inspection:
inspection personnel required) Contractor QC : Construction / Supplies / Services Contractor.
W = Witness (Notification of authorized inspection personnel Client Site QC : Surveillance, Witness & testing of contractors work scopes
required)
H = Hold (Mandatory, do not proceed without presence of
authorized inspection personnel or signed waiver)