Distribution Panel Checklist QC-143

CONTRACT# CLIENT / PROJECT SYSTEM

JOB# CWP

CLIENT REF:
Mark “N/A” where Not Applicable
NAMEPLATE DATA:
Tag Number Mounting Location:
Manufacturer: Model Number:
Serial Number: Type:
Enclosure Rating: Accessories:
Drawing and Rev # Nameplate Agrees with Single Line: [ ]Y [ ]N
Rating: Volts: Amps: Phases: Wires: CSA: [ ]Y [ ]N
INSPECTIONS:
Inspection To Be Performed Result Comments:
Panel installed to specifications and CEC
Conduit System Complete
Wiring System Complete
Breaker / Fuse sizes checked to drawings
Panel directory completed / installed
Ground Bus & Grounding complete
Branch circuits complete, terminated, verified & labeled
Panel fillers installed
Panel Overall Condition
All cable tags installed and are correct
Panel tags installed and are correct
Covers / Doors in place
Any isolated grounds as per Project Specifications
Spare knockouts filled
Panel cleaned
Phase & Neutral Bus & Wire(s) correct size
Wire color codes as per project specifications
Sealed Enclosure?: Seals Packed / Poured [ ]Y [ ]N
TORQUE Line Lugs torqued to: [ ] Ft-Lbs [ ] In-Lbs Test Equipment Log:
INSULATION RESISTANCE TEST Test Equipment Log:
(Megger Phase to All Other Phases & Ground) Megger Across Main CB
Test A Line - B Line - C Line -
Device Type Phase A Phase B Phase C Neutral
Voltage Load Load Load
Bus (Main CB Closed if Equipped) --- --- ---
Main CB (CB Open) --- --- --- ---
Main CB (CB Closed) --- --- --- ---
Duration of test is 60 sec unless otherwise specified by Project Specifications Megger readings in Gig Ohms
COMMENTS:

INSPECTED BY CHEMCO CLIENT OTHER


NAME: NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

Revision 2 April 1, 2005 QC-143 R2 Distribution Panel Checklist.doc Page 1 of 1