QC-195F
Storage Tank
CONTRACT# CLIENT / PROJECT SYSTEM
JOB# CWP
CLIENT REF:
Inspected by
Item Checks Result
Initial Date
INSTALLATION
1 Ribbon anodes installed
2 Anodes header cable installed
3 Header cable to anode C-Tap connections
4 C-Tap connections mastic sealant applied
Header cable to anode C-Tap connections shrink sleeves
5
applied
6 Corrosometer probes installed
7 Temperature probes installed
8 Temporary magnesium ribbon anodes installed
Slotted CPVC monitoring pipe nylon rope & end caps
9
installed
10 CPVC monitoring pipe Nilex filter sock installed
11 Tank weld on tab installed
12 Tank negative lead connection installed
13 PVC conduit system for anodes installed to junction panel
PVC conduit system for corrosometer probes / temperature
14 probes / electrodes / temporary anodes installed to junction
panel
15 Tank center & perimeter identified
16 Teck cable installed between rectifier & junction panel
17 Ribbon anode spacing
18 Remove plastic bags from cells
19 As-Built complete
20
Designation:
Inspected by
Checks Result
Initial Date
SOIL RESTIVITY TESTS
Test Equipment ID: Ω-cm
CORROSOMETER
Test Equipment ID:
Corrosometer P1 (Mag Connected)
Corrosometer P2 (Mag Connected)
Corrosometer P1 (Baseline Reading)
Corrosometer P2 (Baseline Reading)
Designation:
TANK TO GRID
Test Equipment ID:
Tank to grid circuit resistance Ω Ω
TEMPERATURE PROBE
Test Equipment ID:
Temperature Probe P1 (microvolts) µV µV
COMMENTS: