End of Job Checklist QC-109

CONTRACT# CLIENT / PROJECT SYSTEM

JOB# CWP

CLIENT REF:

INSPECTION Pass / Fail Remarks

All equipment is approved for the location it is in:


Weather protection [ ]
1.
Hazardous Location [ ]
Corrosion [ ]
2. Equipment is properly supported
3. Grounding & bonding is to CEC and project standards
4. Required gaskets and covers are in place
5. All openings are properly closed / sealed
6. All required seals are in place
7. All required cable connectors are packed
8. All required drains are in place
9. Cable bends are sufficient
10. Conduit bends are sufficient
11. Cables & conduits properly secured / supported
12. Cable / flex connectors are tight
13. Cable spacing is correct
14. Voltage barriers are observed / installed
15. All equipment is labeled
16. General workmanship is acceptable
17. The ITP has been followed
18. As-Builts are complete
19.
20.
COMMENTS:

CRAFT FOREMAN Superintendent


NAME: NAME: NAME:
SIGNATURE: SIGNATURE: SIGNATURE:
DATE: DATE: DATE:
Revision 0 March 11, 2004 QC-109 R0 End of Job Checklist Page 1 of 1