All equipment is approved for the location it is in:
Weather protection [ ] 1. Hazardous Location [ ] Corrosion [ ] 2. Equipment is properly supported 3. Grounding & bonding is to CEC and project standards 4. Required gaskets and covers are in place 5. All openings are properly closed / sealed 6. All required seals are in place 7. All required cable connectors are packed 8. All required drains are in place 9. Cable bends are sufficient 10. Conduit bends are sufficient 11. Cables & conduits properly secured / supported 12. Cable / flex connectors are tight 13. Cable spacing is correct 14. Voltage barriers are observed / installed 15. All equipment is labeled 16. General workmanship is acceptable 17. The ITP has been followed 18. As-Builts are complete 19. 20. COMMENTS:
CRAFT FOREMAN Superintendent
NAME: NAME: NAME: SIGNATURE: SIGNATURE: SIGNATURE: DATE: DATE: DATE: Revision 0 March 11, 2004 QC-109 R0 End of Job Checklist Page 1 of 1