You are on page 1of 6

QA/QC Checklist - Installation of SMDB Panel Boards

Project Name: KAP2E2


Project Number: 134/15/53/1 Document No.: KAP2E2-MS-ELC-GEN-3008-0
Site Number: Applicable for all sites Bldg. Name/Location: Reference IR #:
Building Number: Applicable for all buildings Weather Condition: Date of Inspection:
Note: During the consultant inspection, the checklist will be checked based on IR highlighted activity.
ATTACHMENT: 12.5 Acceptance Criteria Remarks
S/N Description of works to be checked/ inspected BEC QA/QC Engineer NKY Engineer/Inspector
Pass Fail NA Initial Pass Fail NA Initial
A Material Inspection
Ensure that all materials delivered to site for SMDB, fittings, and
A1
accessories are as per approved material submittals.
Ensure that all materials delivered are stored in proper storage area as per
A2
manufacturer’s recommendation.
B Installation Requirements – SMDB, Panel Boards
Check Panels for any physical damage and proper connection in
B1
accordance with single line diagram.
Check and ensure proper tool & equipment’s are used on Panel Board
B2
during installation.
Check & ensure metal panel board cabinets must be connected to an
B3
equipment grounding conductor.
Check & ensure the installation height of panel board from finished floor
B4
level.
C Installation requirements – SMDB Panel Boards
During installation use adequate amount of tools and materials for proper
C1
installation.

QA/QC Checklist: Installation SMDB PANEL BOARD– KAP2E2-MS-ELEC-GEN-3008-0 OCT 2017


1
QA/QC Checklist - Installation of SMDB Panel Boards
Project Name: KAP2E2
Project Number: 134/15/53/1 Document No.: KAP2E2-ELC-GEN-3008-0
Site Number: Applicable for all sites Bldg. Name/Location: Reference IR #:
Building Number: Applicable for all buildings Weather Condition: Date of Inspection:
Note: During the consultant inspection, the checklist will be checked based on IR highlighted activity.
ATTACHMENT: 12.5 Acceptance Criteria
BEC QA/QC Engineer NKY Engineer/Inspector
Remarks
S/N Description of works to be checked/ inspected Pas Fail NA Initial Pas Fail NA Initial
s s
Install the panel boards in accordance with the manufacturer’s
C2
recommendation.
C3 Never pull cable into the conduits that’s already filled with wires/cables.
C4 Ensure that all panels’ boards to be installed are new.
Where raceways enter a switchboard, floor-standing panel board, or
C5 similar enclosure, the raceways (including end fittings) must not rise more
than 3 in. above the bottom of the enclosure
C6 Any unused openings for circuit breakers and switches must be closed 
You must provide each panel board with overcurrent protection. Locate
the overcurrent protection device (OCPD) within, or at any point on the
C7
supply side of, the panel board. The rating of this overcurrent protective
device must not exceed that of the panel board.
C8 The enclosures (cabinets) for panel boards must prevent moisture or

QA/QC Checklist: Installation SMDB PANEL BOARD– KAP2E2-MS-ELEC-GEN-3008-0 OCT 2017


2
QA/QC Checklist - Installation of SMDB Panel Boards
water from entering or accumulating within the enclosure, and they must
be weatherproof when used in a wet location. When the enclosure is
surface mounted in a wet location, the enclosure must be mounted with
at least 1⁄4 in. air space between it and the mounting surface.
Each neutral conductor within a panel board must terminate to an
C9 individual terminal — that is, don't put two neutrals on the same
termination point.
Be sure to fill out panel directories accurately, legibly, and with sufficient
C10 detail to aid emergency personnel in situations where every second
counts.

QA/QC Checklist - Installation of SMDB Panel Boards


Project Name: KAP2E2
Project Number: 135/15/53/1 Document No.: KAP2E2-MS-ELC-GEN-3008-0
Site Number: Applicable to all sites Bldg. Name/Location: Reference IR #:
Building Number: Applicable to all buildings Weather Condition: Date of Inspection:
Note: During the consultant inspection, the checklist will be checked based on IR highlighted activity.
ATTACHMENT: 12.5 Acceptance Criteria Remarks
S/N Description of works to be checked/ inspected BEC QA/QC Engineer NKY Engineer/Inspector
Pass Fail NA Initial Pass Fail NA Initial
D Testing and Commissioning – SMDB Panel Board
D1 Be sure to fill out panel directories accurately, legibly, and with
sufficient detail to aid emergency personnel in situations where every

QA/QC Checklist: Installation SMDB PANEL BOARD– KAP2E2-MS-ELEC-GEN-3008-0 OCT 2017


3
second counts.
D2 Be sure to fill out panel directories accurately, legibly, and with
sufficient detail to aid emergency personnel in situations where every
second counts.
D3 Be sure to fill out panel directories accurately, legibly, and with
sufficient detail to aid emergency personnel in situations where every
second counts.
D5 Panel is ready for energisation when results for above steps (i) through
(iii) are OK. Arrange to “Turn ON” respective Feeder in Upstream Panel
while keeping receiving end incoming breaker at “OFF” position.
D6 Note and record instruments reading in record book.
D7 Pad Lock receiving end Panel Incoming circuit breaker in “OFF” position
and return key to Administrator who will keep key inside designated
Key Box (Kept inside LV Switch Room).
D8 To minimize unnecessary shutdown and or deprive others the chance
to access the “Upstream” panel, all work including cable laying and
terminations away from “Upstream” panel have to be completed prior
to application for PTW.
Thoroughly clean area in front and around “energized” panel to ensure
cleanliness and area free from any conducting materials. Arrange and
lay approved rubber mat around “energized” panel.
D9 Physically inspect each length of cable laid from “upstream” panel to
each sub-system like MDBs, SMDBs, Lift and Escalator, AHUs etc. are
properly terminated and free from cable skirmishes that require repair
work. Once completed proceed to step (iii) to completion.
D10 Withdraw men and equipment/s from Site and return PTW (Declare
Panel/Switchboard is “Complete” and No “further” Addition/Alteration
is required) when you are satisfied with the work executed for
“Cancellation”.
D11 Arrange a Final Inspection for “Complete” Panel/Switchboard.

QA/QC Checklist: Installation SMDB PANEL BOARD– KAP2E2-MS-ELEC-GEN-3008-0 OCT 2017


4
NKY Engineer’s Final Remarks:

QA/QC Checklist - Installation of SMDB Panel Boards


Project Name: KAP2E2
Project Number:
Site Number: Applicable for all sites Bldg. Name/Location: Reference IR #:
Building Number: Applicable for all buildings Weather Condition: Date of Inspection:
Note: During the consultant inspection, the checklist will be checked based on IR highlighted activity.
ATTACHMENT: 12.5 Acceptance Criteria
BEC QA/QC Engineer NKY Engineer/Inspector Remarks
S/N Description of works to be checked/ inspected
Pass Fail NA Initial Pass Fail NA Initial

BEC QA/QC Engineer/ Inspector NKY Representative


Name:Eng: Mohammed Mekawy Name:
Position:Site Engineer Position:
Signature: Date: 19-02-2018 Signature: Date:

QA/QC Checklist: Installation SMDB PANEL BOARD– KAP2E2-MS-ELEC-GEN-3008-0 OCT 2017


5
QA/QC Checklist: Installation SMDB PANEL BOARD– KAP2E2-MS-ELEC-GEN-3008-0 OCT 2017
6