DISCIPLINE Total Planned Approved /Noted Resubmitted for info Rejected Under review

MISK CITY SCHOOL CAMPUS - PHASE 1 Total Estimate : General 0 Err:502 Err:502 Err:502 Err:502 Err:502
Total Documents Submission to V3 22 Structural 0 Err:502 Err:502 Err:502 Err:502 Err:502
Total Under Review for Approval : UR 2 Method statement Log GEO-Tech 0 Err:502 Err:502 Err:502 Err:502 Err:502
Total : Re-Submitted : Code 'C' 1 Mechanical 0 Err:502 Err:502 Err:502 Err:502 Err:502
Total : Approved or Approved as noted 'A' or 'B' : 20 ELECTRICAL 0 Err:502 Err:502 Err:502 Err:502 Err:502
Rejected 'D' : 0 Civil 48 Err:502 1 Err:502 Err:502 2
for Record 'E' : 0 As of : 11-Sep-21 Architectural 25 0 Err:502 0 0
TOTAL 73 Err:502 Err:502 Err:502 Err:502 Err:502
DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY

MISK CITY SCHOOL CAMPUS - PHASE 1 (Project)


Document Planned
Sr# Aconex / Reference No Discipline Category ITP / Method statement Document Description Submission Status Ist Submittal (Rev 00) 2nd Submittal (Rev 01) 3rd Submittal (Rev 02)
Type Date
Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration

Filter

Method
1 MC-PH01-P04-06A03-SAB-MTS-CIV-000001 Civil CIV Method Statement for Mobilization 08-Mar-21 Closed 08-Mar-21 03-Apr-21 A
Statement
Method
2 MC-PH01-P04-06A03-SAB-MTS-CIV-000002 Civil CIV Method Statement for Excavation and Backfilling, Earthworks 08-Mar-21 Closed 08-Mar-21 09-Mar-21 B 01-Apr-21 03-Apr-21 B
Statement
Method
3 MC-PH01-P04-06A03-SAB-MTS-CIV-000003 Civil CIV Method Statement for Reinforced Concrete Works,Blinding 01-Apr-21 Closed 01-Apr-21 03-Apr-21 B
Statement
Method
4 MC-PH01-P04-06A03-SAB-MTS-CIV-000004 Civil CIV Method Statement for Rebar Works 01-Apr-21 Closed 01-Apr-21 03-Apr-21 B
Statement
Method
5 MC-PH01-P04-06A03-SAB-MTS-CIV-000005 Civil CIV Method Statement for Bitumen Paint for Concrete & Masonry Surfaces 01-Apr-21 Closed 01-Apr-21 03-Apr-21 B
Statement
Method
6 MC-PH01-P04-06A03-SAB-MTS-CIV-000006 Civil CIV Method Statement for Anti Termite Treatment 01-Apr-21 Closed 01-Apr-21 03-Apr-21 B
Statement
Method
7 MC-PH01-P04-06A03-SAB-MTS-CIV-000007 Civil CIV Method Statement for Resin Epoxy Anchoring and Fixing 10-Apr-21 Closed 10-Apr-21 11-Apr-21 B
Statement
Method Statement for Concrete Repair Works & Bending Of Method
8 MC-PH01-P04-06A03-SAB-MTS-CIV-000008 Civil CIV 11-Apr-21 Closed 11-Apr-21 14-Apr-21 B
Reinforcement Bars Statement
Method
9 MC-PH01-P04-06A03-SAB-MTS-CIV-000009 Civil CIV RAMS for Gypsum Board Wall Partitions and Ceiling 21-Apr-21 Closed 11-May-21 12-May-21 B
Statement
Method
10 MC-PH01-P04-06A03-SAB-MTS-CIV-000010 Civil CIV RAMS for Suspended Slab & Slab on Grade 21-Apr-21 Closed 26-Apr-21 27-Apr-21 C 03-May-21 05-May-21 B
Statement
Method
11 MC-PH01-P04-15A02-SAB-MTS-CIV-000001 Civil CIV RAMS for Geotechnical Investigation by GECO 21-Apr-21 Open 02-May-21 04-May-21 B
Statement
Method
12 MC-PH01-P04-06A03-SAB-MTS-CIV-000011 Civil CIV Method Statement for Non Shrink Grout applications 28-Apr-21 Closed 03-May-21 08-May-21 B
Statement
Method
13 MC-PH01-P04-06A03-SAB-MTS-CIV-000012 Civil CIV Method Statement for Cmu / Concrete Masonary units BlockWorks 01-May-21 Closed 06-May-21 5/10/2021 B
Statement
Method
14 MC-PH01-P04-06A03-SAB-MTS-CIV-000013 Civil CIV Method Statement for Housekeeping and enabling works 28-Apr-21 Open 06-May-21 12-May-21 B
Statement
Method
15 MC-PH01-P04-06A03-SAB-MTS-CIV-000014 Civil CIV Method Statement for Internal Plaster 01-May-21 Open 06-May-21 12-May-21 B
Statement
Method
16 MC-PH01-P04-06A03-SAB-MTS-CIV-000015 Civil CIV Method Statement for External Plaster 15-May-21 Open 06-May-21 12-May-21 B
Statement
Method Statement for Gypsum Board, Cement Board Wall Partitions and Method
17 MC-PH01-P04-06A03-SAB-MTS-CIV-000016 Civil CIV 15-May-21 Open 12-May-21 12-May-21 B
Ceiling Statement
Method
18 MC-PH01-P04-06A03-SAB-MTS-CIV-000017 Civil CIV RAMS for Aggregate Crushing 15-May-21 Open 12-May-21 12-May-21 B
Statement
Method
19 MC-PH01-P04-06A03-SAB-MTS-CIV-000018 Civil CIV Method Statement for Screed on slabs 30-May-21 Closed 17-May-21 17-May-21 B
Statement
Method UR
20 MC-PH01-P04-06A03-SAB-MTS-CIV-000019 Civil CIV Method Statement for Application of Joint Sealants 30-May-21 Open 22-May-21
Statement
Method B
21 MC-PH01-P04-06A03-SAB-MTS-CIV-000020 Civil CIV Method Statement for Epoxy Flooring and Skirting 30-May-21 Closed 24-May-21 29-May-21
Statement
Method
22 MC-PH01-P04-06A03-SAB-MTS-CIV-000021 Civil CIV Risk Assessment and Method Statement (RAMS) - Staircase construction 30-May-21 Open 29-May-21 UR
Statement
Method
23 Civil CIV Method Statement for Concrete Finish (Self Levelling) 01-Jun-21 Not Submitted
Statement
Method
24 Civil CIV Method Statement for Ceramic & Porcelain Walls & Floor Tiles works 03-Jun-21 Not Submitted
Statement
Method
25 Civil CIV Method Statement for Asphalt Works 06-Jun-21 Not Submitted
Statement
Method
26 Civil CIV Method Statement for excavation and bacfilling for underground utilities 07-Jun-21 Not Submitted
Statement
Method
27 Civil CIV Method Statement for Stone Flooring (Marble/ Granite) Works 08-Jun-21 Not Submitted
Statement
Method
28 Civil CIV Method Statement for Stone cladding for Walls. 09-Jun-21 Not Submitted
Statement
Method
29 Civil CIV Method Statement for Acoustic False Ceiling 12-Jun-21 Not Submitted
Statement
Method
30 Civil CIV Method Statement for Painting Works 13-Jun-21 Not Submitted
Statement
Method
31 Architectural ARC Method Statement for Aluminium Doors and Windows 14-Jun-21 Not Submitted
Statement
Method
32 Civil CIV Method Statement for Structural Steel fabrication Works 16-Jun-21 Not Submitted
Statement
Method
33 Civil CIV Method Statement for Roof waterproofing of Buildings 19-Jun-21 Not Submitted
Statement
Method
34 Architectural ARC Method Statement for Metal Doors & Frames installation 20-Jun-21 Not Submitted
Statement
Method
35 Architectural ARC Method Statement for Wooden Doors & Frames 21-Jun-21 Not Submitted
Statement
Method
36 Architectural ARC Method Statement for Folding Doors & Reveals installation 22-Jun-21 Not Submitted
Statement
Method
37 Architectural ARC Method Statement for Doors Hardware 23-Jun-21 Not Submitted
Statement
Prepared By : PJT Control Deprt. (Sr.Doc.Controller) Page 1 of 14
MISK CITY SCHOOL CAMPUS - PHASE 1 Total Estimate : General 0 Err:502 Err:502 Err:502 Err:502 Err:502
Total Documents Submission to V3 22 Structural 0 Err:502 Err:502 Err:502 Err:502 Err:502
Total Under Review for Approval : UR 2 Method statement Log GEO-Tech 0 Err:502 Err:502 Err:502 Err:502 Err:502
Total : Re-Submitted : Code 'C' 1 Mechanical 0 Err:502 Err:502 Err:502 Err:502 Err:502
Total : Approved or Approved as noted 'A' or 'B' : 20 ELECTRICAL 0 Err:502 Err:502 Err:502 Err:502 Err:502
Rejected 'D' : 0 Civil 48 Err:502 1 Err:502 Err:502 2
for Record 'E' : 0 As of : 11-Sep-21 Architectural 25 0 Err:502 0 0
TOTAL 73 Err:502 Err:502 Err:502 Err:502 Err:502
DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY

MISK CITY SCHOOL CAMPUS - PHASE 1 (Project)


Document Planned
Sr# Aconex / Reference No Discipline Category ITP / Method statement Document Description Type Submission Status Ist Submittal (Rev 00) 2nd Submittal (Rev 01) 3rd Submittal (Rev 02)
Date
Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration

Method
38 Architectural ARC Method Statement for Carpet/Carpet Tiles / Vinyl 24-Jun-21 Not Submitted
Statement
Method
39 Civil CIV Method Statement for Waterproofing Of Wet Areas. 26-Jun-21 Not Submitted
Statement
Method
40 Civil CIV Method Statement for Landscape Areas (Softscape) 27-Jun-21 Not Submitted
Statement
Method
41 Architectural ARC Method Statement for Installation Of Precast/Grc Cladding 28-Jun-21 Not Submitted
Statement
Method Statement for Planter, Plaza, Swimming Pool Water Proofing Method
42 Civil CIV 29-Jun-21 Not Submitted
Systems. Statement
Method
43 Civil CIV Method Statement for Structural Steel erection Works 03-Jul-21 Not Submitted
Statement
Method
44 Civil CIV Method Statement for Metal sheet Roofing Systems. 04-Jul-21 Not Submitted
Statement
Method
45 Architectural ARC Method Statement for Glass partitions and Glass works 05-Jul-21 Not Submitted
Statement
Method
46 Architectural ARC Method Statement for Kitchen Cabinets, Casework & Equipment 06-Jul-21 Not Submitted
Statement
Method
47 Civil CIV Method Statement for Polished Finish Aluminium Cladding 07-Jul-21 Not Submitted
Statement
Method
48 Civil CIV Method Statement for Wooden Composite Flooring for Junior Sports 08-Jul-21 Not Submitted
Statement
Method
49 Architectural ARC Method Statement for Vanity Top and Sanitary Fixtures 10-Jul-21 Not Submitted
Statement
Method
50 Architectural ARC Method Statement for Cabinets and Casework 11-Jul-21 Not Submitted
Statement
Method
51 Civil CIV Method Statement for Drainage & Gratings 12-Jul-21 Not Submitted
Statement
Method
52 Civil CIV Method Statement for Interlock Pavers, Curbstones 13-Jul-21 Not Submitted
Statement
Method
53 Civil CIV Method Statement for Traffic Marking 17-Jul-21 Not Submitted
Statement
Method
54 Architectural ARC Method Statement for installation of Wheel stopper in parking 18-Jul-21 Not Submitted
Statement
Method
55 Civil CIV Method Statement for Road Signages 19-Jul-21 Not Submitted
Statement
Method
56 Architectural ARC Method Statement for installation of corner guard in parking 20-Jul-21 Not Submitted
Statement
Method
57 Architectural ARC Method Statement for Metal Railing 24-Jul-21 Not Submitted
Statement
Method
58 Architectural ARC Method Statement for Curtain Wall System 25-Jul-21 Not Submitted
Statement
Method
59 Civil CIV Method Statement for GFRP Ladders / Works 27-Jul-21 Not Submitted
Statement
Method
60 Civil CIV Method Statement for Installation Pergolas 28-Jul-21 Not Submitted
Statement
Method
61 Architectural ARC Method Statement for Elevator Installation 29-Jul-21 Not Submitted
Statement
Method
62 Architectural ARC Method Statement for Installation for Tensile Fabric Panel 31-Jul-21 Not Submitted
Statement
Method
63 Architectural ARC Method Statement for Installation for Terracota 03-Aug-21 Not Submitted
Statement
Method
64 Architectural ARC Method Statement for Ceiling Timber Veneer Finish 04-Aug-21 Not Submitted
Statement
Method
65 Architectural ARC Method Statement for Illuminated Backlit 05-Aug-21 Not Submitted
Statement
Method
66 Architectural ARC Method Statement for Laminate Planel 07-Aug-21 Not Submitted
Statement
Method
67 Civil CIV Method Statement for Access Ladders to (ROOF) 08-Aug-21 Not Submitted
Statement
Method
68 Architectural ARC Method Statement for Fixed Furniture Installation / Joinery Works 09-Aug-21 Not Submitted
Statement
Method
69 Architectural ARC Method Statement for Installation of Sports Pitch 10-Aug-21 Not Submitted
Statement
Method
70 Architectural ARC Method Statement for Indoor/Outdoor Signage 11-Aug-21 Not Submitted
Statement
Method
71 Civil CIV Method Statement for Installation Of Garbage Chute 14-Aug-21 Not Submitted
Statement
Method
72 Civil CIV Method Statement for Installation Of Car Park Shade 15-Aug-21 Not Submitted
Statement
Method
73 Architectural ARC Method Statement for Joinery Teaching / Exploring Wall 16-Aug-21 Not Submitted
Statement

Prepared By : PJT Control Deprt. (Sr.Doc.Controller) Page 2 of 14


DISCIPLINE Total Planned Approved /Noted Resubmitted For info Rejected Under review
MISK CITY SCHOOL CAMPUS - PHASE 1 Total Estimate : General 0 0 0 0 0 0
Total Documents Submission to V3 19 Structural 0 0 0 0 0 0
Total Under Review for Approval : UR 7 Method statement Log GEO-Tech 0 0 0 0 0 0
Total :Re-Submitted : Code 'C' 4 Mechanical 0 0 0 0 0 0
Total : Approved or Approved as noted 'A' or 'B' : 12 ELECTRICAL 88 12 4 0 0 7
Rejected 'D' : 0 Civil 0 0 0 0 0 0
For Record 'E' : 0 As of : 11-Sep-21 Architectural 0 0 0 0 0 0
TOTAL 88 12 4 0 0 7
DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY

MISK CITY SCHOOL CAMPUS - PHASE 1 (Project)


Document Planned
Sr# Aconex / Reference No Discipline Category ITP / Method statement Document Description Type Submission Status Ist Submittal (Rev 00) 2nd Submittal (Rev 01) 3rd Submittal (Rev 02)
Date
Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration

Filter

MC-PH01-P04-06A03-SAB-MTS-ELE- Method
1 Electrical ELEC Method Statement Lightning Protection System 01-May-21 Closed 20-Apr-21 28-Apr-21 C 29-Apr-21 03-May-21 B
000001 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
2 Electrical ELEC Method Statement For Installation Of Diesel Generator Set 02-May-21 Closed 02-May-21 04-May-21 B
000002 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
3 Electrical ELEC Method Statement For Installation Of Pvc & Gi Conduits & Accessories 03-May-21 Closed 04-May-21 08-May-21 B
000003 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
4 Electrical ELEC Method Statement For Testing Of Lv Power Cables And Wires 04-May-21 Closed 05-May-21 09-May-21 C 17-May-21 19-May-21 B
000004 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method Statement For Low Voltage Lv Final Distribution Boards Method
5 Electrical ELEC 05-May-21 Closed 05-May-21 09-May-21 C 17-May-21 22-May-21 B
000005 Installation Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
6 Electrical ELEC RAMS for Installation of Exposed Conduits, Accessories and Boxes 06-May-21 Closed 05-May-21 09-May-21 B
000006 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
7 Electrical ELEC RAMS- Installation of Cable Tray, Trunking & Cable Ladder 07-May-21 Closed 06-May-21 22-May-21 B
000007 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
8 Electrical ELEC Method Statement For Installation Of Underground Duct Banks & Sleeves 20-Jul-21 Closed 08-May-21 10-May-21 B 19-May-21 UR
000008 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method Statement Dry Type Transformers (Low Voltage And Medium Method
9 Electrical ELEC 20-Nov-21 Open 29-May-21 UR
000009 Voltage) Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
10 Electrical ELEC Method Statement For Installation Of Light Fittings Interior 10-Nov-21 Closed 08-May-21 22-May-21 B
000010 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
11 Electrical ELEC Method Statement Fire Detection And Alarm Systems 30-Dec-21 Open 19-May-21 22-May-21 C
000011 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
12 Electrical ELEC Method Statement For Installation Automatic Transfer Switch 15-Dec-21 Closed 17-May-21 22-May-21 B
000012 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
13 Electrical ELEC Method Statement For Instalaltion Of Access Control System 15-Jan-22 Closed 22-May-21 29-May-21 B
000013 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
14 Electrical ELEC Method Statement For Installation & testing Of Clock Systems 01-Aug-21 Closed 22-May-21 24-May-21 B
000014 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
15 Electrical ELEC Method Statement For Testing And Commissioning Of Ups System 25-Mar-22 Open 22-May-21 UR
000015 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
16 Electrical ELEC Method Statement For Earthing & Bonding System Installation 20-Apr-21 Closed 24-May-21 27-May-21 B
000016 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
17 Electrical ELEC Method Statement Rmu System (Ring Main Unit System) 20-Feb-22 Open 29-May-21 UR
000017 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
18 Electrical ELEC Method Statement For Installation Of Audio Visual Systems 20-Nov-21 Open 29-May-21 UR
000018 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
19 Electrical ELEC Method Statement For Installation Of Video Surveillance(CCTV) 15-Dec-21 Open 29-May-21 UR
000019 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
20 Electrical ELEC Method Statement for Installation and testing of central battery system 30-May-21 Open
000020 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
21 Electrical ELEC Method Statement For Installation And Testing Of Wiring Accessories 01-Jun-21 Open
000021 Statement
MC-PH01-P04-06A03-SAB-MTS-ELE- Method
22 Electrical ELEC Method Statement For Installation of Communication Backbone Cabling 01-Jun-21 Open
000022 Statement
Method Statement For Installation of Medium Voltage Cables & Method
23 Electrical ELEC 03-Jun-21 Not Submitted
Accessories Statement
Method
24 Electrical ELEC Method Statement Grounding & Bonding 05-Jun-21 Not Submitted
Statement
Method
25 Electrical ELEC Method Statement Low Voltage Panelboard 07-Jun-21 Not Submitted
Statement
Method
26 Electrical ELEC Method Statement Testing of Central Battery System 08-Jun-21 Not Submitted
Statement
Method
27 Electrical ELEC Method Statement For Testing Of Public Address System 09-Jun-21 Not Submitted
Statement
Method
28 Electrical ELEC Method Statement for Testing of Dry Type Transformers 10-Jun-21 Not Submitted
Statement
Method
29 Electrical ELEC Method Statement For Installation of Medium Voltage Switchgear 12-Jun-21 Not Submitted
Statement
Method
30 Electrical ELEC Method Statement For Installation of Lighting Control System 14-Jun-21 Not Submitted
Statement
Method
31 Electrical ELEC Method Statement Below Grade Conduit And Duct Bank 16-Jun-21 Not Submitted
Statement
Method Statement Boxes (Junction, Terminal, And Pull) Wire Troughs, Method
32 Electrical ELEC 17-Jun-21 Not Submitted
And Wireways Statement
Method
33 Electrical ELEC Method Statement For Installation Of Lv Power Cables And Wires 20-Jun-21 Not Submitted
Statement
Method
34 Electrical ELEC Method Statement For Installation And Testing Of Wiring Accessories 21-Jun-21 Not Submitted
Statement
Method
35 Electrical ELEC Method Statement Stationary Direct Current (Dc) Systems 22-Jun-21 Not Submitted
Statement

Prepared By : PJT Control Deprt. (Sr.Doc.Controller) Page 3 of 14


MISK CITY SCHOOL CAMPUS - PHASE 1 Total Estimate : General 0 0 0 0 0 0
Total Documents Submission to V3 19 Structural 0 0 0 0 0 0
Total Under Review for Approval : UR 7 Method statement Log GEO-Tech 0 0 0 0 0 0
Total :Re-Submitted : Code 'C' 4 Mechanical 0 0 0 0 0 0
Total : Approved or Approved as noted 'A' or 'B' : 12 ELECTRICAL 88 12 4 0 0 7
Rejected 'D' : 0 Civil 0 0 0 0 0 0
For Record 'E' : 0 As of : 11-Sep-21 Architectural 0 0 0 0 0 0
TOTAL 88 12 4 0 0 7
DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY

MISK CITY SCHOOL CAMPUS - PHASE 1 (Project)


Document Planned
Sr# Aconex / Reference No Discipline Category ITP / Method statement Document Description Submission Status Ist Submittal (Rev 00) 2nd Submittal (Rev 01) 3rd Submittal (Rev 02)
Type
Date
Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration

Method
36 Electrical ELEC Method Statement Low Voltage Panelboard 23-Jun-21 Not Submitted
Statement
Method Statement For Installation Of Access control and intrusion Method
37 Electrical ELEC 26-Jun-21 Not Submitted
detection system Statement
Method
38 Electrical ELEC Method Statement For Installation of Final Distribution Boards 27-Jun-21 Not Submitted
Statement
Method
39 Electrical ELEC Method Statement For Installation Of Lighting Control System 29-Jun-21 Not Submitted
Statement
Method
40 Electrical ELEC Method Statement For Testing of Final Distribution Boards 30-Jun-21 Not Submitted
Statement
Method
41 Electrical ELEC Method Statement For Power Factor Correction Equipment 01-Jul-21 Not Submitted
Statement
Method
42 Electrical ELEC Installation Of Road Blocker And Gate Barrier 03-Jul-21 Not Submitted
Statement
Method Statement For Medium & Low Voltage Switchgear Testing And Method
43 Electrical ELEC 05-Jul-21 Not Submitted
Commissioning Statement
Method Statement For Medium Voltage Mv Power Cables & Accessories Method
44 Electrical ELEC 08-Jul-21 Not Submitted
Installation Statement
Method
45 Electrical ELEC Method Statement For Medium Voltage Mv Switchgear Installation 09-Jul-21 Not Submitted
Statement
Method
46 Electrical ELEC Method Statement Cable Tray, Fittings And Accessories 10-Jul-21 Not Submitted
Statement
Method Statement Low Voltage (Up To 1 Kv) Power Cable And Building Method
47 Electrical ELEC 12-Jul-21 Not Submitted
Wire Statement
Method Statement Medium Voltage Cable And Conductors (1.001 Kv To Method
48 Electrical ELEC 13-Jul-21 Not Submitted
35 Kv) Statement
Method
49 Electrical ELEC Method Statement High Voltage (35.001 Kv To 69 Kv) Cable 15-Jul-21 Not Submitted
Statement
Method
50 Electrical ELEC Method Statement For Above Grade Conduits, Fittings And Accessories 17-Jul-21 Not Submitted
Statement
Method
51 Electrical ELEC Method Statement For Bus Duct And Bus Bar Trunking Installation 18-Jul-21 Not Submitted
Statement
Method Statement For Installation Of Cable Raceways Trays Ladders & Method
52 Electrical ELEC 20-Jul-21 Not Submitted
Trunking Statement
Method
53 Electrical ELEC Method Statement For Installation Of Intrusion Detection 22-Jul-21 Not Submitted
Statement
Method
54 Electrical ELEC Method Statement Receptacles And Cord Connected Equipment 24-Jul-21 Not Submitted
Statement
Method
55 Electrical ELEC Central Battery System Cbs Installation Method Statement 25-Jul-21 Not Submitted
Statement
Method Statement For Mv / Lv Distribution Transformer Testing And Method
56 Electrical ELEC 27-Jul-21 Not Submitted
Commissioning Statement
Method
57 Electrical ELEC Method Statement For Installation Of Light Fittings Luminaries Exterior 28-Jul-21 Not Submitted
Statement
Method
58 Electrical ELEC Method Statement Electrical System Protection And Metering 29-Jul-21 Not Submitted
Statement
Method
59 Electrical ELEC Method Statement For Installation Of Audio Video Intercom System 30-Jul-21 Not Submitted
Statement
Method Statement For Installation Of Computer Networking L.A.N Method
60 Electrical ELEC 31-Jul-21 Not Submitted
Equpiment Statement
Method
61 Electrical ELEC Method Statement Low Voltage Switchgear And Switchboards 01-Aug-21 Not Submitted
Statement
Method
62 Electrical ELEC Method Statement For Installation Of Disable Refuge Intercom System 02-Aug-21 Not Submitted
Statement
Method Statement Fire/Jockey Water Pump/Motor/Controller (Low Method
63 Electrical ELEC 03-Aug-21 Not Submitted
Voltage) Statement
Method
64 Electrical ELEC Method Statement Variable Speed Drive (Vsd) Equipment 04-Aug-21 Not Submitted
Statement
Method
65 Electrical ELEC Method Statement Power Transformers (≥35 Kv Or >2.5 Mva) 05-Aug-21 Not Submitted
Statement
Methos Statement For Installation & Termination Of Lighting Poles And Method
66 Electrical ELEC 06-Aug-21 Not Submitted
Fixtures Statement
Method
67 Electrical ELEC Method Statement Communication Systems 07-Aug-21 Not Submitted
Statement
Method
68 Electrical ELEC Method Statement Telephone Systems, Intercom System And Accessories 08-Aug-21 Not Submitted
Statement
Method
69 Electrical ELEC Method Statement For Installation Of Enclosed Switches Isolators 09-Aug-21 Not Submitted
Statement
Method
70 Electrical ELEC Method Statement For Installation Of Flush Floor Trunking System 10-Aug-21 Not Submitted
Statement
Method Statement For Installation Of Mob, Smdb, Db, Mcc & Capacitor Method
71 Electrical ELEC 11-Aug-21 Not Submitted
Bank Statement
Method
72 Electrical ELEC Method Statement For Installation Of Mv / Lv Distribution Transformers 12-Aug-21 Not Submitted
Statement

Prepared By : PJT Control Deprt. (Sr.Doc.Controller) Page 4 of 14


MISK CITY SCHOOL CAMPUS - PHASE 1 Total Estimate : General 0 0 0 0 0 0
Total Documents Submission to V3 19 Structural 0 0 0 0 0 0
Total Under Review for Approval : UR 7 Method statement Log GEO-Tech 0 0 0 0 0 0
Total :Re-Submitted : Code 'C' 4 Mechanical 0 0 0 0 0 0
Total : Approved or Approved as noted 'A' or 'B' : 12 ELECTRICAL 88 12 4 0 0 7
Rejected 'D' : 0 Civil 0 0 0 0 0 0
For Record 'E' : 0 As of : 11-Sep-21 Architectural 0 0 0 0 0 0
TOTAL 88 12 4 0 0 7
DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY

MISK CITY SCHOOL CAMPUS - PHASE 1 (Project)


Document Planned
Sr# Aconex / Reference No Discipline Category ITP / Method statement Document Description Submission Status Ist Submittal (Rev 00) 2nd Submittal (Rev 01) 3rd Submittal (Rev 02)
Type
Date
Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration

Method
73 Electrical ELEC Method Statement For Installation Of Ups & Accessories 13-Aug-21 Not Submitted
Statement
Method
74 Electrical ELEC Method Statement Fiber Optic Communications Cable (Osp/Isp/Co) 14-Aug-21 Not Submitted
Statement
Method
75 Electrical ELEC Method Statement For Building Management System (Bms) 15-Aug-21 Not Submitted
Statement
Method Statement For Lighting Control System Testing And Method
76 Electrical ELEC 16-Aug-21 Not Submitted
Commissioning Statement
Method
77 Electrical ELEC Method Statement For Installation Of Lightning Protection System 17-Aug-21 Not Submitted
Statement
Method
78 Electrical ELEC Method Statement For Testing Of Lightning Protection System 18-Aug-21 Not Submitted
Statement
Method
79 Electrical ELEC Method Statement For Testing & Commissioning Of Diesel Generator Set 19-Aug-21 Not Submitted
Statement
Method
80 Electrical ELEC Method Statement For Testing & Commissioning Of Mv Power Cables 20-Aug-21 Not Submitted
Statement
Method Statement For Testing And Commissioning Of Mob, Smdb, Db, Method
81 Electrical ELEC 21-Aug-21 Not Submitted
Mcc & Capacitor Bank Statement
Method Statement For Testing And Commissioning Of Audio Visual Method
82 Electrical ELEC 22-Aug-21 Not Submitted
Systems Statement
Method
83 Electrical ELEC Method Statement For Testing And Commissioning Of Clock Systems 23-Aug-21 Not Submitted
Statement
Method Statement Wiring Devices And Motor Pump - Method
84 Electrical ELEC 24-Aug-21 Not Submitted
Receiving,Installation And Pre-Commissioning. Statement
Method
85 Electrical ELEC Central Battery System Cbs Testing & Commissioning 25-Aug-21 Not Submitted
Statement
Method
86 Electrical ELEC Method Statement For Bus Duct Testing & Commissioning 26-Aug-21 Not Submitted
Statement
Method
87 Electrical ELEC Method Statement for Rooflight 28-Aug-21 Not Submitted
Statement
Method
88 Electrical ELEC Method Statement for Hexagonal-Shaped Suspended Light Fixture 30-Aug-21 Not Submitted
Statement

Prepared By : PJT Control Deprt. (Sr.Doc.Controller) Page 5 of 14


DISCIPLINE Total Planned Approved /Noted Resubmit For info Rejected Under review
MISK CITY SCHOOL CAMPUS - PHASE 1 Total Estimate : General 0 0 0 0 0 0
Total Documents Submission to V3 13 Structural 0 0 0 0 0 0
Total Under Review for Approval : UR 4 Method statement Log GEO-Tech 0 0 0 0 0 0
Total :Re-Submitted : Code 'C' 1 Mechanical 69 9 1 0 0 4
Total : Approved or Approved as noted 'A' or 'B' : 9 ELECTRICAL 0 0 0 0 0 0
Rejected 'D' : 0 Civil 0 0 0 0 0 0
For Record 'E' : 0 As of : 11-Sep-21 Architectural 0 0 0 0 0 0
TOTAL 69 9 1 0 0 4
DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY

MISK CITY SCHOOL CAMPUS - PHASE 1 (Project)


Document Planned
Sr# Aconex / Reference No Discipline Category ITP/ Method statement Document Description Submission Status Ist Submittal (Rev 00) 2nd Submittal (Rev 01) 3rd Submittal (Rev 02)
Type
Date
Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration

Filter

MC-PH01-P04-06A03-SAB-MTS-MEC- Method Statement For Portable Water Piping (Inside And Outside Method
1 Mechanical MECH 01-Jun-21 Closed 05-May-21 17-May-21 B
000001 Building) Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method
2 Mechanical MECH Method Statement For Hot And Cold Service Insulation 01-Sep-21 Open 10-May-21 22-May-21 C
000004 Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method Statement For Installation & Testing Of Underground Drainage Method
3 Mechanical MECH 01-Oct-21 Closed 10-May-21 17-May-21 B
000003 Piping Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method
4 Mechanical MECH Method Statement For Irrigation Water Piping Works (U/G ) 05-Aug-21 Closed 18-May-21 22-May-21 B
000006 Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method
5 Mechanical MECH Method Statement For Hvac Metal Duct System 01-Sep-21 Closed 17-May-21 22-May-21 B
000005 Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method Statement For Installation And Pressure Testing Of Chilled Water Method
6 Mechanical MECH 01-Aug-21 Closed 19-May-21 22-May-21 B
000007 Piping & Accessories Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method
7 Mechanical MECH Method Statement For Oil Interceptors 01-Dec-21 Closed 20-May-21 22-May-21 B
000002 Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method
8 Mechanical MECH Method Statement For Installation Of Wet Riser Piping 25-Jun-21 Closed 25-May-21 29-May-21 B
000013 Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method Statement For Installation Of Acoustic Insulation Of Drainage Method
9 Mechanical MECH 01-Aug-21 Closed 25-May-21 27-May-21 B
000012 Pipes Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method
10 Mechanical MECH Method Statement For Plumbing Fixtures And Fittings 15-Aug-21 Closed 25-May-21 29-May-21 B
000009 Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method Statement For Installation & Testing Of Above Ground Drainage Method
11 Mechanical MECH 01-Oct-21 Open 23-May-21 UR
000010 Piping Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method Statement For Installation & Gravity Testing Of Condensate Drain Method
12 Mechanical MECH 20-Nov-21 Open 22-May-21 UR
000008 Piping System Statement
MC-PH01-P04-06A03-SAB-MTS-MEC- Method
13 Mechanical MECH RAMS Installation of Sleeves for mechanical services 25-Jun-21 Open 29-May-21 UR
000016 Statement
Method
14 Mechanical MECH Method Statement For Air-Handling Unit (Ahu) 01-Jun-21 Not Submitted
Statement
Method
15 Mechanical MECH Method Statement For Installation Of Hvac Fans 02-Jun-21 Not Submitted
Statement
Method
16 Mechanical MECH Method Statement For Domestic Water Pump 03-Jun-21 Not Submitted
Statement
Method
17 Mechanical MECH Method Statement For Hvac Metal Duct System 05-Jun-21 Not Submitted
Statement
Method
18 Mechanical MECH Method Statement For Installation Of Air Handling Unit Ahu/Fahu 07-Jun-21 Not Submitted
Statement
Method
19 Mechanical MECH Method Statement For Installation Of Sprinkler Piping System 08-Jun-21 Not Submitted
Statement
Method
20 Mechanical MECH Method Statement For Installation Of Fan Coil Units Fcu'S 09-Jun-21 Not Submitted
Statement
Method
21 Mechanical MECH Method Statement For Installation Of Water Heaters 10-Jun-21 Not Submitted
Statement
Method
22 Mechanical MECH Method Statement For Installation Of Domestic Water Piping System 13-Jun-21 Not Submitted
Statement
Method Statement For Installation Of Domestic Water Filteration Method
23 Mechanical MECH 14-Jun-21 Not Submitted
Equipment Statement
Method
24 Mechanical MECH Method Statement For Fire Fighting Pumps 15-Jun-21 Not Submitted
Statement
Method
25 Mechanical MECH Method Statement For Installation Of Foam System 16-Jun-21 Not Submitted
Statement
Method
26 Mechanical MECH Method Statement For Hydrostatic Testing Of On-Plot Piping 17-Jun-21 Not Submitted
Statement
Method
27 Mechanical MECH Method Statement For Installation Of Fans 20-Jun-21 Not Submitted
Statement
Method Statement For Installation Of Hvac Dampers, Vcd, Motorized Vcd Method
28 Mechanical MECH 22-Jun-21 Not Submitted
& Fire Dampers Statement
Method
29 Mechanical MECH Method Statement For Installation Of Sump Pumps 24-Jun-21 Not Submitted
Statement
Method
30 Mechanical MECH Method Statement For Air Balancing & Water Balancing With Test Sheets 26-Jun-21 Not Submitted
Statement
Method Statement For Installation Of Field Devices For Chiller Plant Method
31 Mechanical MECH 28-Jun-21 Not Submitted
Manager Statement
Method Statement For Installation Of Domestic Water Pumps (Transfer Method
32 Mechanical MECH 29-Jun-21 Not Submitted
And Booster) Statement
Method Statement For Valve And Valve Box Installation Inspection Method
33 Mechanical MECH 30-Jun-21 Not Submitted
(Buried And Exposed) Statement
Prepared By : PJT Control Deprt. (Sr.Doc.Controller) Page 6 of 14
MISK CITY SCHOOL CAMPUS - PHASE 1 Total Estimate : General 0 0 0 0 0 0
Total Documents Submission to V3 13 Structural 0 0 0 0 0 0
Total Under Review for Approval : UR 4 Method statement Log GEO-Tech 0 0 0 0 0 0
Total :Re-Submitted : Code 'C' 1 Mechanical 69 9 1 0 0 4
Total : Approved or Approved as noted 'A' or 'B' : 9 ELECTRICAL 0 0 0 0 0 0
Rejected 'D' : 0 Civil 0 0 0 0 0 0
For Record 'E' : 0 As of : 11-Sep-21 Architectural 0 0 0 0 0 0
TOTAL 69 9 1 0 0 4
DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY

MISK CITY SCHOOL CAMPUS - PHASE 1 (Project)


Planned
Sr# Aconex / Reference No Discipline Category ITP/ Method statement Document Description Document Status
Type Submission Ist Submittal (Rev 00) 2nd Submittal (Rev 01) 3rd Submittal (Rev 02)
Date
Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration

Method Statement For Through-The-Wall And Window-Mounted Air Method


34 Mechanical MECH 04-Jul-21 Not Submitted
Conditioners Statement

Prepared By : PJT Control Deprt. (Sr.Doc.Controller) Page 7 of 14


MISK CITY SCHOOL CAMPUS - PHASE 1 Total Estimate : General 0 0 0 0 0 0
Total Documents Submission to V3 13 Structural 0 0 0 0 0 0
Total Under Review for Approval : UR 4 Method statement Log GEO-Tech 0 0 0 0 0 0
Total :Re-Submitted : Code 'C' 1 Mechanical 69 9 1 0 0 4
Total : Approved or Approved as noted 'A' or 'B' : 9 ELECTRICAL 0 0 0 0 0 0
Rejected 'D' : 0 Civil 0 0 0 0 0 0
For Record 'E' : 0 As of : 11-Sep-21 Architectural 0 0 0 0 0 0
TOTAL 69 9 1 0 0 4
DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY

MISK CITY SCHOOL CAMPUS - PHASE 1 (Project)


Planned
Sr# Aconex / Reference No Discipline Category ITP/ Method statement Document Description Document Status
Type Submission Ist Submittal (Rev 00) 2nd Submittal (Rev 01) 3rd Submittal (Rev 02)
Date
Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration

Method
35 Mechanical MECH Method Statement For Split Airconditioning Unit - Multi Type 05-Jul-21 Not Submitted
Statement
Method Statement For Installation Of Grills Diffusers Disc Valves And Method
36 Mechanical MECH 06-Jul-21 Not Submitted
Louvers Statement
Method Statement For Installation Of Facility Indoor Portable Water Method
37 Mechanical MECH 07-Jul-21 Not Submitted
Storage Tanks Statement
Method
38 Mechanical MECH Method Statement For Water Storage Tanks (Fire, Potable & Grey) 08-Jul-21 Not Submitted
Statement
Method
39 Mechanical MECH Method Statement For Storm Drain Piping Works (Outside Buildings) 10-Jul-21 Not Submitted
Statement
Method
40 Mechanical MECH Method Statement For Water Storage Tanks (Fire, Potable & Grey) 11-Jul-21 Not Submitted
Statement
Method
41 Mechanical MECH Method Statement For Installation Of Hvac Packaged Units 12-Jul-21 Not Submitted
Statement
Method
42 Mechanical MECH Method Statement For Electric Water Heater 13-Jul-21 Not Submitted
Statement
Method
43 Mechanical MECH Flushing Of Chilled Water Piping 17-Jul-21 Not Submitted
Statement
Method
44 Mechanical MECH Method Statement For Installation Of Air Curtains 18-Jul-21 Not Submitted
Statement
Method
45 Mechanical MECH Method Statement For Installation Of Air Separators 19-Jul-21 Not Submitted
Statement
Method
46 Mechanical MECH Method Statement For Installation Of Air Cooled Chillers 20-Jul-21 Not Submitted
Statement
Method Statement For Installation Of Chilled Water Pressurization Unit & Method
47 Mechanical MECH 24-Jul-21 Not Submitted
Expansion Tank Statement
Method
48 Mechanical MECH Method Statement For Grills & Differs 25-Jul-21 Not Submitted
Statement
Method
49 Mechanical MECH Method Statement For Installation Of Closed Control Units Ccu 27-Jul-21 Not Submitted
Statement
Method Statement For Installation & Testing Of Domestic Water Piping Method
50 Mechanical MECH 28-Jul-21 Not Submitted
System Statement
Method
51 Mechanical MECH Chilled Water Cleaning Flushing & Chemical Treatment 29-Jul-21 Not Submitted
Statement
Method
52 Mechanical MECH Method Statement For Installation Of Centrifugal Fire Pumps 31-Jul-21 Not Submitted
Statement
Method Statement For Installation Of Refrigerant Piping Installation & Method
53 Mechanical MECH 03-Aug-21 Not Submitted
Pressure Testing Statement
Method
54 Mechanical MECH Method Statement For Chilled Water Pump 04-Aug-21 Not Submitted
Statement
Testing & Commissioning Of Chilled Water Pressurization Unit & Method
55 Mechanical MECH 05-Aug-21 Not Submitted
Expansion Tank Statement
Method
56 Mechanical MECH Testing & Commissioning Of Air Cooled Chillers 07-Aug-21 Not Submitted
Statement
Method
57 Mechanical MECH Testing & Commissioning Of Domestic Water Pumps 08-Aug-21 Not Submitted
Statement
Method
58 Mechanical MECH Testing & Commissioning Of Hvac Fans 09-Aug-21 Not Submitted
Statement
Method
59 Mechanical MECH Testing & Commissioning Of Fan Coil Units Fcu'S 10-Aug-21 Not Submitted
Statement
Method
60 Mechanical MECH Testing & Commissioning Of Fire Protection System 11-Aug-21 Not Submitted
Statement
Method
61 Mechanical MECH Testing & Commissioning Of Smoke Management System 14-Aug-21 Not Submitted
Statement
Method
62 Mechanical MECH Testing & Commissioning Of Variable Air Volumes Vav System 15-Aug-21 Not Submitted
Statement
Method
63 Mechanical MECH Testing & Commissioning Of Water Heater 16-Aug-21 Not Submitted
Statement
Method Statement For Installation, Testing & Commissioning Of Chilled Method
64 Mechanical MECH 18-Aug-21 Not Submitted
Water Hydronic Pumps Statement
Method
65 Mechanical MECH Testing & Commissioning Of Air Flow Control System & Venturi Valves 21-Aug-21 Not Submitted
Statement
Method
66 Mechanical MECH Testing & Commissioning Of Air Handling Units Ahu & Fahu 23-Aug-21 Not Submitted
Statement
Method Statement For Testing, Adjusting And Balancing (Tab) Of Hvac Method
67 Mechanical MECH 25-Aug-21 Not Submitted
Systems Statement
Method
68 Mechanical MECH Method Statement For Installation Of Sanitary Wares 28-Aug-21 Not Submitted
Statement

Prepared By : PJT Control Deprt. (Sr.Doc.Controller) Page 8 of 14


MISK CITY SCHOOL CAMPUS - PHASE 1 Total Estimate : General 0 0 0 0 0 0
Total Documents Submission to V3 13 Structural 0 0 0 0 0 0
Total Under Review for Approval : UR 4 Method statement Log GEO-Tech 0 0 0 0 0 0
Total :Re-Submitted : Code 'C' 1 Mechanical 69 9 1 0 0 4
Total : Approved or Approved as noted 'A' or 'B' : 9 ELECTRICAL 0 0 0 0 0 0
Rejected 'D' : 0 Civil 0 0 0 0 0 0
For Record 'E' : 0 As of : 11-Sep-21 Architectural 0 0 0 0 0 0
TOTAL 69 9 1 0 0 4
DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY DD/M/YYYY

MISK CITY SCHOOL CAMPUS - PHASE 1 (Project)


Planned
Sr# Aconex / Reference No Discipline Category ITP/ Method statement Document Description Document Status
Type Submission Ist Submittal (Rev 00) 2nd Submittal (Rev 01) 3rd Submittal (Rev 02)
Date
Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration Submitted Date Returned Date Action Code Duration

Method
69 Mechanical MECH Chlorinatin, Disinfection & Commissioning Of Domestic Water 30-Aug-21 Not Submitted
Statement

Prepared By : PJT Control Deprt. (Sr.Doc.Controller) Page 9 of 14


Sr# Aconex / Reference No

MC-PH01-P04-06A03-SAB-MTS-CIV-
1
000019
MC-PH01-P04-06A03-SAB-MTS-ELE-
2
000014
MC-PH01-P04-06A03-SAB-MTS-ELE-
3
000013
MC-PH01-P04-06A03-SAB-MTS-ELE-
4
000015
MC-PH01-P04-06A03-SAB-MTS-MEC-
5
000002
Discipline Category

Civil CIV

Electrical ELEC

Electrical ELEC

Electrical ELEC

Mechanical MECH
ITP / Method statement Document Description

Method Statement for Application of Joint Sealants

Method Statement For Installation & testing Of Clock Systems

Method Statement For Instalaltion Of Access Control System


Method Statement For Testing And Commissioning Of Ups
System
Method Statement For Oil Interceptors
Document Type Planned Submission Date

Method Statement 30-May-21

Method Statement 01-Aug-21

Method Statement 15-Jan-22

Method Statement 25-Mar-22

Method Statement 01-Dec-21


MISK CITY SCHOOL
CAMPUS - PHASE 1 (Project)
Status Ist Submittal (Rev 00)
Returned Date
Submitted Date Action Code

Open 22-May-21 UR

Open 22-May-21 UR

Open 22-May-21 UR

Open 22-May-21 UR

Open 20-May-21 UR