Properties Installation Check List For MEP Contractor (1804) MCC's & VFD's.
Locatio / Area : Verification Sign-off
S.No.Activities / Items to be Inspected Engineer QCI
Check the MCC's / VFD's installed have an 1 approved submittal.
2 Ensure the drawings used for installation are
correct and approved. Verify factory test roports and Consultant 3 approved factory witness certificate.
Inspect the concrete bases for suitability as per
4 drawings. In case of wall mounted panels, ensure the adequate supporting arrangement.
Inspect the MCC's upon receive at site and
5 ensure that the panel free from damages.
Ensure all indication lamps, meters and other
6 easily breakable items are undamaged.
Ensure adequate clearance around the panel
7 as approved shop drawings. Check the identification of the panel , incoming 8 and outgoing breakers as against approved shop drawings. All cables and wires are terminated and 9 identified.
10 Check the tigthness of all terminations.
Check the identification ferruling of internal
11 panel wiring as against approved drawings of the manufacturer. Check the interlock with other services are 12 provided as per approved drawing of the manufacturer and specification. Check the glanding and termination of the 13 cables ( Incoming and Outgoing ) and ensure the same are grounded.
Ensure that the panels are protected from
14 damages during the construction works. Final inspection for the complete installations as per specifications / approved submittals / 15 manufacturers instruction. Prior to DEWA ( Local Authoroty ) inspection