Burj Dubai - The Residences

Client :- Emmar Nasa Multiplex


Properties
Installation Check List For MEP
Contractor
(1804)
MCC's & VFD's.

Locatio / Area : Verification Sign-off

S.No.Activities / Items to be Inspected Engineer QCI


Check the MCC's / VFD's installed have an
1
approved submittal.

2 Ensure the drawings used for installation are


correct and approved.
Verify factory test roports and Consultant
3
approved factory witness certificate.

Inspect the concrete bases for suitability as per


4 drawings. In case of wall mounted panels,
ensure the adequate supporting arrangement.

Inspect the MCC's upon receive at site and


5
ensure that the panel free from damages.

Ensure all indication lamps, meters and other


6
easily breakable items are undamaged.

Ensure adequate clearance around the panel


7
as approved shop drawings.
Check the identification of the panel , incoming
8 and outgoing breakers as against approved
shop drawings.
All cables and wires are terminated and
9
identified.

10 Check the tigthness of all terminations.

Check the identification ferruling of internal


11 panel wiring as against approved drawings of
the manufacturer.
Check the interlock with other services are
12 provided as per approved drawing of the
manufacturer and specification.
Check the glanding and termination of the
13 cables ( Incoming and Outgoing ) and
ensure the same are grounded.

Ensure that the panels are protected from


14
damages during the construction works.
Final inspection for the complete installations
as per specifications / approved submittals /
15
manufacturers instruction. Prior to DEWA
( Local Authoroty ) inspection

Comments / Remarks, if any

ETA - QA/QC Engineer


Signature :

Name :

Date :