The document is a checklist for verifying the installation of an enclosed bus duct system at the Burj Dubai residences project in Dubai, with 13 items to inspect including checking that the material and drawings match approved submittals, the layout and support meet specifications, and testing insulation resistance and tightening all connections properly. An engineer and quality control inspector are required to sign off after verifying each item and the manufacturer must also certify the installation before final inspection.
The document is a checklist for verifying the installation of an enclosed bus duct system at the Burj Dubai residences project in Dubai, with 13 items to inspect including checking that the material and drawings match approved submittals, the layout and support meet specifications, and testing insulation resistance and tightening all connections properly. An engineer and quality control inspector are required to sign off after verifying each item and the manufacturer must also certify the installation before final inspection.
The document is a checklist for verifying the installation of an enclosed bus duct system at the Burj Dubai residences project in Dubai, with 13 items to inspect including checking that the material and drawings match approved submittals, the layout and support meet specifications, and testing insulation resistance and tightening all connections properly. An engineer and quality control inspector are required to sign off after verifying each item and the manufacturer must also certify the installation before final inspection.
MEP Installation Check List For Enclosed Contractor Bus Duct System (1804)
Locatio / Area : Verification Sign-off
S.No.Activities / Items to be Inspected Engineer QCI
1 Check the Material is as per approved submittal.
Check drawings used for installation are latest
2 and approved.
Check all material are new and undamaged.
Megger each length of busway before installation to check for possible damage of 3 contamination during shifting and storage. Check the layout, opening and elevations of the installed bus duct system as per approved 4 drawings.
Check the installation complies with the
5 manufacturer's instruction / drawings.
Check the supporting system and support
6 spacing as the approved drawings.
Check the continuity and insulation resistance
7 prior and after the installation.
Check all the nuts, bolts, screws etc. are tight
8 and secure. ( Torque 60-80 lbs) Check the installation of bus duct system is 9 coordinate with other services as required.
Check the earth bonding is provided as per
10 approved drawings. Check all joints are tightened with totque sensitive special bolts supplied by the 11 manufacturer using torque wrench. Manufacturer's representative to check and certify the installation, prior to consultant's 12 inspection.